SHENGJING HOSPITAL OF CHINA MEDICAL UNIVERSITY EQUIPS ITS CAMPUS WITH THE BIGGEST EXTERNAL WIRELESS NETWORK IN CHINESE HEALTHCARE SYSTEM THANKS TO ALCATEL-LUCENT SHENGJING HOSPITAL OF CHINA MEDICAL UNIVERSITY CUSTOMER INFORMATION • Shengjing hospital of China Medical University is the result of the merger of the former national Shenyang Medical College founded in 1911 and the former private Liaoning Medical College founded in 1892. • CMU includes 18 colleges, faculties and sections, 130 departments: all with numerous disciplines (specialties). They are authorized to grant doctor and master degrees; 11 specialties for undergraduates and 10 specialties for higher professional techniques. CHALLENGES • Needed to have a network and communication system (voice and contact center) suitable for future expansion since the customer wanted to avoid a short term investment • As this was the biggest wireless network in the Chinese healthcare system, it was important to make sure all areas had a functional wireless network, even if one was inside or outside the campus building, or inside a lift. The Wi-Fi is a basic communication requirement and is widely utilized within the campus. “The integrated network setup brings revolutionary change to the hospital. This includes a good information system and ability to maintain PRODUCTS, SOLUTIONS AND SERVICES a quality network that would otherwise not be fully utilized. If we didn’t • Alcatel-Lucent OmniSwitch™ 9700 Chassis LAN Switch set up Alcatel-Lucent’s integrated network, it would be very difficult to • Alcatel-Lucent OmniSwitch™ 6850 Stackable LAN Switch put our multi-dimensional dynamic medical approach in place.” • Alcatel-Lucent OmniSwitch™ 6250 Stackable Fast Ethernet Switch • Alcatel-Lucent OmniAccess™ 6000 • Alcatel-Lucent OmniAccess™ AP60 & 93 QuanYu, CIO, SHENGJING Hospital Of China Medical University • Alcatel-Lucent OmniPCX™ Enterprise Communication Server BUSINESS AND TECHNICAL BENEFITS DEAL FACTS AND FIGURES CUSTOMER DETAILS • The combination of IP telephony, medical application systems and medical management systems constructed a network that saves at least 30 seconds per emergency per patient • Date initial deal won: January 2013 • Location: ShenYang, • The shortened patient-in-hospital cycle increased the usage rate of the 4750 hospital beds • Implementation date: September 2013 China available close to 99.9% while reducing hospital’s operational costs of up to 0.2 Million each year. • Business Partner: Hui Tong Data Co., Ltd. • Vertical: Healthcare • Usage of drug stock was time-optimized, thanks to the simultaneous functioning of network and • Number of users:3000 medical systems COPYRIGHT © 2014 ALCATEL-LUCENT. ALL RIGHTS RESERVED. .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-