![2017-2018 [Pdf]](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
SAN JOAQUIN COUNCIL OF GOVERNMENTS // MEASURE22017017 K ANNUAL22018018 REPORT 2018 | A Progress Report on Measure K Accomplishments Measure K has been making a mark on process is complex. Committed public deliver estimate of 18 months). The transportation in San Joaquin County for works departments throughout the service also has begun design work About nearly 30 years, and 2017/18 was no county are preparing for a new round of as part of over $900 million in new SJCOG dierent. A number of construction construction. funding for expansion to Merced The San projects neared completion this year. and Sacramento. Rail Joaquin (Thornton Road and Hammer Lane in Major highway projects are in our future. improvements at bridges, rail Council of Stockton are prominent on the list). But The Highway 99/120 interchange project siding and new stations are now Govern- preparing the way for new construction is at the top of the region’s list and in design so ments Andrew T. Chesley projects is key to success and 2017-18 2017-18 was a key year in advancing the that future administers was a big year in Measure K for eort. Project Study Reports are now passengers can Executive Director SJCOG all aspects of environmental, design, and right of way underway for improvements on experience the the Measure activity for future projects. Let’s see what Highway 120 and Interstate 5 in south value of has been happening in the San Joaquin County. passenger rail K program transportation incubators. service. and is responsible for improving The San Joaquin Regional Transit District San Joaquin County’s transporta- With the help of new funding from the has developed an “Uber type” transit Whether it be in tion system through planning, State of California, several major projects innovation that is now in service in the construction, funding, and delivering are moving to construction on local north part of the county. And the environmental infrastructure projects; support- roadways in this coming year. For District’s commitment to lead the transit protection, or Robert Rickman ing ongoing operations and SJCOG Board Chair, instance, the Manteca Union Road/120 industry in moving to an all-electric eet design of new Mayor – City of Tracy maintenance of the county’s project has completed environmental, contributed to it being named Transit facilities, transportation system; as well as design, and right of way and will begin System of the Year by the American Measure K is implementing policies and construction in the spring of 2019. In Public Transit Association. The Altamont delivering for programs that expand mobility Tracy, the design of Corral Hollow Commuter Express Service continues to the traveling widening and right of way for utility break records in terms of ridership public in San and improve transportation and relocation is underway. Getting these growth which is requiring adding new Joaquin eciency. projects through the development cars (currently on order with a build and County. Measure K Paves the Way In 1990, voters approved Measure K (MK), San Joaquin County’s rst half-cent sales tax for transportation improvements. Developed as a 20-year plan, MK allocated 25 percent of the sales tax revenue to freeways, 35 percent to streets and roads, 7.5 percent to railroad crossing safety, and 32.5 percent to transit and active transportation improvements. The voters entrusted the San Joaquin Council of Governments (SJCOG) to administer the MK program. That trust was rewarded with by more than $735 million in transportation improvements in San Joaquin County. This included adding freeway lanes on I-205, I-5, and SR 99; improving numerous intersections and freeway interchanges; implementing Altamont Corridor Express service in San Joaquin County; increased railroad crossing safety with grade separation projects; and improved air quality. MKR Keeps Improvements Coming With MK’s track record of promises kept fully realized, San Joaquin County voters renewed the sales tax in 2006. SJCOG was once again entrusted to be the steward of the Measure K Renewal (MKR) during its 30-year lifespan. MKR is designed to reduce congestion and enhance mobility. It does this through MEASURE K RENEWAL ALLOCATIONS specic projects designed to meet improvements include safety, operational improvements on local streets and roads, as well as general congestion reduction. There is also a focus on passenger rail and bus service to provide alternatives to the Local Street Repair car, improving the air quality of the San Joaquin Valley. 