Facility Standards: an Operational Byproduct (Really?) APPA/PCAAPA/Bayappa July 22, 2017 1:30 Pm to 2:30 Pm

Facility Standards: an Operational Byproduct (Really?) APPA/PCAAPA/Bayappa July 22, 2017 1:30 Pm to 2:30 Pm

7/28/2017 Facility Standards: An Operational Byproduct (really?) APPA/PCAAPA/BayAPPA July 22, 2017 1:30 pm to 2:30 pm Steering Committee • Bob Askerlund Facilities Services • Assistant Vice President of Facilities Mission Statement: • Malin Francis • Director Planning & Design, Facilities Architects We value the success of our • students. Our mission is to foster Barton Mace and environment that is • Director Construction & Craft, Facilities Office conducive to teaching and learning by providing an attractive, clean, safe, Project Team comfortable environment. We • Mary Jane Thompson, APPA, SCUP strive for professional, courteous and timely service to all • Project Manager, Facilities Office students, faculty, staff and • Jessica Davenport, APPA, SCUP visitors • Assistant Facilities Planner, Facilities Architects • Vinson M. Johnson, AIA, LEED GA, APPA, SCUP • College Architect, Facilities Architects 1 7/28/2017 • Salt Lake Community College • Who are We? • Facilities Standards: Our Needs • Project Process Definition • Standards Documentation • Design & Construction Standards (D&CS): Project Presentation Overview • Project: Goals & Execution • Methodology: Lean Vs. Traditional • Results: Success & Challengers • Tips & Tricks • Lean Planning • Automate Documents • Set Appropriate Expectations • Living Document • Beginning a New Culture Salt Lake Community College 2 7/28/2017 • Utah’s Only (Public) Community College • Founded 1948 • Technical Program for Salt Lake City School District • Two Year College Salt Lake • 100+ Degrees & Program Community College: • Partnerships with Four-Year Schools: • University of Utah • Utah State University • Utah Valley University • Brigham Young University • Westminster College • 61,150+ Students Served Each Year • 23,355 Head Count • 15,471 Annualized Full-Time Equivalent (AFTE) Salt Lake • 19.21 Average Class Size Community College: • 19:1 Student to Faculty Ratio Students • 70% Work While Attending SLCC • 73% Transfer to a 4-Year Institution • 500+ Partnerships with Local Business & Educational Institutions 3 7/28/2017 Salt Lake Community College: Redwood Road Campus (1967) 35 Salt Lake Community College: South City Campus (1992) 2 4 7/28/2017 Salt Lake Community College: Jordan Campus (2001) 10 Salt Lake Community College: Miller Campus (2001) 10 5 7/28/2017 Salt Lake Community College: Westpointe Campus (Opening 2018) 2 Salt Lake Community College: Herriman Campus (2020 Projected) 6 7/28/2017 Salt Lake Community College: 3512 Leased Properties * Across the street from our building…. Facility Standards Needs 7 7/28/2017 Facility Standards: Our Needs Facilities Services Organization Staff: 110+ • Campuses: 11 (1 Future) • Facilities, BGSF: 2,400,000+ • Plant Operations: $18,468,624 • Budget: 8.9% Facility Standards: Our Needs • Capital Value: $500+ M • Facilities Remodel Projects, Annual: $4.5M to $8.5M • New Projects, Annual : $15M to $25M Construction Project Personnel - Project Managers: Four (4) - Planning: Two (2) - Interiors: Two (1.5) - Architect: One (1) 8 7/28/2017 • 60% of Facilities staff will have retired within 5 years • Loss of institutional knowledge • Loss of procedural knowledge • Integrating legacy paper archives & digital Facility Standards: models Our Needs • Accessing information • Getting useful documents from our consultants Current State • Project Management • “Do More with Less” • Responsibility is Delegated from the State of Utah • Filling the Gap between Design & Construction Facility Standards: Current State Current Standards Project Management • “Ask Bob (or Bart or Frank or • “Rogue” Design Consultants Wes…) • “Rogue” Staff & Faculty • “It’s in the files…” (Last • Project Design & Construction Iteration 1999) Delays • “Look at “Insert last job they • Staff Personalization liked here”… • Change Orders • Untracked • Project Waste (Churn) • Undocumented • Anecdotal 9 7/28/2017 • Manage and Supervise the programming, planning and design of College Facilities including new construction and remodel Facility Standards: projects, to ensure that new construction Our Needs and alterations comply with College, Local, State and Federal building codes, accessibility and design standards. …… Goals, Hopes & Outcomes • College Design Standards: • Create and maintain a complete set of SLCC The NEW College Design Standards... Architect • Incorporation of SLCC Design Standards into each project… • Ensure that the architectural quality and integrity… Facility Standards: Legacy Documents The Campus Standards, for SLCC, is not a collection of data from existing projects but protocols that reside only in the Institutional Memory. • Last Known Collection: 1999 10 7/28/2017 What Did I Get Myself Into…. 