THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR x CHAPTER 1 INTRODUCTION 1.1 PROJECT INTRODUCTION Logging is one of the activities that is included under the National Forestry Act in promoting efficient harvesting and the use of work forests for the maximum economic benefits for all types of forest products and encourage the forest industrial development in line with the trend of forest resources and employment opportunities. National Forestry Act 1984 also classifies Permanent Reserve Forest (PRFs) and states that any products originating from a PRF or other State land are considered the property of the State Authority, and therefore may only be extracted with a proper license. State land forests are subjected to conversion or gazetted as PRF to replace the excised reserved forests. This particular project has been granted approval from the Department of Forestry Pahang through their letter PHN.PHG. (S) 9/74 SJ. 115 (40) for timber extraction (Refer to Appendix 1). The project will be managed by Super Radiance Sdn Bhd to undergo logging activity within an area of 360.82 Hectares (891.61 Acres) in State Land, in Mukim Endau & Rompin, Pahang Darul Makmur (Appendix 2). 1.2 PROJECT TITLE The title of the project is “The Proposed 360.82 Hectares (891.61 Acres) of Logging Activity in State Land, Mukim Endau and Rompin, District of Rompin, Pahang Darul Makmur.” Hereafter in this report, it shall be referred to as “the project”. 1.2.1 Project Organization Chart The project site will be managed by Super Radiance Sdn Bhd. The organization chart as in Figure 1.2.1. ECO SYNERGY SOLUTIONS SDN BHD 1 - 1 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR PROJECT PROPONENT/PROJECT MANAGER (SUPER RADIANCE SDN BHD) ENVIROMENTAL CONSULTANT (ECO SYNERGY SOLUTIONS LOGGING SDN BHD) MANAGER ENVIROMENTAL (SUPER RADIANCE SDN BHD) OFFICER ASSISTANT MANAGER ASSISTANT MANAGER (SUPER RADIANCE SDN BHD) (SUPER RADIANCE SDN BHD) CONTRACTOR CONTRACTOR (SUPER RADIANCE SDN BHD) (SUPER RADIANCE SDN BHD) Figure 1.2.1: Project Organization Chart ECO SYNERGY SOLUTIONS SDN BHD 1 - 2 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR 1.3 PROJECT PROPONENT AND ENVIRONMENTAL CONSULTANT All enquiries related to the project may be directly forwarded to the project proponent and EIA Consultant as indicated below: PROJECT PROPONENT SUPER RADIANCE SDN BHD B-100, Ground Floor, Jalan Air Putih, 25000 Kuantan, Pahang Darul Makmur. Tel : 09-566 0786 / 88 Attention: Mr. Loo Jun Guan EIA CONSULTANT ECO SYNERGY SOLUTIONS SDN BHD No.2-22, Kompleks Sentral Kajang, Jalan TKS 1, Taman Kajang Sentral, 43000 Kajang, Selangor Darul Ehsan. Tel: 03-8740 2781 / 03-8733 9783 Fax: 03-8741 8084 Attention: Mr. Shamsol Azhar bin Ismail ECO SYNERGY SOLUTIONS SDN BHD 1 - 3 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR 1.4 PROJECT LOCATION The project site is located in State Land with an area of 360.82 hectares (891.61 acres), Mukim Endau & Rompin, District of Rompin, Pahang Darul Makmur. The project site (Plate 1.4.1) is located approximately within latitude and longitude points as shown in Table 1.4.1. Based on Standard Sheet from Pahang Department of Survey and Mapping (JUPEM), the project site location is mapped in the standard sheet number of 449-C (Appendix 3). Table 1.4.1: Coordinate Points of the Project Site Coordinates Malaysian RSO Point Longitude Latitude X Y 1 103° 16' 24.513" E 2° 44' 20.708" N 586379.5421 302879.8356 2 103° 17' 1.671" E 2° 44' 15.430" N 587526.7777 302716.852 3 103° 17' 3.493" E 2° 43' 45.600" N 587582.305 301800.7745 4 103° 16' 56.081" E 2° 42' 49.763" N 587352.1171 300086.271 5 103° 16' 14.950" E 2° 42' 52.186" N 586082.1145 300161.6774 6 103° 16' 13.321" E 2° 43' 11.777" N 586032.2669 300763.3411 Source: Consultant’s estimation The nearest town is Kuala Rompin, Pahang Darul Makmur (2° 48’ 2.008’’ N, 103° 29’ 9.96’’ E) which is located approximately 48.1 km from the project site. Whereas the nearest settlement area is Felda Berabong (2° 46’ 2.43’’ N, 103° 18’ 54.073’’ E) which is located approximately 3.5 km radius from the boundary of the project site. Plate 1.4.1: View of the Project Site ECO SYNERGY SOLUTIONS SDN BHD 1 - 4 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR 1.4.1 Access Road The project site can be accessed from Kuala Rompin town through Federal Route 3/AH18 