Environment Sector

Environment Sector

Transport Sector Section 1 On-going projects (in implementation phase) Project duration Nr. Project title Total investment Grant/ Loan/ National Co- Project brief description (location included) (preparation+ (sector included) cost Source Source financimg implementation TRANSPORT Construction of motorway Kicevo- 598.000.000 EXIM 1. The length of the road is 57 km and is part of Corridor VIII. 2014-2023 PESR Ohrid € bank Construction of express road Stip- 2. The road section is in a length of 23.5 km. 2018-2021 45.020.000 € EBRD Radovis Construction of express road Stip- 3. The road section is divided in two sections with total length of 28 km. 2017-2021 51.000.000 € EBRD Krupiste-Kocani 15% Construction of the road section Construction of an express road in a total length of 15.5 km as part of branch X-D of IPA II 4. 2018-2022 28.000.000 € National Drenovo-Interchange Gradsko Corridor X (85%) budget Construction of express road Raec Construction of an express road in a total length of 10 km as part of branch X-D of 5. 2016-2022 45.000.000 € EBRD bridge-Drenovo (Faris gorge- Corridor X (Contract is terminated in September 2019) ConstructionDrenovo of gorge)express way 6. Kumanovo – border with Bulgaria The total length of the section is 23 km. 2018-2022 63.500.000 € WB (section Rankovci – Kriva Palanka) Rehabilitation of regional road 7. The road is with total length is 3.30 km. 2017-2019 1.113.000€ PESR Matejce – Lipkovo Construction of a bridge near Konjare 8. A bridge is being constructed over the river Pcinja. 2017-2021 1.100.000 € PESR (Petrovec) on state road R2136 Rehabilitation and reconstruction of The project includes the following road sections: 2018-2019- 22.000.000 9. EBRD 7 road sections Lot 1 Rehabilitation of the main road A3, the Kocani bend L = 6km 2020 € Lot 2 Rehabilitation and Reconstruction of the regional road Р1205, section Probistip - Krupiste L = 18km Lot 3 Rehabilitation of the regional road R2133, section Kumanovo - Opae L = 6km Lot 4 Rehabilitation of regional road R1104, section Kumanovo - Nikustak L = 11km Lot 5 Rehabilitation of regional road P1204, section Kumanovo - Sveti Nikole L = 32km Lot 6 Rehabilitation of main road A2, section Rankovce - Kriva Palanka L = 21km Lot 7 Rehabilitation of the main road A4, section Stip - Radovish L = 21km Transport Sector Rehabilitation of carriageway (one or both carriageways) Motorway Katlanovo – Petrovec Regional road Mavrovi Anovi – Zirovnica Rehabilitation and reconstruction of Regional road Karpalak – Zelino 10. 2018-2021 19.850.000 € EBRD 6 road sections Regional road Kicevo – Makedonski Brod Regional road Makedonska Kamenica – Sasa Regional road Uzem – Toranica Krusevo – Sliva – Pusta Reka Mlado Nagoricane – Pelince Prilep – Topolcani – Bitola Musov Grob – Majdan R1201 – Labuniste – Boroec – Jablanica Star Dojran – Border crossing 11. Rehabilitation of 15 road sections 2019-2020 13.000.000 € PESR Furka – Rabrovo Smokvica – Udovo Brajkovci – Balinci – Marvinci Sopiste – Dolno Sonje Bidzevo – Dolno Tatesi – Novo Selo – Mislodezda Vevcani – Oktisi – Sum Modernization and electronic tolls The project consists of modernization of 5 existing and construction of 2 new tolls on PESR (VAT of 12. 2014-2020 15.800.000 € EBRD in the Republic of Macedonia Corridor X. 2.8 m EUR) Reconstruction of road section from Rehabilitation and reconstruction of national road Kriva Palanka – border crossing 13. 2019-2021 10.161.000 € WBIF EBRD Kriva Palanka to Deve Bair Deve Bair, Republic of Bulgaria, part of Corridor VIII Construction of Regional road Staro Construction of new Regional road Staro Konjarevo – Novo Konjarevo in length of 3,4 14. 2019-2020 1.340.000 € PESR Konjarevo – Novo Konjarevo km 15. Construction of By-pass Vevcani Construction of new By-pass Vevcani in length of 1 km 2019-2020 330.000 € PESR Construction and reconstruction of 16 railway section Kumanovo- The length of the section is 31 km and is part of rail Corridor VIII. 2014-2020 50.600.000 € WBIF EBRD Beljakovce Transport Sector Construction of new and 150.500.000 17 reconstruction of existing railway The length of the section is 34 km and is part of rail Corridor VIII. 2018-2023 WBIF EBRD € section Beljakovce-Kriva Palanka Repair of rail tracks on section Repair on the rail tracks on the section which is part of rail Corridor X in a length of 30 18 Nogaevci (Veles) – Gradsko - 2020 9.400.000 € EBRD km. Negotino Renewal of rail fleet of JSC 19 The project is related to production and supply of 4 new electro locomotives. 