Medomak River – 2019

Medomak River – 2019

MEDOMAK RIVER Reflecting on the Success of Remediating Fecal Pollution Using a Collaborative Task Force Julie Keizer, Town Manager, Waldoboro ME Maggie Burns, Hydrologist, FB Environmental Associates Photo by: Melissa Smith Maine DMR Julie Keizer, Town Manager Town of Waldoboro, Maine Maggie Burns, Hydrologist FB Environmental WALDOBORO MEDOMAK RIVER MEDOMAK Photo by: Julie Keizer Photo by: Melissa Smith Maine DMR SOFTSHELL CLAMS Photo by: Julie Keizer VALUE OF SOFTSHELL CLAMS IN WALDOBORO: Year Pounds (Live) Value 2007 935,455 $1,296,841 2008 894,930 $1,118,548 2009 353,571 $391,813 2010 611,145 $747,529 2011 1,030,154 $1,406,147 2012 653,879 $914,055 2013 726,879 $1,144,579 2014 410,005 $752,623 2015 847,192 $2,223,605 2016 980,592 $2,108,897 1.5 – 2.2 million in value 2017 910,903 $1,604,253 FILTER FEEDERS Clams clean our waters OCEAN POLLUTION BACTERIA CLASSIFICATION OF MAINE WATERS Freshwater Marine FRESHWATER CLASSIFICATION CLASS AA: East Machias River, CLASS A: Ellis River, Andover ME CLASS B: Androscoggin River, Machias ME Rumford ME CLASS C: Capisic Brook, Portland ME MARINE CLASSIFICATION CLASS SA: Dennys Bay, Pembroke CLASS SB: Atkins Bay, Phippsburg ME ME CLASS SC: Casco Bay, Portland ME Photo from: City of Portland SHELLFISH CLASSIFICATION Conditionally Approved: Harvesting is allowed except during specified conditions. Example: Rainfall and Seasonal closures. Conditionally Restricted: Depuration and/or relay harvesting allowed except during specified conditions. Prohibited: No harvesting allowed or water use allowed for processing. Restricted: Depuration and/or relay harvesting only. MAINE DEP: Freshwater Class A: above Wagner’s Bridge Road and all tributaries Class B: Head of Tide to Wagner’s Bridge Road MAINE DMR: Marine Waters Conditionally Approved: WS26C1 and WS26D Prohibited: WS26A1 BRIEF HISTORY Photo by: Melissa Smith Maine DMR 1 9 9 0 ’ s 2001 2002 2003 - 2004 2008 - 2009 2013 2014 • River not • Lagoon and land • DMR imposes • Maine DEP survey work in • Elevated bacteria • The Medomak Task Force • Paired three-day wet/dry meeting class application conditional direct watershed area following rain persists begins (January 2013) weather studies in village • Wastewater treatment facility rainfall closures around conditional • Maine DMR (with Maine • DMR increases routine • DMR sampling reduced to treatment facility constructed period of 2 closures DEP assistance) conducts sampling (goal = six times per year discharges • Wastewater weeks on • Involved UMaine another survey in once/month) • Sampling upstream of US effluent directly discharge Medomak River Cooperative Extension conditional areas • Volunteers sampled on Rte 1 continued to Medomak terminated days 1 and 3 post-rain • Canine detection River estuary August 20, 2001 (events > 1”/24hrs). DMR survey samples on days 5 and 7. • Sampling upstream of US MEDOMAK RIVER PROJECT TIMELINE Rte 1 2019 2018 2017 2016 2015 • Watershed-based • As part of the WBMP, the • Task Force submits • Paired E. coli and • Subgroup designed 2015 Management Plan task force completes proposal for Maine DEP microbial source tracking sampling; sampling of published storm event sampling in 604(b) funds for (MST) sampling small tidewater tributary June Watershed-Based • Monthly routine DMR streams • Gabby Hillyer, UMaine, Management Plan sampling continued • Routine DMR sampling = SANITARY SURVEY WORK (Winslow’s conducts drifter study to • Monthly routine DMR increased to monthly (12 Mills Road, Village Area, Depot Street, model hydrodynamic sampling continued times per year) Deb’s Diner Drainage, Orff Brook, flushing • Sampling upstream of US Benner Brook, Skyview Ridge Mobile • DMR continues routine Rte 1 continued Home Park) sampling • Beaver dams removed = UNDER 604(b) PLANNING GRANT 1 9 9 0 ’ s 2001 2002 2003 - 2004 2008 - 2009 2013 2014 • River not • Lagoon and • DMR imposes • Maine DEP survey work in • Elevated bacteria • The Medomak Task Force • Paired three-day wet/dry meeting class land conditional direct watershed area following rain persists begins (January 2013) weather studies in village • Wastewater application rainfall closures around conditional • Maine DMR (with Maine • DMR increases routine • DMR sampling reduced to period of 2 closures DEP assistance) conducts six times per year treatment treatment sampling (goal = weeks on • Involved UMaine another survey in once/month) • Sampling upstream of US facility facility Medomak River Cooperative Extension conditional areas • Volunteers sampled on Rte 1 continued discharges constructed days 1 and 3 post-rain • Canine detection effluent • Wastewater (events > 1”/24hrs). DMR survey directly to discharge samples on days 5 and 7. Medomak terminated • Sampling upstream of US River estuary AugustMEDOMAK 20, RIVER PROJECT TIMELINE Rte 1 2001 2019 2018 