heading to Endau for about ±6.5 km until the junction to Route 2488. Further up the route for approximately ±29 km (Plate 1.4.2), there will an exit to an existing unpaved access road on the left side of the Route 2488 (Plate 1.4.3 and 1.4.4). The existing access road is located at the east of the project site approximately 10 km and will be used during logging and post-logging activity. Currently, the sharing access road will be at the intersection of the main road from Kuala Rompin to Endau and Route 2488 to Felda Selendang. Therefore, it will be one of the sensitive receptors as the contractor shall share the road with the local residents. The nearest settlement which is Felda Berabong is located 4.0 km from the Project Site and might receive a significant impact from the project. Wildlife population in the State Land also was pointed as a sensitive receptor near the project site as it may be affected by the activity in the project site. Route 2488 Route AH18 Plate 1.4.2: Existing Road to the Project Site ECO SYNERGY SOLUTIONS SDN BHD 1 - 5 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR Access Road to the Project Site Route 2488 Plate 1.4.3: Existing Paved Access Road to the Project Site Plate 1.4.4: Existing Unpaved Road to the Project Site ECO SYNERGY SOLUTIONS SDN BHD 1 - 6 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR Figure 1.4.1: Location Plan, Access Road and Sensitive Receptor of The Project Site ECO SYNERGY SOLUTIONS SDN BHD 1 - 7 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR 1.4.2 The Proposed Road Network There are currently a few logging activities surrounding the project area. Since the nature of the project is comparable, sharing of access road within the proposed projects will be implemented. The construction of access road within the project site is presented in Figure 1.4.2. Agreement from project proponent of the proposed projects is necessary in order to bear the cost for constructing and maintaining the access road. ECO SYNERGY SOLUTIONS SDN BHD 1 - 8 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR Figure 1.4.2: The Proposed Road Network ECO SYNERGY SOLUTIONS SDN BHD 1 - 9 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR 1.5 MAIN ACTIVITIES OF THE PROJECT The main activities for the project are mainly divided into three steps, which are preliminary investigation, logging activity and post-logging activity. The main activities consist of: • Site survey • Soil survey • Flora and fauna survey • Socio-economy survey Preliminary Investigation • Identifying access road • Project planning/ management • Construction of internal road and drainage system • Installation of LD-P2M2 tool • Based camp establishment • Timber Felling • Matau • Bucking • Skidding and hauling Logging Activity • Log loading • Waste disposal • Documentation/ log of works • Transportation • Demolition of base camp and log yard • Removal of all machinery, vehicles, waste from concessions • Rehabilitation of log yard, skid trail and access road Post-Logging • Post-closure Environmental Monitoring and Audit Activity Figure 1.5.1: Logging Activities ECO SYNERGY SOLUTIONS SDN BHD 1 - 10 THE PROPOSED 360.82 HECTARES (891.61 ACRES) OF LOGGING ACTIVITY IN STATE LAND, MUKIM ENDAU AND ROMPIN, DISTRICT OF ROMPIN, PAHANG DARUL MAKMUR 1.6 PROJECT PROPONENT AND QUALIFIED PERSON Super Radiance Sdn Bhd is a private organization, which has been granted an approval from Pahang Forestry Department to perform logging activity for the project. In order to achieve the objective of EIA implementation, the project proponent is responsible to liaise with the environmental consultant and the contractor to monitor on environmental matters for the project. Eco Synergy Solutions Sdn. Bhd. has been appointed by Super Radiance Sdn Bhd to conduct an EIA study for the project area. The EIA report is prepared to comply with the guidelines, conditions and procedures as well as to get the approval from Department of Environment (DOE) Headquarter, Putrajaya. The EIA consultant team plays a major role in the preparation of EIA report and environmental monitoring programs in accordance with the objectives and requirements of the EIA, whilst ensuring compliance with the relevant regulations and standards.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages17 Page
-
File Size-