World Bank Document

World Bank Document

Government of the Islamic Republic of Afghanistan/GIRA Ministry of Public Works (MoPW) - Afghanistan Rural Access Project (ARAP): IDA Project ID - Procurement Activity Schedule: Works Domestic Review Public Disclosure Authorized Procurement Prequalification Estimated Bid Opening Province District Contract Nu Description Surface Option Km Rm Preference by Bank Status Method (yes/no) Cost in USD Date (yes/no) (Prior / Post) Construction of 60 M RCC Deck Girder Pas MPW/WB/ARTF- Pul bridge in Kohistan District, Badakhshan Badakhshan Kohistan IDA/ARAP/BKN/BKN/001/C2/001 Province RCC 60.00 NCB No No Prior Review 779,794.89 26-Jun-12 First NOL to Bank Construction of 60 M Long RCC Deck MPW/WB/ARTF- Girder Bridge in Sultan Rubat (Dahn-e- Bamyan Waras IDA/ARAP/CHL/BMN/004/C2/001 Plan) Over Helmand River RCC 60.00 NCB No No Prior Review 840,730.59 28-Jun-12 First NOL to Bank Rehabilitation of road from Daykundi to MPW/WB/ARTF- Shahrstan Phase 3 Lot 1, Ch. 20+000 to Ch. Daykundi Daykundi IDA/ARAP/CHL/DKI/010/C2/001 30+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Daykundi to MPW/WB/ARTF- Shahrstan Phase 3 Lot 2, Ch. 30+000 to Ch. Public Disclosure Authorized Daykundi Daykundi IDA/ARAP/CHL/DKI/010/C2/002 40+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to MPW/WB/ARTF- Kotal Qunaq Phase 1 Lot 1, Ch. 0+000 to Daykundi Shahristan IDA/ARAP/CHL/DKI/012/C2/001 Ch. 10+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to MPW/WB/ARTF- Kotal Qunaq Phase 1 Lot 2, Ch. 10+000 to Daykundi Shahristan IDA/ARAP/CHL/DKI/012/C2/001 Ch. 20+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to MPW/WB/ARTF- Kotal Qunaq Phase 1 Lot 3, Ch. 20+000 to Daykundi Shahristan IDA/ARAP/CHL/DKI/012/C2/001 Ch. 30+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to Kotal MPW/WB/ARTF- Qunaq Phase 2 Lot 1, Ch. 30+000 to Ch. 40+000 Daykundi Shahristan IDA/ARAP/CHL/DKI/013/C2/001 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Public Disclosure Authorized Rehabilitation of road from Shahrstan to Kotal MPW/WB/ARTF- Qunaq Phase 2 Lot 2, Ch. 40+000 to Ch. 50+000 Daykundi Shahristan IDA/ARAP/CHL/DKI/013/C2/002 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Nahreen to Kotal MPW/WB/ARTF- Palfi Lot 1, Ch. 0+000 to Ch. 10+000 Km, (Gravel Baghlan Nahreen IDA/ARAP/NRHE/BGN/016/C2/001 Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Dec-12 Constriction of 60 M RCC Bridge over Panjshir Provincial Panjsher MPW/WB/ARTF- Panjsher River at Ch. 23+280 in Frobal Centre IDA/ARAP/KBL/PJR/026/C2/001 Road RCC 60.00 NCB No No Prior Review 660,872.94 6-Jul-12 First NOL to Bank Rehabilitation of Road from Center of Panjsher Bazarak MPW/WB/ARTF- Panjsher to Parandi / Wadkhol Ch. 0+000 Will be surveyed IDA/ARAP/KBL/PJR/027/C2/001 to Ch.11+000 Km, Gravelling 11.00 NCB No No Prior Review 759,000.00 21-Aug-12 Rehabilitation of Road From Charbolak to MPW/WB/ARTF- Payn Joy Lot 1, Ch. 0+000 to Ch. 10+000 Balkh Charbolak IDA/ARAP/NTH/BLH/036/C2/001 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Jan-13 Public Disclosure Authorized Survey will start Rehabilitation of Road From Charbolak to MPW/WB/ARTF- Payn Joy Lot 2, Ch. 10+000 to Ch. 20+000 Balkh Charbolak IDA/ARAP/NTH/BLH/036/C2/002 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Jan-13 Survey will start MPW/WB/ARTF- Construction of 68 M RCC Deck Girder Bridge in Under Technical Bid Baghlan Doshi IDA/ARAP/NRHE/BGN/037/C2/001 Zahrabi Kilagay Village, RCC 68.00 NCB No No Prior Review 705,705.21 17-Jul-12 Prepration Rehabilitation of Road From Khost to Fring (Dahn-e-Fring to District Center) Phase 2 MPW/WB/ARTF- Lot 1, Ch. 0+000 to Ch. 11+000 Km, Baghlan Fring IDA/ARAP/NRHE/BGN/039/C2/001 (Gravel