Lochaber Hydropower Scheme Consultancy Services for Rehabilitation of Scheme Infrastructure

Lochaber Hydropower Scheme Consultancy Services for Rehabilitation of Scheme Infrastructure

05_ENERGY Lochaber Hydropower Scheme Consultancy Services for Rehabilitation of Scheme Infrastructure Spilling of Laggan Dam | Photo: Multiconsult The Lochaber Hydropower Scheme was first commissioned in 1929 and expanded in two subsequent stages to provide an original installed capacity of 75 MW and an annual energy production of some 460 GWh. The scheme comprises three principal reservoirs in cascade – Spey reservoir at the upstream end, Loch Laggan and reservoir and Loch Treig. No major rehabilitation works had been undertaken of the scheme until in 2009 replanting of the power station was commenced, being completed in November 2011 providing the scheme with a new installed capacity of 90 MW and annual energy production in excess of 600 GWh. The scheme’s main tunnel has not been dewatered for 35 years due to the reliance of the adjacent aluminium smelter upon the power produced by the scheme. Multiconsult is undertaking a strategic review to assess the next stages of rehabilitation and timing of the shutdwon of the scheme. PROJECT PROJECT TYPE LOCATION CLIENT TIME PERIOD KEY NUMBERS Lochaber Hydropo- Rehabilitation of Fort William, Scotland Rio Tinto Alcan 2015 to ongoing Capacity: 5 x 18 MW | Energy wer Scheme Strategic Hydropower Project Production: 600 GWh per annum Review | Storage Capacity: 269 million cubic metres | Francis Turbines, Turbine Design Head: 214 metres SCOPE OF WORK OUR SERVICES Assistance in the strategic planning of shut- • Assembling of historical records of down of the scheme to facilitate rehabilitation the main tunnel and preparation of drawings of the main tunnel. • Preparation of 3-D model of the main tunnel • Preliminary condition assessment and cost estimate for rehabilita- tion • Modelling of the power sche- me with present condition and following rehabilitation of the main tunnel • Main tunnel headloss assessment • Study of options for isolating the main tunnel • Condition assessment of main intake gates • Assessment of works for access road and tunnel adits to enable tunnel rehabilitation • Study into the options for double isolation at Laggan Dam low level outlet 05_000, 00.00.2016 Spilling of Laggan Dam | Photo: Multiconsult www.multiconsultgroup.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us