EVALUATION of WULKAPRODERSDORF-SOPRON LINE (WP 6.4.1) MARCH 31St, 2014

EVALUATION of WULKAPRODERSDORF-SOPRON LINE (WP 6.4.1) MARCH 31St, 2014

BANKABLE PAPER EVALUATION OF WULKAPRODERSDORF-SOPRON LINE (WP 6.4.1) MARCH 31st, 2014 Authors: Alexander Schnabl (IHS), Gerhard Platzer (TMC), Martha Ecker (IHS), Hans Fritzsche (TMC), Brigitte Hochmuth (IHS), Sebastian Koch (IHS), Sarah Lappöhn (IHS), Alina Pohl (IHS) SETA - SOUTH EAST TRANSPORT AXIS Bankable Paper Wulkaprodersdorf-Sopron Table of contents 1 Introduction .........................................................................................6 2 Context analysis and project objectives ........................................................7 2.1 Socio – economic context ....................................................................7 2.2 Definition of project objectives ............................................................8 2.3 Consistency with EU and national frameworks ...........................................9 3 Project identification ............................................................................ 10 4 Technical Study and Feasibility study ......................................................... 11 4.1 Technical Study ............................................................................. 11 4.1.1 Calculation of investment costs ..................................................... 12 4.1.2 Calculation of infrastructure maintenance costs ................................. 14 4.1.3 Calculation of network operation costs ............................................ 15 4.2 Railway operational program .............................................................. 16 4.3 Feasibility Study ............................................................................ 19 4.3.1 Calculation of transport demand .................................................... 19 4.3.2 Development of regional traffic ..................................................... 20 4.3.3 Transportation demand by means of transport ................................... 22 4.3.4 Development 2013 - 2020 ............................................................ 24 4.3.5 Impact of project measures on choice of transport mode ....................... 24 4.3.6 Tariff revenues ......................................................................... 26 4.3.7 Reduction of road traffic ............................................................. 27 5 Financial Analysis ................................................................................. 29 5.1 Methodology ................................................................................. 29 5.2 Necessary data .............................................................................. 29 5.3 Calculations .................................................................................. 29 5.4 Results of the financial analysis .......................................................... 30 6 Savings in travel time ............................................................................ 31 6.1 Methodology ................................................................................. 31 6.2 Results ........................................................................................ 31 7 Short-term economic effects ................................................................... 33 7.1 Methodology ................................................................................. 33 7.2 Results ........................................................................................ 33 8 Long-term economic effects .................................................................... 36 8.1 Methodology ................................................................................. 36 8.2 Results ........................................................................................ 36 9 Environmental and social analysis ............................................................. 39 2 / 49 SETA - SOUTH EAST TRANSPORT AXIS Bankable Paper Wulkaprodersdorf-Sopron 9.1 Methodology ................................................................................. 39 9.2 Results ........................................................................................ 39 10 Risk Assessment ................................................................................ 42 11 Consolidated economic analysis ............................................................. 43 11.1 Financial Analysis ........................................................................... 44 11.2 Savings in travel time ...................................................................... 44 11.3 Short-term economic effects .............................................................. 44 11.4 Long-term economic effects .............................................................. 45 11.5 Environmental and social analysis ........................................................ 45 11.6 Consolidated economic analysis .......................................................... 45 11.7 Conclusions .................................................................................. 47 12 References ...................................................................................... 49 3 / 49 SETA - SOUTH EAST TRANSPORT AXIS Bankable Paper Wulkaprodersdorf-Sopron List of tables Table 1: Investment costs: Sopron – Wulkaprodersdorf - Ebenfurth ........................... 14 Table 2: Infrastructural and maintenance costs .................................................. 15 Table 3: Network operation costs ................................................................... 16 Table 4: Operation costs of rail operation and infrastructure revenues ....................... 18 Table 5: Population development and development of commuting 2013 – 2020 ............. 21 Table 6: Calculation of daily trips to the main centres by means of transport 2013 for the whole project area and the “Core Area”) .......................................................... 22 Table 7: Calculation of daily trips to the main centres by means of transport 2010/0 for the whole project area and the “Core Area”) .......................................................... 24 Table 8: Calculation of daily trips to the main centres by means of transport 2020/1 for the whole project area and the “Core Area”) .......................................................... 25 Table 9: Daily passenger trips: difference 2013 -2020/0 – 2020/1 by means of transport (Source: TMC 2014) .................................................................................... 26 Table 10: Calculation of tariff revenues ........................................................... 27 Table 11: Calculation of road traffic reductions (TMC, 2013) ................................... 28 Table 12: Results of dynamic investment analysis, financial base scenario, in Mio. € ...... 30 Table 13: Assumptions for monetization of travel time savings ................................ 31 Table 14: Economic effects on value added in countries and regions, in million EUR (base year 2012, present value) ............................................................................ 33 Table 15: Economic effects on employment in person-years and in full-time equivalent employees on a country and regional basis ........................................................ 34 Table 16: Fiscal effects at national level for the three alternatives, in million EUR ........ 35 Table 17: Overall economic effects due to measures, present values (only countries with large effects shown) ................................................................................... 36 Table 18: Overall regional economic effects for Austria and Hungary due to measures, present values .......................................................................................... 37 Table 19: Average additional employment during operational phase (only countries with effects > 1 shown) ..................................................................................... 37 Table 20: Additional tax revenue (only countries with effects shown) ........................ 38 Table 21: Overview of emissions reduced by measures .......................................... 39 Table 22: Present value of total positive effects of emission reductions in EUR ............. 40 Table 23: Aggregation of results, View 1 (CBA Guide), in million EUR ......................... 46 Table 24: Aggregation of results, the perspective of the involved countries (variant A), in million EUR ............................................................................................. 46 Table 25: Aggregation of results, the perspective of the EU28 (variant B), in million EUR . 47 4 / 49 SETA - SOUTH EAST TRANSPORT AXIS Bankable Paper Wulkaprodersdorf-Sopron List of figures Figure 1: project area and railway sections .........................................................8 Figure 2: The project: Alignment of a new railway track Wulkaprodersdorf – Sopron (15.5 km) ....................................................................................................... 12 Figure 3: Alignment of the new railway track Wulkaprodersdorf - Sopron (EWESO, 2000) . 13 Figure 4: Measures to be considered within the operational program ......................... 17 Figure 5: operational program 2020; railway connections/ hour (morning) .................. 17 Figure 6: recommended organisational measures for Sopron railway station ................ 18 Figure 7: Railway passenger traffic 2013 ........................................................... 23 Figure 8: Public transport (railway and busses) 2013 ...........................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us