Ar04-Cern.Pdf

Ar04-Cern.Pdf

TRIUMF ANNUAL REPORT SCIENTIFIC ACTIVITIES 2004 ISSN 1492-417X CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS OPERATED AS A JOINT VENTURE MEMBERS: ASSOCIATE MEMBERS: THE UNIVERSITY OF ALBERTA THE UNIVERSITY OF GUELPH THE UNIVERSITY OFBRITISHCOLUMBIA THE UNIVERSITY OF MANITOBA CARLETON UNIVERSITY McMASTER UNIVERSITY SIMON FRASER UNIVERSITY L’UNIVERSITEDEMONTR´ EAL´ THE UNIVERSITY OF TORONTO QUEEN’S UNIVERSITY THE UNIVERSITY OF VICTORIA THE UNIVERSITY OF REGINA SAINT MARY’S UNIVERSITY UNDER A CONTRIBUTION FROM THE NATIONAL RESEARCH COUNCIL OF CANADA OCTOBER 2005 The contributions on individual experiments in this report are out- lines intended to demonstrate the extent of scientific activity at TRIUMF during the past year. The outlines are not publications and often contain preliminary results not intended, or not yet ready, for publication. Material from these reports should not be reproduced or quoted without permission from the authors. iv CERN COLLABORATION INTRODUCTION 2005 aiming to optimize the machine parameters at TRIUMF’s collaboration with CERN on produc- collision and evaluate the realistically achievable lumi- ing accelerator components forthe Large Hadron Col- nosity. lider (LHC) is now essentially complete with only a During 2004, in collaboration with CERN, a track- few small tasks continuing up to first collisions. For the ing model was developed, which includes weak-strong period 1995–2005 the amount of this contribution that beam-beam interactions, simulated alignment and field TRIUMF is coordinating on behalf of Canada is $41.5 errors in both rings, and procedures for their correc- million. The largest contribution has been the man- tion. The resultant programming tools mostly con- ufacture of 52 twin aperture quadrupoles, completed sist of already existing modules. They were thoroughly and shipped to CERN last year. These magnets are tested at TRIUMF and, on several occasions, improve- being field mapped at CERN and this work is expected ments were made. to be completed by May, 2005. The tracking job is built in several stages: prepa- The LHC injection kicker components designed and ration of optics for an imperfect machine, correction, built at TRIUMF underwent some final long term high short-term (1000 turns) tracking performed with the voltage testing using the CERN provided control sys- code MADX, and a million-turns tracking with Six- tem. High voltage measurements were carried out to track to obtain the domain of stable trajectories (dy- demonstrate that the rise time, fall time, and pulse namic aperture). The short-term tracking allows us to uniformity were within the required specifications. The observe the effect of non-linearities on the beam-beam PFNs are being shipped to CERN in a special shock- tune footprint. The long-term jobs are built locally, but absorbing container and all components should arrive executed on dedicated clusters at CERN and world- by June, 2005. wide. Being intended to assist the actual machine oper- The remaining hardware project is the design and ation, the correction algorithm takes into account only prototyping of the digital acquisition boards for the measurable observables, i.e. such that can be accessed LHC beam pick-up monitors.Thisdesignhasbecome from the LHC control room. aCERNstandard and is now planned for use in the The non-linear particlemotion in an accelerator transfer lines and for the beam loss monitors. TRIUMF can be described by a symplectic 6-D map acting on has manufactured prototypes of the latest version for initial coordinates. Using the well established theory of testing at CERN. The series production will be carried such maps, several programing tools were created al- out at CERN. lowing us to build the Lie-algebraic map of a beam line The two beam dynamics efforts continue to be sup- or a ring in either factorized, or Taylor form. Such maps ported. The first is a continuation of the beam tracking were applied for the LHC triplet correction, where an efforts taking into accountfielderrors in the magnets, analytical treatment was made, and on beam dynam- beam-beam interactions and misalignments to deter- ics problems arising at TRIUMF – to reproduce the th mine methods of correcting these non-linearities. The 7 order Taylor map (COSY) of an FFAG cell. In per- second study looks at beam-beam effects in the colli- spective, such tools may serve to analyze the Linear sion region and the potential instabilities that might be Collider interaction region. caused by the electric forces between the bunches. This Beam Optics and Stability task requires extensive computing power and makes use of the parallel processing available from WestGrid. Coherent beam-beam effects in the LHC The LHC schedule presently calls for an injection Our study of beam-beam interactions in the LHC test into an octant of magnets to take place in late seeks to identify potentially unstable