National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Registrar Ph: +92.51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: [email protected] No. NEPRA/R/LAN-4468////1 April 22, 2020 Mr. Ghulam Dastagir Paracha, Plot No. 258, Street No. 38, Phase-VIII, DHA, Karachi. Contact No. 0333-2099903 Subject: Generation Licence No. DGL/4468/2020 Licence Application No. LAN-4468 Mr. Ghulam Dastagir Paracha, K-Electric Limited Reference.. KEL's letter No. KE/BPR/NEPRA/2020/316 dated 16.03.2020 (received on 18.03.2020). Enclosed please find herewith Generation Licence No. DGL/4468/2020 granted by the National Electric Power Regulatory Authority to Mr. Ghulam Dastagir Paracha for 20.700 kW photo voltaic solar based distributed generation facility located at Plot No. 258, Street No. 38, Phase-VIII, DIIA, Karachi, pursuant to NEPRA (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015. 2. Please quote above mentioned Generation Licence No. for future correspondence. Enclosure: Generation Licence (DGL/4468/2020) 2-2_ cry -It, (Syed Safeer Hussain) Copy to: 1. Chief Executive Office, Alternative Energy Development Board, 2" Floor, OPF Building, G-5/2, Islamabad. 2. Chief Executive Officer, K-Electric Limited, KE House, 39 B, Main Sunset Boulevard, DHA Phase-II, Karachi. 3. Director General, Environment Protection Department, Government of Sindh, Complex Plot No. ST-2/1, Korangi Industrial Area, Karachi. " • 11 . I. • . • 7 A I (NEPRA) Islamabad—Pakistan GENERATION LICENCE No. DG U4468/2020 The Authority hereby grants Generation Licence to Mr. Ghulam Dastagir Paracha, for 20.70 KW photovoltaic solar based distributed generation facility, having consumer reference number LB 234274, located at Plot # 258, Street 38, Phase-VIII, DHA, Karachi under the National Electric Power Regulatory Authority (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015 (the "A&RE Regulations") for a period of seven (07) years. This Licence is valid up to 2_16"rday of A Qic‘l 2027. 2. The Licensee shall abide by the provisions under the A&RE Regulations during the currency,ct the Generation Licence. 3. The technical parameters of Net Metering arrangements are shown heilitunder- (i). Primary Energy Sburce: „ Solar (ii). Size of Distributed Generation Fac" 4; 20.70 KW (iii). Generator/Inverter Information: Manufacture: Fronius Model No. SYMO 20.0-3-M (iv). Generation Type: Inverter 4. This Licence may be renewed subject to the A&RE Regulations. This Licence is given under my hand :on Ir`IsLay of MO Two Thousand & Twenty Registrar .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us