Surface) Gravelling 11.00 NCB No No Prior Review 759,000.00 21-Aug-12 Under Design Rehabilitation of Road From Khost to Fring (Dan-e-Fring to Guzargah Noor District) MPW/WB/ARTF- Phase 2 Lot 2, Ch. 0+000 to Ch. 10+000 Baghlan Fring IDA/ARAP/NRHE/BGN/039/C2/002 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 21-Aug-12 Under Design Rehabilitation of Road from Warsaj to MPW/WB/ARTF- Khost Fring Phase 1 Lot 1, Ch. 0+000 to Takhar Warsaj IDA/ARAP/NRHE/TKR/042/C2/001 Ch. 10+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 11-Oct-12 Under survey Rehabilitation of Road from Warsaj to MPW/WB/ARTF- Khost Fring Phase 1 Lot 2, Ch. 10+000 to Takhar Warsaj IDA/ARAP/NRHE/TKR/042/C2/002 Ch. 20+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 11-Oct-12 Under survey Rehabilitation of Road from Warsaj to MPW/WB/ARTF- Khost Fring Phase 1 Lot 3, Ch. 20+000 to Takhar Warsaj IDA/ARAP/NRHE/TKR/042/C2/003 Ch. 30+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 11-Oct-12 Under survey Construction of 80 M RCC Deck Girder MPW/WB/ARTF- Bridge in Dawlat Yar Kyla Chy Khanabad Kunduz Khanabad IDA/ARAP/NRHE/KNZ/043/C2/001 District RCC 80.00 NCB No No Prior Review 901,836.98 4-Jul-12 First NOL to Bank Domestic Review Procurement Prequalification Estimated Bid Opening Province District Contract Nu Description Surface Option Km Rm Preference by Bank Status Method (yes/no) Cost in USD Date (yes/no) (Prior / Post) Rehabilitation of road from Aqtash Bridge MPW/WB/ARTF- to Darwaza Village Lot 1, Ch. 0+000 to Ch. Kunduz Khanabad IDA/ARAP/NRHE/KNZ/044/C2/001 10+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Oct-12 Survey will be started Rehabilitation of road from Aqtash Bridge MPW/WB/ARTF- to Darwaza Village Lot 2, Ch. 10+000 to Kunduz Khanabad IDA/ARAP/NRHE/KNZ/044/C2/002 Ch. 20+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Oct-12 Survey will be started MPW/WB/ARTF- Construction of 300 M Long RCC Deck Girder Kandahar Arghistan IDA/ARAP/SOUTH/KNR/047/C2/001 Bridge over Arghistan River in Arghistan District RCC 300.00 NCB No No Prior Review 3,300,000.00 16-Jun-12 Under Design MPW/WB/ARTF- Construction of 144 M Long RCC Deck Girder Khost Khost IDA/ARAP/STHE/KHT/051/C2/001 Bridge in Zako khel (Qamar Sar Village) RCC 144.00 NCB No No Prior Review 1,185,494.63 4-Jul-12 First NOL to Bank MPW/WB/ARTF- Construction of 100 M Long RCC Deck Girder Khost Shamel IDA/ARAP/STHE/KHT/052/C2/001 Bridge in Bagh Fram (Farm bagh Village) RCC 100.00 NCB No No Prior Review 1,200,000.00 6-Jul-12 Under Design MPW/WB/ARTF- Construction of 60 M Long RCC Deck Girder Khost Khost IDA/ARAP/STHE/KHT/053/C2/001 Matoon bridge (Gulzar Aqa Village) RCC 60.00 NCB No No Prior Review 720,000.00 11-Jul-12 Under Design Rehabilitation of Road in Malistan (Kundali to MPW/WB/ARTF- Shinday/Tangi) Phase 2 Lot 1, Ch. 15+200 to Ch. Ghazni Malistan IDA/ARAP/STHE/GHI/065/C2/001 24+200 Km, (Gravel Surface) Gravelling 9.00 NCB No No Prior Review 762,997.04 11-Jun-12 Design Completed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 1 (Ch 0+000 to Ch. Badakhshan Tagab Kishim IDA/ARAP/BKN/BKN/002/C2/001 7+500 Km) Gravelling 7.50 NCB No No Post Review 285,000.00 26-Aug-12 Design Completed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 2 (Ch. 7+500 to Ch. Badakhshan Tagab Kishim IDA/ARAP/BKN/BKN/002/C2/002 15+000 Km) Gravelling 7.50 NCB No No Post Review 487,500.00 26-Aug-12 Design Completed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 3 (Ch. 15+000 to Ch. Badakhshan Tagab Kishim IDA/ARAP/BKN/BKN/002/C2/003 22.50) Km Gravelling 7.50 NCB No No Post Review 525,000.00 26-Aug-12 Will be surveyed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 4 (Ch.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us