Waterford City Public Infrastructure Project

Waterford City Public Infrastructure Project

WATERFORD CITY PUBLIC INFRASTRUCTURE PROJECT TRANSPORT HUB | PART VIII REPORT WPIP-ROD-ENV-S2_AE-RP-EN-400022 |JULY 2019 PURPLE: PANTONE: 2622 COATED C- 57 M-98 Y-0 K-46 R-84 G-7 B-91 GREEN PANTONE: 3455c C-100 M-0 Y-81 K-66 R-0 G-80 B-47 RED PANTONE: 195C C-0 M-100 Y-60 K- 55 R-130 G-0 B-36 BLUE PANTONE: 5395C C-100 M-44 Y-0 K-76 R-0 G-39 B-77 YELLOW PANTONE: 392C C-7 M-0 Y-100 K-49 R-141 G-139 B-0 ROUGHAN & O'DONOVAN Waterford City & County Council Consulting Engineers Transport Hub Waterford City Public Infrastructure Project Transport Hub Part VIII Planning Report TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................... 1 SECTION 1 INTRODUCTION AND NEED FOR THE PROPOSED DEVELOPMENT ............................................................................... 2 1.1 Introduction ....................................................................................................... 2 1.2 Need for the Development ................................................................................ 2 1.2.1 Integrated Land Use and Transport Planning ...................................... 3 1.2.2 Irish Rail Service Implications ............................................................. 3 1.3 Planning Policy ................................................................................................. 5 1.3.1 National Policy .................................................................................... 5 1.3.2 Regional Policy ................................................................................... 8 1.3.3 Local Policy ......................................................................................... 8 SECTION 2 ALTERNATIVES CONSIDERED .................................................... 13 2.1 Design Brief .................................................................................................... 13 2.2 Location of the Proposed Development .......................................................... 14 2.2.1 Issues with the Existing Train Station Location ................................. 14 2.2.2 Selection of an Alternative Location .................................................. 15 2.3 Station Design Options Considered ................................................................ 16 2.3.1 Option A - ‘Do- Nothing’ .................................................................... 16 2.3.2 Option B - Architect’s Option 1 .......................................................... 17 2.3.3 Option C - Architect’s Option 2 .......................................................... 18 2.3.4 Assessment of Alternatives ............................................................... 20 2.3.5 Preferred Station Building Option ...................................................... 21 2.4 Parking Options Considered ........................................................................... 21 2.4.1 Parking Layout Option 1.................................................................... 21 2.4.2 Parking Layout Option 2.................................................................... 22 2.4.3 Preferred Option ............................................................................... 23 2.5 Flooding Defence Considerations ................................................................... 23 2.6 Conclusion...................................................................................................... 24 SECTION 3 DESCRIPTION OF THE PROPOSED DEVELOPMENT ................ 25 3.1 Introduction ..................................................................................................... 25 3.2 Site Location and Description ......................................................................... 25 3.2.1 Existing Land Uses ........................................................................... 26 3.2.2 Plunkett Train Station ........................................................................ 26 3.3 General Site Layout ........................................................................................ 27 3.4 Need for the Proposed Development .............................................................. 27 Part VIII Report Page i ROUGHAN & O'DONOVAN Waterford City & County Council Consulting Engineers Transport Hub 3.4.1 Current Location and Future Proofing ............................................... 27 3.4.2 Integrated Land Use and Transport Planning .................................... 27 3.5 Development Overview................................................................................... 28 3.6 Architectural Design ....................................................................................... 29 3.6.1 Integration with the NQ SDZ ............................................................. 29 3.6.2 Building Composition and Materials .................................................. 30 3.6.3 Station Spatial Arrangement ............................................................. 31 3.6.4 Station Capacity, Potential for Adaptability and Future Expansion of Building ............................................................................................. 32 3.6.5 Accessibility of the Station and Public Realm .................................... 32 3.6.6 Public Realm ..................................................................................... 33 3.6.7 Transport Hub/ Station Building ........................................................ 34 3.7 Transport Hub Construction Methodology ...................................................... 35 3.7.1 Flood Defences ................................................................................. 35 3.8 Traffic, transport and connectivity ................................................................... 37 3.9 Demolitions ..................................................................................................... 38 3.10 Drainage Design ............................................................................................. 39 3.11 Landscaping ................................................................................................... 39 3.11.1 Lighting Design ................................................................................. 40 3.12 Maintenance and Operation ........................................................................... 41 3.12.1 Waste and Water Supply .................................................................. 41 3.12.2 Station Building ................................................................................. 41 3.13 Outline Construction Stage Sequence and Methodology ................................ 43 3.13.1 Overview of Works ............................................................................ 43 3.13.2 Outline Construction Stage Sequence and Methodology .................. 44 3.13.3 Operational Stage Programme and Sequence .................................. 46 3.14 Construction Materials .................................................................................... 47 3.15 Construction Traffic ........................................................................................ 47 3.16 Employment ................................................................................................... 48 3.17 Construction Environmental Management Plan .............................................. 48 3.18 Environmental Operating Plan ........................................................................ 50 3.19 Construction and Demolition Waste Management Plan .................................. 50 3.19.1 Relationship with Other Projects ....................................................... 51 SECTION 4 ENVIRONMENTAL CONSIDERATIONS AND MITIGATION MEASURES.................................................................................... 52 4.1 Traffic and Transport ...................................................................................... 52 4.1.1 Introduction ....................................................................................... 52 4.1.2 Methodology ..................................................................................... 52 4.1.3 Relevant Characteristics of the Proposed Development.................... 52 4.1.4 Receiving Environment ..................................................................... 53 4.1.5 Road Safety ...................................................................................... 61 4.1.6 Predicted Impacts ............................................................................. 64 4.1.7 Mitigation Measures .......................................................................... 71 Part VIII Report Page ii ROUGHAN & O'DONOVAN Waterford City & County Council Consulting Engineers Transport Hub 4.2 Population and Human Health ........................................................................ 72 4.2.1 Introduction ....................................................................................... 72 4.2.2 Methodology ..................................................................................... 72 4.2.3 Relevant Characteristics of Proposed Development ......................... 72 4.2.4 Receiving Environment ..................................................................... 73 4.2.5 Predicted Impacts ............................................................................. 75 4.2.6 Mitigation and Monitoring Measures.................................................. 77 4.2.7 Residual Impacts .............................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    300 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us