Pilot Project Fiche Pilot Project 2 in Belarus (PPBY02)

Pilot Project Fiche Pilot Project 2 in Belarus (PPBY02)

Environmental Protection of International River Basins Project This project is funded by A project implemented by a Consortium The European Union led by Hulla & Co. Human Dynamics KG Pilot project fiche Pilot project 2 in Belarus (PPBY02) Country Belarus Name Flood risk assessment and mapping of the Upper Dnieper basin, including determination most at risk areas, field surveying of critical sites, mapping and initial design of protection measures Contact person: Alexandr Stankevich [email protected] Budget 30,000 Euro Timing 8 September 2014 – 31 August 2015 Short Flood hazard and flood risk maps are an effective tool for information about floods according description with EU Flood Directive. Dobrush - the district center in Gomel region was selected as territory of pilot project by reason of most affected by flooding city in upper Dnieper basin in Belarus Territory of Dobrush belongs to Iput river and its tributary Horoput watersheds. The main aim of the pilot project is a development preliminary programme of measures to improve the flood situation for territory of Dobrush based on flood hazard and flood risk maps. Outputs Deliverable 1: Inception report, containing implementation strategy and data needs Deliverable 2: Report with Dobrush watercourses flow calculations, outlining maximum water discharges of spring floods of 0.5%, 1%, 10%, 25% probability and maximum water discharges of flash floods with 10% probability Deliverable 3: GIS layers of raster in scale 1:10 000 and DEM of pilot territory Deliverable 4: Field survey report outlining cross-section measurements at Dobrush watercourses and definition of flow velocity regime at cross-section points Deliverable 5: Report with Dobrush watercourses hydraulic calculations, outlining maximum water levels of spring floods of 0.5%, 1%, 10%, 25% probability and maximum water levels of flash floods with 10% probability. Deliverable 6: Set of flood hazard maps for Dobrush for spring floods of 0.5%, 1%, 10%, 25% probability and flash floods with 10% probability in GIS and pdf formats. Deliverable 7: Set of flood risk maps for Dobrush for spring floods of 0.5%, 1%, 10%, 25% probability and flash floods with 10% probability in GIS and pdf formats. Deliverable 8: Report containing preliminary programme of measures to improve the flood situation Page 1 of 2 ToR for Groundwater Monitoring Equipment Photos Page 2 of 2 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us