Oak Park Heights Area Sewer Improvements May 27, 2021 Activities through June Crews have completed rehabilitating the sewer structures and pipes south of south of 56th Street N and have started final restoration work. Final restoration and site clean up south of 56th Street N is anticipated to be completed in late June/early July. The St. Croix Trail will remain closed until site restoration work is completed (see map on next page). Crews will also begin installing the aboveground temporary wastewater conveyance system north of 56th Street N. Once this system is operational, crews will remove and replace the sanitary sewer pipes. Other projects in the area The Minnesota Correctional Facility will be closing Pickett Avenue for one day this week to complete a pipe crossing under the roadway. During the closure, trail users should use Stagecoach Trail or other alternate routes around the construction zone. Construction activities and schedules are subject to change due to weather and other unforeseen circumstances. What is a temporary conveyance system? Aboveground temporary wastewater conveyance pipes are being installed to ensure that there are no disruptions to sewer service while crews rehabilitate the regional sanitary sewer system along Highway 95. These pipes will convey sewer flow around the work site during construction. Diesel pumps with noise dampening equipment (low noise) will run 24-hours a day, seven days a week as part of the temporary wastewater conveyance system. Once the temporary conveyance system is activated, crews will also be regularly checking the system around-the-clock until it is deactivated. See below for more information St. Croix Trail Detour The St. Croix Trail is temporarily closed south of 56th Street N. Trail users should follow the posted detour route (see map on the right). SIGN UP FOR PROJECT UPDATES Have updates delivered directly to your email or phone! Visit us online and enter your information at: metrocouncil.org/sewerconstruction/oph And enter your information. When we update the website, you’ll be the first to know. Contact us Rick Russell Brad Warm Steve Kummer Principal Contract Administrator Contract Administrator Contract Administrator Construction Services Construction Services Construction Services Phone: 651-602-8729 Phone: (612) 554-0581 Phone: 651-602-8913 Email: [email protected] Email: [email protected] Email: [email protected] .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us