2016-2020 7.000.000 € EBRD Macedonian railways transport Transport Sector Section 2 Identified mature projects Project Project Estimated duration Project title Stage* time needed Activities required to Total investment Grant/ Loan/ (preparati National Co- SR Project brief description (location included) for maturity reach maturity Source (sector included) (Maturity) on+ cost Source (in months) financimg Score TRANSPORT (details) implemen tation 2021 Construction of Joint Border Constructed rail border facilities for the Macedonian and Infrastructure project, 1 2 4 - 5.200.000 € WB6 EBRD 100 Station Tabanovce Serbian joint border control construction permit 2023 Modernization and The project consists of modernization of 5 existing and 2021 electronic tolls in the 2 construction of 3 new tolls on Corridor VIII and new 3 0 N/A - 13.000.000 € EBRD 99.6 Republic of Macedonia (II Motorway Miladinovci – Sveti Nikole – Stip. 2022 phase) Construction of the rail This project consists of construction works for completing of 2019 To be EBRD other 3 section Beljakovce-border the railway network in the Corridor VIII, eastern section, 3 0 N/A - 400.000.000 € IPA II defined IFIs 99.5 with R. Bulgaria between Republic of Macedonia and Republic of Bulgaria. 2025 (TBD) Rehabilitation of road 2019 IPA II (part 1 Rehabilitation of road section A2 Kumanovo -Rankovce 4 section Kumanovo- 3 0 N/A - 15.000.000 € of the whole TBD 99.2 with length of 31.5 km, on Corridor VIII. Rankovce (Stracin) 2021 section) se) Replacement of guardrails according to The purpose of the Operation is the replacement of Tender 2020 EN standards on guardrails according to EN standards on identified 9.900.000 € 8.415.000 € 1.485.00 5 3 0 Documents under - 98.2 identified priority priority sections along the Corridor X (phase 1 and phase (for phase 1) (IPA II) 0 € IPA II 2022 sections along the 2). Corridor X motorway 2021 Reconstruction of state road Strumica – Dabile with Tender 6 Reconstruction of state 3 0 - 1.500.000 € TBD TBD TBD 93.8 length of 2km Documentation road Strumica - Dabile 2022 Rehabilitation of road section in the north central-region Rehabilitation of road Detailed design & 2021 of the country and it is a section that connects 1.500.000 € 7 section Gevgelija-Greece 2 6 Tender - 93 Macedonia with Greece, along Corridor X (right border (Bogorodica) carriageway) Documentation 2022 Transport Sector Update of Rehabilitation/reconstruction 2021 Rehabilitatied/reconstructed around 14km of railway existing projects 8 of the rail section Kumanovo- 2 4 - 50.000.000 € 89.7 line along the Corridor X documentation Deljadrovce 2025 (FS, CBA, EIA, DD) Construction of new expressway section Prilep - bridge Detailed design 2019 Construction of road 9 on Lenishka river and Construction of third lane of road 2 2 and Tender - 8.000.000 € IPA II TBD 86.8 section Prilep- Raec Bridge section v. Belovodica – Mavrovo quarry Documents 2022 Reconstruction and Detailed design & 2021 Rehabilitation of state Reconstruction and Rehabilitation of state road 10 2 6 Tender - 800.000 € TBD TBD TBD 86 road R1109 (By-pass R1109 (By-pass Bogdanci) with length of 4 km Documentation 2022 Bogdanci) Motorway Miladinovci – Petrovec Motorway Miladinovci – Hipodrom Motorway Hipodrom - Miladinovci National road Fariska Klisura – Prilep Regional road Krivogastani – Krusevo National road Skopje – Blace National road Podmolje – Struga – Kjafasan Regional road Bitola – Demir Hisar Finalization of 2018 Rehabilitation of 13 road Regional road Krusevo – Demir Hisar Detailed design & 11 2 12 - 45.650.000 € EBRD 85.7 sections Regional road Katlanovo – Veles Tender 2022 Regional road Veles-Gradsko-Negotino-Demir Kapija Documentation Regional road Drugovo – Demir Hisar Rehabilitation of road section A1 Bitola - Medzitlija (Greece Border) Construction of new 2022 Construction of new state road Ponikva – Tursko Tender 12 state road Ponikva – 3 0 - 8.500.000 € TBD TBD TBD 85.7 Rudare with length approximately 13.5 km Documentation Tursko Rudare 2023 Construction of new 2021 Construction of new state road Toranica – Sasa Tender 13 state road Toranica – 3 0 - 10.000.000 € TBD TBD TBD 85.7 with length approximately 19 km Documentation Sasa 2023 Transport Sector Construction of 2021 regional road R2246 Construction of regional road R2246 section Izvor – Tender 14 3 0 - 16.000.000 € TBD TBD TBD 85.5 section Izvor – Garski Garski Most with length of 20 km Documentation 2023 Most 2021 Construction and supply Constructed and supplied of ITS on Coridor X with length Tender WB 15 3 0 - 19.000.000 € 85.4 of ITS on Corridor X of 179 km. Documentation (WTTFP) 2023 Reconstruction and Detailed design 2021 rehabilitation of Reconstruction and rehabilitation of regional road 16 2 6 under - 3.000.000 € TBD TBD TBD 85.2 regional road Sveti Sveti Nikole – Neokazi with length of 15km preparation 2022 Nikole - Neokazi Rehabilitation of road Detailed design & Rehabilitated road section A1 Gradsko - Stobi with length 17 section 1 12 Tender 2022 4.500.000 € TBD TBD TBD 84.4 of 4.5 km, on Corridor X. Gradsko-Stobi Documentation Rehabilitation of road Detailed design & Rehabilitated road section A1 Negotino – TEC Negotino 18 section Negotino – TEC 1 12 Tender 2022 8.000.000 € TBD TBD TBD 84.2 with total length of 8.8 km, on Corridor X.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us