Halifax Harbour Solutions Project

Halifax Harbour Solutions Project

Halifax Harbour Solutions Project March 25, 2008 Harbour Solutions Project 3 Key Components of Harbour Solutions Project: • Sewage Collection System • Wastewater Treatment Facilities • Biosolids (sludge) management Harbour Solutions Project - Facts v Harbour Solutions Project Budget - $333 million v 5 years of construction v 5000 person-years employment v 16.3 kilometres of pipe v 1060-metre underground tunnel bored using TBM (tunnel boring machine) v 42,750CM of concrete Sewage Collection System Dexter Const. to design & build, HRM owns & operates • Collects sewage and carries to WWTF’s • Covers complete design and construction of roads, piping, tunnel, CSOs, outfalls, diffusers and pumping stations v Groundbreaking November 12, 2003 • Construction essentially complete in Halifax & Dartmouth.Underway in Herring Cove Treatment Facility Design & Construction 3 wastewater treatment facility sites • Downtown Halifax at Cornwallis and Barrington St. • Dartmouth, south end of the Coast Guard lands • Hospital Point in Herring Cove • Advanced Primary Treatment Facilities designed to blend in visually, no noise or odour, under negative pressure, UV disinfection Biosolids Management • By product of the wastewater treatment process • Dewatered sludge removed from settling tanks and transported to sludge processing facility • Operational November 2007 BiosolidsBiosolids-- BeneficialBeneficial Use!Use! Meets:- USEPA Class A - AGCAN/CFIA Fertilizer Act vUsed for land reclamation, top-soil manufacturing, yard waste composting, agriculture BiosolidsBiosolids TruckTruck HalifaxHalifax WWTFWWTF--Nov.Nov. 20072007 GroundbreakingGroundbreaking NovemberNovember 20032003 TunnelTunnel--DowntownDowntown HalifaxHalifax--AprilApril 20052005 Dec 17/04 P1010003 TowerTower Rd.Rd. PipePipe BridgeBridge DecemberDecember 20042004 Nov-07-06 (P1015220) Barrington St. Piping -November 2006 Jan 5/05 P1010054 Pipe Installation- Sackville St. Jan. 2005 TrencherTrencher inin DartmouthDartmouth -- SummerSummer 20052005 32,000KG32,000KG ManholeManhole--JuneJune 20052005 Halifax Outfall Pipe Sailing –December 2004 Dartmouth Outfall Pipe Sailing –April 2006 ASTASTASTAST PumpingPumping PumpingPumping StationStation StationStation--NovemberNovember--OctoberOctober 20052005 20062006 PierPier AA PumpingPumping StationStation--NovemberNovember 20062006 BalmoralBalmoral PumpingPumping StationStation--NovemberNovember 20062006 CircaCirca 18131813 shipwreckshipwreck discovereddiscovered –– DartmouthDartmouth shoreline,shoreline, OctoberOctober 20052005 OpeationalOpeationalHalifaxHalifax WWTFWWTFSpring/SummerSpring/Summer FallFall 20072007 20082008 Dartmouth- architectural rendering OperationalOperational Spring/SummerSpring/Summer 20082008 HerringHerring CoveCove--architecturalarchitectural renderingrendering OperationalOperational FallFall 20082008 HalifaxHalifax WWTFWWTF SiteSite--OctoberOctober 20042004 HalifaxHalifaxHalifaxHalifax WWTFWWTF WTPWTP SiteSite SiteSite--SeptemberSeptember --NovemberNovember 20052005 20062006 HalifaxHalifax WWTFWWTF SiteSite ––AugustAugust 20072007 Halifax WWTF Opening –February 11, 2008 DartmouthDartmouth WWTFWWTF SiteSite --OctoberOctober 20052005 DartmouthDartmouthDartmouth WTP WWTFWWTF Access DrivewaySiteSite--NovemberNovember-October 200620062005 DartmouthDartmouth WWTFWWTF SiteSite--AugustAugust 20072007 HerringHerring CoveCove WWTFWWTF SiteSite--JuneJune 20062006 HerringHerring CoveCove WWTFWWTF SiteSite--NovemberNovember 20062006 HerringHerring CoveCove WWTFWWTF SiteSite--AugustAugust 20072007 Long Term Goals of the HSP ü Greatly improved water quality in the Harbour ü Increased property values ü Increased tourism revenues ü Renewed shellfish harvesting ü Improved marine ecosystem health ü Avoided health costs due to water-related illnesses ü Increased recreational opportunities ü Overall enhanced quality of life for HRM Halifax Waterfront Before WWTF Treatment Halifax Waterfront After WWTF Treatment Harbour Solutions Project - Water Sampling In Halifax Harbour Pollution Prevention Program • Wastewater Discharge By-law • Working with businesses to identify harmful waste materials and limit their use or disposal • Support efforts of Federal Government to stop dumping of ship wastewater in the harbour • Pesticide By-law • Extensive public education/stewardship program underway Pollution Prevention Program – Water Testing How Can You & Your Family Help? • Reduce or eliminate the use of hazardous products at home • Don’t pour leftover cleaning products, paints, solvents and pesticides down the drain at home. Take them to the Household Hazardous Waste Depot, 50 Chain Lake Dr. • Encourage responsible disposal practices at home, your place of business, & composting and recycling • Support HRM’s environmental programs • Conserve water How Can You Stay Informed? • Naturally Green Newsletter • HRM Website (www.halifax.ca/harboursol) • E-mail ([email protected]) • HRM Call Centre (490-4000) • Harbour Solutions Project Office (490-4756) • News Releases • Public Meetings Questions? Fire Away!.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us