11 7/28/2017 D&CS Project: Traditional Vs. Lean / Why Lean “Operational Planning” is Sooo cool…….. D&CS Project: Traditional Project Process Project Approach Constraints • Gather Data • Existing documents: Non- • Collate Existing Standards existent • Personal Interviews • Interview: Time • Extract from Existing Construction Intensive or O&M • • Transcribe Data Transcription: Labor Intensive • Secure Support • Or Additional Staff • Reviews & Approvals: Non- enforceable • Publish • Review Document • Revise • Publish Estimated Project Duration: Up to 12 Months • No Progress in 18 Years 12 7/28/2017 LEAN / SIX SIGMA D&CS Project: What is Lean? Lean is a customer-centric methodology used to continuously improve any process through the elimination of waste in everything you do; it is based on the ideas of “Continuous Incremental Improvement” and “Respect for People.”* * Lean For Dummies Cheat Sheet 13 7/28/2017 D&CS Project: Lean Process - The Kaizen Project Cycle The term Kaizen is The PDCA (or PDSA) derived from two Cycle is the Lean Japanese characters; working structure… kai, meaning The acronym stands for: “change” & • Plan zen meaning • Do “continuous • Check (Study) improvement.” • Act * Lean For Dummies Cheat Sheet D&CS Project: Collaborative Lean Tools Analysis / Decision • Guiding Principles Process • Conditions of Satisfaction • Daily Check-in • 5 Whys (Root Problem • Cross Functional Teams Analysis) • Lean Construction • A3 (Thinking and Documentation) • BIM (3D, 4D, 5D) • Choosing by Advantage (CBA) • Creativity • Decisions at the “Last • Last Planner@ System Possible Moment” • Go Slow to Go Fast • Set Based Design • PDCA (Plan, Do, Check, • Spaghetti Diagrams Act/Adjust) Communication • Pull Planning • Conversations for Effective • Value Stream Mapping (VSM) Communication • Work Flow (Pull) • Elements of a Reliable • Target Value Design Promise • Mock-up Design • Plus / Delta • Big Room 14 7/28/2017 Why Lean Instead of Traditional? Lean is proven Lean makes sense Lean is accessible Lean is “hands-on”* * Lean For Dummies Cheat Sheet D&CS Project: Strategy Session Process Tools • Visioning Statement Leadership Direction • Conditions of Satisfaction Collaboratively Set Goals • Current State What is Happening Now (VSM) • Future State Analyze / Optimize / Remove Waste (VSM) 15 7/28/2017 D&CS Project: Strategy Session Project Criteria • Revisions friendly (80% Rule) • “Big Room” Collaborative Work Session Format Who is Our Audience: 1. Students 2. Faculty & Staff 3. Facilities Services 4. Design Consultants D&CS Project: Strategy Session Standards Goals • Design Branding/Image • Process Management • Construction Quality • Learning Organization • Promote Innovation Standards Products • Project Process Description (Task List) • Design Concepts & Expectations • Construction Standards • Requirements beyond State of Utah 16 7/28/2017 D&CS Project: Strategy Session - Information Flow Future State (VSM) Project Current State Guidelines / (VSM) Check List Process Improvements Visioning / Conditions of Satisfaction (CoS) Standards (Products & Lessons Learned Specifications) (Institutional Standards Memory) Standards (Quality) D&CS Project: Schedule (Pull Plan) Start of 0f Project: 09/01 Start of Design: $40M Project 17 7/28/2017 D&CS Project: Strategy Session Information Flow Future State (VSM) Project Current State Guidelines / (VSM) Check List Process Improvements Conditions of Satisfaction Standards (Products & Specifications) Lessons Learned Standards Standards (Quality) Approval Meeting & Implementatio Kick-Off Work Work n Planning Session Session 90 Minutes 90 Minutes D&CS Project: Schedule (Detail) One Week • Visioning Session Steering Committee • Work Sessions (3) One Month • Kick-off Meeting • Conditions of Satisfaction • Current State (Operations) • Lessons Learned One Month • Development Work Session • Future State • Standards Development Two Months • Standards Development • Collate • Edit One Month • Publication • Administrative Approval • Publish • Distribute 18 7/28/2017 D&CS Project: Team Assignments D&CS Project: Meeting Preparation 19 7/28/2017 D&CS Project: Work Sessions Meeting• Plan Agenda “PDCA” • Educate, As Necessary • Review Conditions of Satisfaction (CoS) • Review Previous Meeting / Agreements • Do • Analyze: Current State, Lessons Learned, Visualize • Synthesize: Future State, Content • Check • Crosscheck New Content with CoS • Crosscheck New Content with Future State • Act • Make Assignments • Secure promise to act • Plus / Delta D&CS Project: Work Sessions For Content • Simulate Conversation: Write two or three…. • Products that should be…. • Things that waste time…. • Please consider… • Self Present • Builds Consensus • Promotes Discussion • Self Regulation • Categorize & Collate • Confirms Decisions • Builds Assignments • Reinforces Action 20 7/28/2017 D&CS

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    29 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us