Cape Lambert Port A-Dolphin (Australia)

Cape Lambert Port A-Dolphin (Australia)

Project informations Cape Lambert Port A-Dolphin (Australia) © 2021 Austral & RIO Tinto Project description mageba scope Highlights & facts Rio Tinto owns an integrated portfolio of For this project in total 36 RESTON® iron ore assets in the Pilbara region of SPHERICAL bearings with uplift restraint mageba products: Western Australia including 16 mines, 4 in- were produced and installed. Type: RESTON®SPHERICAL dependent port terminals, a 1,700 km rail The bearings were designed to perform in bearings network and other related infrastructure. harsh environment, therefore their fabri- Feature: Uplift restraint One of its facilities is the Cape Lambert cation had to follow a strict quality control Installed: 2020 iron-ore port which is located about process. 1,250 km north of the Western Australian In order to ensure that the quality of the Structure: capital of Perth. steel used for the production of the bear- City: Port Walcott (WA) The Cape Lambert “A” wharf has been in ings is the highest, at the procurement Country: Australia operation since 1972, but its original 17 stage, each steel plate’s mechanical and Type: Wharf dolphins were either demolished or de- chemical properties were tested in a third Owner: Rio Tinto commissioned in 1999. The existing and party ILAC accredited Lab to ensure their Contractor: Austral Construction still operational dolphins were installed compliance to the AS3678 requirements. Pty Ltd between 2001 and 2002. In addition, mageba also commissioned Structural designer: Aurecon During a recent structural integrity inspec- the same lab to perform an ultrasonic test- tions of the entire system, structural de- ing on each steel plate to meet with AS fects were identified. With some of these 1710 – Level 2. defects reportedly reducing the structural After their fabrication was completed, the capacity of the existing dolphins, the re- bearings were tested to the designed load placement of the deteriorated dolphins in mageba’s NATA accredited lab in Sydney was proposed. as per MRWA Spec 861 & AS5100.4. The wharf is located approx. 2.5 km northeast A bearing is prepared for testing in mageba’s NATA Installation of RESTON®SPHERICAL bearings on the offshore of Cape Lambert at Port Walcott certified lab superstructure manufactured in Shanghai Cape Lambert © 2020 Google 2021.02 AU-EN ©mageba mageba (Australia) Pty. Ltd. – Unit 8, 42 Peter Brock Drive, Eastern Creek NSW 2766 – Australia – T +61 2 8188 5850 – [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us