Green H2 Webinar Hydrogen Transport the Norwegian Gas Transport System

Green H2 Webinar Hydrogen Transport the Norwegian Gas Transport System

Green H2 Webinar Hydrogen transport The Norwegian gas transport system Nyhamna Kollsnes Kårstø - Securing energy supply R&D PROGRAMS & PRIORITIES FUTURE EFFICIENT VALUE CREATION OPERATION Gassco Strategy 2021 SUSTAINABLE DEVELOPMENT A MBITION TECHNOLOGIES AND SOLUTIONS FOR LOW EMISSION VALUE CREATION M AIN PRIORITIES 2021 DEVELOP SOLUTIONS AND TECHNOLOGIES TO REDUCE EMISSIONS FROM NCS, AND TO BUILD KNOWLEDGE TO PREPARE NCS GAS INFRASTRUCTURE FOR LOW CARBON SOLUTIONS • REDUCE EMISSIONS – SCOPE 1 • LOW CARBON SOLUTIONS - CCS VALUE CHAIN • LOW CARBON SOLUTIONS - HYDROGEN VALUE CHAIN • LOW CARBON SOLUTIONS - FUTURE ENERGY SYSTEMS Hydrogen transport in existing pipelines … 2016 2017 New Hydrogen Pipeline from Norway to Netherlands H2 Production in Norway Concept Only - To Be Evaluated Blue Green Project Objectives / Strategic Drivers H2 H2 • Response to EU H2 strategy (Blue H2 import) The Value Chain ? • Access to H2 backbone originating at Groningen ? • Engagement directly with off-takers possible 11,600,000 x Norway • Offer optionality and scale of H2 (blue and green) H2 Consumption at Oil & Gas • Seat at the table in solving for EU energy transition • 12.000 MW Blue Hydrogen Installations • Decarbonisation of O&G installations • 1.000 MW Green Hydrogen • Consider H2 link between Kollsnes and Kårstø • Local use for industry and maritime fuel Key Challenges • Large commitment required (take-or-pay) 11,600,000 xOffshore • EU subsidies required via price, not via CAPEX • Long term gas supply outlook, consider LNG Imp? • H2 offer full decarb of O&G installations H2 Production in NL • Better to export gas and import CO2? • New pipeline via some O&G installations • Will NOR be competitive producing green H2? • Repurpose of gas pipeline to H2 also in scope Key Numbers (estimates) (one of the three existing to Germany) • Start Up: 2030 Blue Green ? H2 H2 • CAPEX: xx bill NOK (for pipeline only) The UtsiraNetherlandsHigh • CO2 reduction: 20 Mill Tons CO2/yr Sverdrup ++ (90 TWh H2 replacing Natural Gas) • Connect to H2 mega-hub in Groningen Industrial Partnership • Access to H2 markets in NL, GE, BE, FR H2 HUB • Sign up offtake-commitments To To GE • Different price for Green vs Blue H2 NL/BE/FR Pipeline options from Norway to the Netherlands New pipeline ZPIIB + Statpipe + Europipe ~3 Mt/y 1.5 – 4 Mt/y Blending hydrogen into natural gas Free flow Dedicated routes Thank you for your attention Transparent Respectful Accountable Challenging Knowledgeable.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us