Hualapai Tribal Utility Project

Hualapai Tribal Utility Project

HualapaiHualapai TribalTribal UtilityUtility ProjectProject DOEDOE FirstFirst StepStepss PrograProgramm JackJack EhrhardtEhrhardt -- HualapaiHualapai PlanningPlanning DirectorDirector WHOWHO WEWE AREARE ¾ ~1 MILLION ACRES IN NW ARIZONA ¾ 108 MILES OF THE GRAND CANYON ¾ 2500 Members ¾ Peach Springs Community ¾ ~240 electric customers ECONOMICECONOMIC SITUATIONSITUATION ¾¾ VeryVery RuRuralral-- LittleLittle opportunityopportunity forfor commercialcommercial developmentdevelopment ¾¾ RouteRoute 6666 passespasses throughthrough PeachPeach SpringsSprings ¾¾ RiverRiver RunnersRunners TourismTourism EnterpriseEnterprise ¾¾ HualapaiHualapai LodgeLodge ¾¾ GrandGrand CanyonCanyon WestWest TourismTourism EnterpriseEnterprise ¾¾ HuntingHunting andand FishingFishing ¾¾ TimberTimber EnergyEnergy SituationSituation ¾ MohaveMohave ElectricElectric SServeserves HualapaiHualapai ¾ 7575--milemile PowerlinePowerline toto HavasupaiHavasupai -- BIABIA ¾ NoNo PowerPower atat GrandGrand CanyonCanyon WestWest ¾ NoNo PowerPower toto mostmost ofof ReservationReservation ¾ WAPAWAPA AllocationAllocation SoldSold toto NTUANTUA ¾ ElectricElectric LoadLoad ~~ 800800 kilowattskilowatts ¾ EnergyEnergy Resources:Resources: z Solar z Wind EnergyEnergy ProjectsProjects ¾¾ EarthshipEarthship -- NatuNaturalral ResoResourceurcess OfOfficefice z PassivePassive SolarSolar z PhotovoltaicsPhotovoltaics z WaterWater ConservationConservation SolarSolar WaterWater PipelinePipeline ¾ WaterWater forfor GrandGrand CanyonCanyon WestWest ¾ 2626 MilesMiles ¾ UpgradeUpgrade UnderwayUnderway GuanoGuano PointPoint ¾ 2.52.5 kilowattskilowatts forfor lights,lights, appliances,appliances, andand evapevap coolingcooling EnergyEnergy ProjectsProjects ¾¾ USDAUSDA--RUSRUS HighHigh EnergyEnergy CostCost RuralRural CommunitiesCommunities z GrandGrand CanyonCanyon WestWest PowerPower ProjectProject ¾¾ BIABIA MineralMineral AssessmentAssessment ProgramProgram z WindWind AssessmentAssessment ¾¾ DOEDOE FirstFirst StepsSteps TowardToward RenewablesRenewables DevelopmentDevelopment onon TribalTribal LandsLands z TribalTribal UtilityUtility FeasibilityFeasibility StudyStudy GCWGCW PowerPower ProjectProject ¾¾ $2$2 MillionMillion GrantGrant -- RuralRural UtilitiesUtilities ServiceService ¾¾ 1212 kVkV undergroundunderground powerpower distributiondistribution systemsystem ¾¾ SolarSolar HybridHybrid PowerPower PlantPlant z PhotovoltaicsPhotovoltaics oror ThermalThermal z BioBio--dieseldiesel BackupBackup z WindWind ¾¾ RFPRFP forfor DesignDesign--BuildBuild isis outout -- duedue 1010--2525 BIABIA WindWind AssessmentAssessment ¾ DOE 20-meter tower at Peach Springs z Community Power Project z Low Class 3 ¾ BIA 50-meter assessments z Peach Springs - Community Power - 2-5 MW z Blue Mountain - Wind Farm 5-10 MW z Grand Canyon West - Integration with Solar Hybrid system z Wind Energy Marketing to Arizona Power Authority, State Facilities, WAPA, APS, Others TribalTribal UtilityUtility ¾¾ DOEDOE FirstFirst StepStepss z FeasibilityFeasibility ofof TribalTribal utilityutility toto operateoperate powerpower systemsystem atat GrandGrand CanyonCanyon WestWest z FeasibilityFeasibility ofof tribaltribal taketake--overover ofof ReservationReservation utilityutility systemsystem GrandGrand CanyonCanyon WestWest ¾ CurrentlyCurrently 150,00150,00 touriststourists annuallyannually ¾ 90009000 acreacre developmentdevelopment ¾ NoNo OvernightOvernight accommodationsaccommodations ¾ DieselDiesel GensetsGensets GCWGCW PowerPower ProjectProject ¾ 5 miles of 12kV Underground Distribution Mini-grid ¾ Solar Hybrid Power System z PV or Thermal z Wind z Bio Diesel z Hydrogen TribalTribal UtilityUtility GCWGCW ¾ Feasibility Study z Organizational Options z Operate and Maintain GCW Power System z Sell Power to Grand Canyon Resort Corporation z Provide expansion z Showcase advanced renewables technology in a pristine international setting ¾ Implementation Plan SystemSystem TakeoverTakeover ¾ Feasibility study for take over of Reservation electric service z System condition and value study • Relation to Havasupai z Power Resources • WAPA Allocation • Purchase Power • Wind z Organizational Options z Rates and Policies z Implementation Plan ProjectProject TeamTeam ¾¾ JackJack EhrhardtEhrhardt -- InfrastructureInfrastructure planningplanning ¾¾ LeonardLeonard GoldGold -- UtilityUtility OptionsOptions andand RatesRates ¾¾ KenKen SalineSaline -- LocalLocal UtilityUtility InterfaceInterface ¾¾ DeanDean SuageeSuagee -- CultureCulture andand SustainabilitySustainability ¾¾ MarkMark RandallRandall -- GCWGCW CoordinationCoordination ¾¾ TribalTribal EnvironmentalEnvironmental ReviewReview CommissionCommission -- OversightOversight.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us