35.0% MKR sales revenue began collection November 2011. Recognizing an immediate need for improvements, the SJCOG Board of Directors established the MKR Early Action Program. This program outlined a plan to expedite many needed improvements prior to MK sales tax collection. In 2008 environmental and design Congestion Relief work on several major projects began. The result was $442 million in improvements 32.5% underway by 2012. In 2018, the SJCOG Board approved the Measure K Ordinance and Expenditure Plan, which identies the countywide transportation facility and service improvements to Passenger Rail, be delivered by 2041. The plan continues the focus on improving street and road Bus & Bike conditions, reducing congestion, and improving safety on local freeways. This will 30% Railroad Crossing Safety be done through expanding ACE rail service, bus rapid transit services, and 2.5% continuing the Bicycle, Pedestrian, and Safe Routes to School Program and the Smart Growth Incentives Program. Measure K and our Freeways It takes years of planning before any construction project begins. Interchange Project will replace the existing undercrossing with a new diamond Before you see orange cones or hear the hum of heavy equipment, interchange and widen McKinley Avenue to six lanes in the City of Manteca. environmental reports must be approved, the project design must • In addition, SJCOG continues to work with Caltrans on preconstruction activities for nalized, and the right-of-way secured. In 2018, SJCOG continued $1 billion of operation and capacity improvements in southern with design work and environmental studies for several new projects San Joaquin County: I-205 Six Lane Widening (between I-5 and Grant Line Road), I-5 to address congestion and capacity improvements in southern San Mossdale HOV Widening, SR-120 Widening (adds new lanes in each direction between I-5 and SR-99), SR 99/120 Connector, and SR-99 HOV Widening. Joaquin County. • Moving to the north end of the county, the State Route 99/Turner Road • Scheduled for construction in 2019, the SR 120/Union Road Interchange Project Interchange Improvements Project will modify the existing interchange between in Manteca will recongure the existing interchange to enhance circulation and State Route 99 and Turner Road in the City of Lodi to improve operations at the improve safety and trac ow for drivers, pedestrians, and bicyclists. southbound on-ramp. The project is fully funded and moving toward nal design. • Also scheduled to start construction in 2019, the SR 120/McKinley Avenue Construction is planned for 2020. SR 120/Union Road Interchange Project (California’s 1st diverging diamond interchange) Why Invest in Active Transportation? It’s critical to have sustainable, multimodal transportation choices that include more than just roads. MKR provides options for other methods of transportation that will enhance public health and improve air quality by reducing greenhouse gas emissions. By redirecting trac o the roadways, we can reduce air pollution, decrease trac congestion, and improve safety. An example of designing safe streets that provide room for bicycling and walking is the Miner Avenue Complete Streets project is a 10-block rehabilitation project in Stockton (from Center Street to the UPRR underpass, near the ACE Station). Scheduled to begin in 2019, the project will improve the corridor by: • Reducing travel lanes from four to two and adding dedicated bicycle lanes, • Adding median islands and a roundabout at the western end of the project, • Modifying trac signals at the intersections and adding streetlights, • Widening sidewalks with pedestrian and seating areas, and • Adding beautication elements. Bicycle and Pedestrian Planning Bicycle and pedestrian projects expand healthy travel choices and promote a low-carbon economy. They also lead to improved connections between local and regional roads, public transit, and intercity and passenger rail. To help further the goals of walkability and bikeability of San Joaquin County, in 2018 SJCOG awarded $19.6 million to 21 bicycle and pedestrian projects and plans that support inll development, neighborhood revitalization, and downtown improvements. They include: The Elmwood Elementary School Access Improvements project out in the Garden Acres area of east • 2.76 miles of Class 1 Bike Paths • 1.31 Miles of Class III Bike Routes Stockton is a perfect example of how the MK Bicycle, Pedestrian, and Safe Routes to School Program helps • 117 Crosswalks and 12 Flashing Beacons • 4.32 Miles of Sidewalks expand and enhance pedestrian and bicycle safety. This recently completed San Joaquin County project reconstructed and widened the roadway to provide sidewalk on both sides of Ardelle Avenue; installed an • 9.47 Miles of Class II Bike Lanes • 5.75 Miles of Class IV Separated Bikeways asphalt walkway on the west side of Bird Avenue to provide continuous pedestrian access; and, installed • 218 Street Trees • 4 Plans and Studies seven new curb ramps to provide access in accordance with Americans with Disabilities Act requirements . Measure K Renewal and our Roadways To the grocery store, to the gas station, to school, to work, to shopping, restaurants, and more.. Every trip begins with a car and local street or road. Keeping our local roads in good shape is a critical component of the MKR program. MKR provides cities and the county funds for street repair, rehabilitation, and other improvements. This nancial pipeline continues to deliver critical funding for enhancements such as grade separation projects, street widening, repair, and rehabilitation.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages12 Page
-
File Size-