East Link Light Rail

East Link Light Rail

East Link light rail Segment E: Redmond July 2011 Segment Details Segment E is a future extension to Redmond with trains running from Overlake Transit Center along SR-520 into downtown Redmond. There is only one option along SR-520; however, the E2 2011 Final Environmental Impact Statement (FEIS) evaluates three E2 route alternatives through downtown Redmond. The preferred alternative, E2, crosses under the SR-520 and SR-202 interchange and enters a portion of the abandoned BNSF railroad track. The alignment crosses under SR-520 and over Bear Creek, then E2 becomes at-grade to cross 170th Avenue NE. Trains will continue west along the BNSF to the end of the line near Redmond Town Center, just northwest of Leary Way. Preferred Alternative E2 could include two stations. Stations would be located at: E2 • SE Redmond Station: Located at the northeast end of Marymoor Park on the south side of the SR-520 and SR-202 interchange. Includes a five-story parking structure with 1,400 parking spaces. • Downtown Redmond Station: Located near Redmond Town Center. Benefits • Provides access to high quality, frequent transit service that E2 (Preferred Alternative) and other EIS Alternatives operates 20 hours per day. • Approximately 3,500 daily boardings would occur in this area. • Supports the dense, transit-oriented land use redevelopment plans of Redmond. • Provides increased access opportunities at the SE Redmond parking lot and Redmond Town Center. Redmond Town Center Sound Transit • 401 S. Jackson St. Seattle WA 98104 For information in alternative formats, call 1-800-201-4900/TTY Relay: 711 or email: [email protected] Constructing light rail to Redmond Travel times* (from Downtown Redmond Station) As part of the ST2 plan, voters approved funding for the • International District/Chinatown = 36-39 minutes preliminary design and environmental study of light rail to Redmond. However, funding has not been approved for the final • University of Washington = 46-49 minutes design, construction and operation of light rail between Overlake • Bellevue Transit Center = 16 minutes Transit Center and downtown Redmond. Additional funding will • Overlake Transit Center = 6 minutes need to be identified before light rail will serve Redmond Town Center and communities northeast and southeast of Redmond. * Reflects preferred alternative travel times Marymoor Park in Redmond For more information: Project Web page: www.soundtransit.org/eastlink Contact: Emily Mannetti Sound Transit Community Outreach Coordinator 206-398-5438 • [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us