2017 2016 2015 • Watershed-based • As part of the WBMP, the • Task Force submits • Paired E. coli and • Subgroup designed 2015 Management Plan task force completes proposal for Maine DEP microbial source tracking sampling; sampling of published storm event sampling in 604(b) funds for (MST) sampling small tidewater tributary June Watershed-Based • Monthly routine DMR streams • Gabby Hillyer, UMaine, Management Plan sampling continued • Routine DMR sampling = SANITARY SURVEY WORK (Winslow’s conducts drifter study to • Monthly routine DMR increased to monthly (12 Mills Road, Village Area, Depot Street, model hydrodynamic sampling continued times per year) Deb’s Diner Drainage, Orff Brook, flushing • Sampling upstream of US Benner Brook, Skyview Ridge Mobile • DMR continues routine Rte 1 continued Home Park) sampling • Beaver dams removed = UNDER 604(b) PLANNING GRANT 1 9 9 0 ’ s 2001 2002 2003 - 2004 2008 - 2009 2013 2014 • River not • Lagoon and land • DMR imposes • Maine DEP survey work in • Elevated bacteria • The Medomak Task Force • Paired three-day wet/dry meeting class application conditional direct watershed area following rain persists begins (January 2013) weather studies in village • Wastewater treatment facility rainfall around conditional • Maine DMR (with Maine • DMR increases routine • DMR sampling reduced to treatment facility constructed closures DEP assistance) conducts six times per year closures sampling (goal = discharges • Wastewater • Involved UMaine another survey in once/month) • Sampling upstream of US effluent directly discharge period of 2 Cooperative Extension conditional areas • Volunteers sampled on Rte 1 continued to Medomak terminated weeks on days 1 and 3 post-rain • Canine detection River estuary August 20, 2001 Medomak (events > 1”/24hrs). DMR survey River samples on days 5 and 7. • Sampling upstream of US MEDOMAK RIVER PROJECT TIMELINE Rte 1 2019 2018 2017 2016 2015 • Watershed-based • As part of the WBMP, the • Task Force submits • Paired E. coli and • Subgroup designed 2015 Management Plan task force completes proposal for Maine DEP microbial source tracking sampling; sampling of published storm event sampling in 604(b) funds for (MST) sampling small tidewater tributary June Watershed-Based • Monthly routine DMR streams • Gabby Hillyer, UMaine, Management Plan sampling continued • Routine DMR sampling = SANITARY SURVEY WORK (Winslow’s conducts drifter study to • Monthly routine DMR increased to monthly (12 Mills Road, Village Area, Depot Street, model hydrodynamic sampling continued times per year) Deb’s Diner Drainage, Orff Brook, flushing • Sampling upstream of US Benner Brook, Skyview Ridge Mobile • DMR continues routine Rte 1 continued Home Park) sampling • Beaver dams removed = UNDER 604(b) PLANNING GRANT ABDEN GLEN 1 9 9 0 ’ s 2001 2002 2003 - 2004 2008 - 2009 2013 2014 • River not • Lagoon and land • DMR imposes • Maine DEP survey work in • Elevated bacteria • The Medomak Task • Paired three-day wet/dry meeting class application conditional direct watershed area following rain persists Force begins (January weather studies in village • Wastewater treatment facility rainfall closures around conditional • Maine DMR (with Maine • 2013) DMR sampling reduced to treatment facility constructed period of 2 closures DEP assistance) conducts six times per year • DMR increases routine discharges • Wastewater weeks on • Involved UMaine another survey in • Sampling upstream of US sampling (goal = effluent directly discharge Medomak River Cooperative Extension conditional areas Rte 1 continued once/month) to Medomak terminated • Canine detection • Volunteers sampled on River estuary August 20, 2001 survey days 1 and 3 post-rain (events > 1”/24hrs). DMR samples on days 5 and 7. MEDOMAK RIVER PROJECT TIMELINE • Sampling upstream of US Rte 1 2019 2018 2017 2016 2015 • Watershed-based • As part of the WBMP, the • Task Force submits • Paired E. coli and • Subgroup designed 2015 Management Plan task force completes proposal for Maine DEP microbial source tracking sampling; sampling of published storm event sampling in 604(b) funds for (MST) sampling small tidewater tributary June Watershed-Based • Monthly routine DMR streams • Gabby Hillyer, UMaine, Management Plan sampling continued • Routine DMR sampling = SANITARY SURVEY WORK (Winslow’s conducts drifter study to • Monthly routine DMR increased to monthly (12 Mills Road, Village Area, Depot Street, model hydrodynamic sampling continued times per year) Deb’s Diner Drainage, Orff Brook, flushing • Sampling upstream of US Benner Brook, Skyview Ridge Mobile • DMR continues routine Rte 1 continued Home Park) sampling • Beaver dams removed = UNDER 604(b)Photo PLANNING by: Julie GRANT Keizer Photo by: Bridie

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    40 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us