Compact Green Roof System Snitterton Hall, Matlock – South

Compact Green Roof System Snitterton Hall, Matlock – South

Compact green roof system Snitterton Hall, Matlock – South Darley, Derbyshire Client Paul Caplan Architects Bench Architects, Buxton, www.bencharchitects.co.uk Roofing contractor Green On Top; Contractor G F Tomlinson, Derby Construction 2012 FOAMGLAS ® application Green Roof Insulation , FOAMGLAS ® TAPERED F Snitterton Hall is a privately owned Grade specified to insulate the concrete deck Vapour proof 1 listed building in the heart of Derbyshire. above the subterranean swimming pool FOAMGLAS ® insulation Using traditional materials and craftsman - and glasshouse stonewall detail. supports ship methods, this important historical Installed with fully sealed joints, using bitu - green roof system house has been carefully restored to its men based cold applied adhesive, the all www.foamglas.co.uk former splendour. The addition of a new glass, closed cell FOAMGLAS ® insulation sub terranean swimming pool provides a does not allow for the passage of water modern contrast with the entrance, leading vapour and prevents the nuisance of inter - from the late Elizabethan-Jacobean style stitial condensation, associated with high gardens into the reinstated mid-18 th to risk buildings such as swimming pools. early-19 th century glasshouse. The ground The FOAMGLAS ® TAPERED T4+ insulation floor features an entrance lobby area, does not compress or deform under load; mezzanine with balconies and planters to offering compressive strength of 600 kPa, the north and south walls with edge the compact roof system fully supports the Build-up lighting to the glass fronts. A staircase pro - primary waterproofing layer and the loads 1 Concrete roof deck vides access to the subterranean pool level associated from the green roof build-up. 2 Primer coat 3 FOAMGLAS ® READY BLOCK or comprising stainless steel pool, sanitary 4 FOAMGLAS ® READY BLOCK spaces and the plant room. In order to TAPER ED, adhesive bonded allow access for the building works to take 7 5 Two layers of bitumen place, the dismantling and reconstruction waterproofing membranes 5 6 6 Separation / protection layer of the grade II listed curtilage wall was a 7 Planting central element of the works, containing 3 4 (extensive or intensive) both the structure and services to the pool. 2 Every stone was labelled, stored and meti - culously reinstated to its original position. 1 To eliminate risk from interstitial conden - sation, FOAMGLAS ® TAPERED T4+ was 1.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us