coherent modes 2006, with first collisions scheduled for July, 2008. excited by the electric forces between counter-rotating More details of the TRIUMF LHC work can be found bunches of protons as the two beams meet and cross in the following sections. in the collision regions. Large-scale multiparticle simu- BEAM DYNAMICS lations are a principal tool in this type of investigation and our parallel beam-beam simulation code BeamX is Beam Optics and Collimation one of the first to include a fully 3-dimensional model Aftercompletion, in late 2003, of the tasks related of the collision process. to collimation set-up and optics, a request was made In 2004 BeamX was migrated to three new comput- by the CERN beam-dynamics group for assistance in ing platforms in order to evaluate their parallel perfor- studies of LHC at collision. This is a part of an inten- mance and to establish resource criteria for support- sive tracking campaign planned by CERN for 2004– ing large-scale simulations that would allow the explo- 230 ration of the beam-beam parameter space and help to with matching terminating resistors, four 5 Ω pulse predict and optimize LHC collision scenarios. forming networks (PFN) and two resonant charging The systems used were: the WestGrid Lattice power supplies (RCPS). Six RCPS and nine PFNs, to- CLUMP (CLUster of MultiProcessors) system at the gether with associated switch tanks, and dump switch University of Calgary, the WestGrid Glacier facility at terminating resistors have been built at TRIUMF and UBC, and the new Openlab cluster at CERN. This all have been tested at high voltage (60 kV) to ensure provided a diverse set of testbeds. The WestGrid-UBC that the performance is within specification. and CERN clusters are based on dual 32- or 64-bit Each 5 Ω PFN is composed of two parallel 10 Ω commodity processors in blade or rackmount config- lumped element delay lines;eachline consists of a 28 urations, respectively. In contrast, the CLUMP archi- cell, 4.36 m long precision wound coil, high voltage and tecture uses specialized hardware and is designed to high current capacitors and damping resistors in par- support rapid low-latency communication among small allel with the coil. There is a thyratron switch tank at groups of processors in shared memory configurations. each end of the 5 Ω PFN. To benchmark these systems, a series of full-scale Each PFN and associated thyratron switch tank BeamX runs (131078 simulated collisions), employing was operated at 54 kV and 0.1 Hz for more than 24 from 1 to9processors, were performed on each clus- hours. Detailed measurements were carried out with ter. Consistently, the lattice CLUMP system was the 54 kV on the PFNs: 54 kV was chosen as it is the clear leader, with performance at least a factor of 2 expected operating voltage at CERN. Pulses of mag- better than the commodity clusters, making it the pre- nitude 27 kV are produced when a PFN is charged ferred platform for BeamX in its current form. How- to 54 kV and discharged into a matched terminat- ever, further developments in parallel beam-beam sim- ing resistor. CERN provided a terminating resistor ulation for LHC will likely involve increasing numbers and 10 RG220 cables to connect the main switch of processors, to handle multiple interaction regions (MS) CX2003 thyratron to the main switch termina- and bunch trains, and this may swing the preference tor(Fig. 246). The kicker pulse length is controlled by back to the larger commodity clusters. a dumpswitch(DS)CX2503 hollow anode thyratron We would like to acknowledge the support of West- that connects to a water-cooled DS terminating resis- Grid (funded by the Canadian Foundation for Innova- tor. A total of 10 precision terminating resistors was tion and other agencies) whose facilities were essential built and tested at TRIUMF with a measured resis- to the timely validation, scaling up, and benchmarking tance of 4.74 Ω ± 0.01 Ω at 25◦Catlowvoltage. The of our parallel code in collaboration with CERN. MS terminating resistancewasmeasured at low volt- age to be 4.96 Ω. The voltage dependence of the MS CONTROLS AND INSTRUMENTATION and DS terminating resistors is, according to HVR, − . LHC Orbit System Components 1 33%/(kV/cm). Each resistor consists of a stack of 10 resistor disks each 1 in. thick, thus the MS termina- The digital acquisitionboard(DAB64x) was re- tor resistor at 27 kV is 4.89 Ω, and the DS terminator desiged to meet the latest LHC specification (LHC-BP- resistance at 27 kV is 4.68 Ω. ES-0002 Rev 2.0). Five prototype boards were manu- factured and assembled for preliminary hardware test- ing. Two modules were sent to CERN for beam loss monitor mezzanine development. Firmware develop- ment and hardware testing is ongoing. Software for DAB control and monitoring was rewritten to support the new power PC processor and the latest Lynx OS operating system.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us