Annexure- III Sl Project Cost Present Status of Work Source of Name of the Work with Site Details No

Annexure- III Sl Project Cost Present Status of Work Source of Name of the Work with Site Details No

Annexure- III Sl Project Cost Present status of work Source of Name of the work with site details No. (Rs.) Proposed ongoing completed Fund Const. of shopping complex at 1 31.16 Completed RIDF XVI Dangarhat. Cost. Of 16 nos. stall at 32.00 Completed RKVY 2 Khochabarihat. Construction of market stall at 33.28 Completed RIDF- XVI 3 Nazirhat. Construction of stall at 61.62 Completed RIDF- XVI 4 Bhetagurihat. Construction of market complex 87.95 Completed RKVY = 5 at Nishiganj hat. 50% own fund 50% Construction of 1st floor market 52.91 Completed Own Fund 6 complex at Nishiganj market. Construction of market complex 169.75 Completed Own Fund 7 at Boxirhat Construction of concrete drain at 14.03 Completed Own Fund 8 Nazirhat. Construction of stall at 1st floor at 43.49 Completed Own Fund 9 Chowrahat. Infrastructure development of 264.00 Completed RIDF 10 Premcaderhat under Cooch Behar Zilla RMC. Infrastructure development of 67.00 Completed RIDF 11 Jamaldahat under Cooch Behar Zilla RMC. Infrastructure development of 203.00 Completed RIDF 12 Nishiganj under Cooch Behar Zilla RMC. Infrastructure development of 68.00 Completed RIDF 13 Dewanhat under Cooch Behar Zilla RMC. Infrastructure development of 217.00 Completed RIDF 14 Balarampurhat under Cooch Behar Zilla RMC. Infrastructure development of 333.00 Completed RIDF 15 Chilakhanahat under Cooch Behar Zilla RMC. Infrastructure development of 190.00 Completed RIDF 16 Pundibarhat(Extn.) under Cooch Behar Zilla RMC. Construction of market complex 68.03 Completed RIDF 17 at Nazirhat under CBZRMC. Construction of modern fish Completed 18 market at Mathabhanga market 607.00 RIDF under CBZRMC. Infrastructure development of State 19 50.00 Completed Nayerhat under CBZRMC. Budget Construction of paddy auction Completed State 20 shed at Maruganj under COB Zilla 24.41 Budget RMC. Construction of paddy auction Completed State 21 shed at Khochabari market under 24.67 Budget COB Zilla RMC. Construction of paddy auction Completed State 22 shed at Maghpala market under 24.51 Budget COB Zilla RMC. Construction of paddy auction Completed State 23 shed at Dhapra hat market under 24.57 Budget COB Zilla RMC. Construction of paddy auction Completed State 24 shed at Patlakhowa market 24.57 Budget under COB Zilla RMC. Construction of Tobacco Auction Completed 25 Shed at Sitai Krisak Bazar within 20.41 RKVY Cooch Behar Zilla RMC. Construction of Fish Shed at Completed 26 Rampur market under COB Zilla 11.51 Own Fund RMC. Construction of Vegetable Shed Completed 27 at Rampur market under COB 12.52 Own Fund Zilla RMC. Construction of Vegetable Completed Auction Shed at Mathabhanga- I 28 8.80 RKVY Krisak Bazar within Cooch Behar Zilla RMC. Constrution of surface drainwith 29 RCC Slab within Nazirhat, 14.45 completed Own Fund Dinhata. Installation of LED Light at Own Fund 30 11.00 completed Nazirhat. Installation of LED Light at Own Fund 31 8.62 completed Bhetaguri market. Installation of LED Light at Own Fund 32 8.45 completed Gossanimari market. Installation of LED Light at Own Fund 33 Natabari, Chalakhana & 33.59 completed Deocharai market. Installation of LED Light at Own Fund 34 Balarampur, Dowaguri & 22.10 completed Dewanhat market. Construction of Sulav Souchagar Own Fund 35 at Baxirhat market under 16.14 completed Tufanganj- II Block. Construction of market shed at Own Fund 36 Natabari bazaar under Natabari- I 12.17 completed GP with Tufanganj- I PS. Construction of pucca road Own Fund &drain at Dhaprahat with 37 10.13 completed Kuchlibari GP under Mekhliganj PS. Construction of Rice Shed at Own Fund 38 Baneswar bazaar under 15.06 completed Baneswar GP within COB- II PS. Construction of marketing house Own Fund at Dakghara bazaar with 39 10.48 completed Barakoimari GP under Sitalkuchi PS. Construction of Toilet Block, Own Fund 40 Concrete Pavement & Compound 6.99 completed filling at Nayerhat GP. Construction of Concrete road at Own Fund 41 7.10 completed Kurshahat bazaar. Construction of Market Shed at Own Fund 42 12.27 completed Bara Atiabari market. Construction of Marketing House Own Fund 43 at Dowaguri market within COB- I 22.78 completed PS. Construction of Auction Shed at Own Fund 44 Kisanganj market within Dinhata- 8.84 completed II PS. Construction of market link road Own Fund 45 in front of Sahebganj market 6.07 completed under Dinhata- II PS. Construction of VAT at PMY, Own Fund 46 14.32 completed Dinhata. Construction Auction Shed & Own Fund 47 Concrete Passage at Baramaricha 20.08 completed market. Construction of Toilet complex at Own Fund 48 8.91 completed Nazirhat. Construction of stall at 1st Floor Own Fund 49 of Chowrahat (East), Block- D, 43.49 completed Dinhata. Upgradation of concrete passage Own Fund 50 5.73 completed within Ghughumari market Construction of concrete passage Own Fund 51 7.94 completed at Gidharihat, Dinhata. Construction of concrete drain at Own Fund 52 4.87 completed Gosierhat market. Construction of Administrative Own Fund 53 156.17 completed Building of CBZ RMC. Construction of 103 nos. of toilet Own Fund 54 block within District of Cooch 194.43 Completed Behar. Repairing and renovation of Own Fund Paddy auction shed at Boxirhat (2 55 4.49 Completed nos.) under Cooch Behar Zilla RMC. Supplying and Errection of Sign Own Fund 56 Board at Different markets under 4.83 Completed Cooch Behar Zilla RMC. Construction of conc. Road and Own Fund sitting arrangement at Vetaguri 57 14.12 Completed market under Cooch Behar Zilla RMC. Construction of conc. Road with Own Fund 58 slab (main road side) at Boxirhat 4.81 Completed under Cooch Behar Zilla RMC. Construction of conc. Road with Own Fund 59 slab at Nishiganj market under 3.23 ongoing Cooch Behar Zilla RMC. Installation of LED Light at Own Fund 60 4.84 Completed Salmara market. Installation of LED Light at Own Fund 61 Chowdhuri hat under Cooch 4.96 Completed Behar Zilla RMC. Installation of LED Light at Own Fund 62 Tufanganj Ranirhat under Cooch 3.28 Completed Behar Zilla RMC.(Ist phase). Installation of LED Light at Own Fund 63 Tufanganj Ranirhat under Cooch 3.28 Completed Behar Zilla RMC.(2nd phase). repairing of existing Godown at Own Fund 64 Dodearhat under Cooch Behar 3.15 Completed Zilla RMC. Boulder protection work at the Own Fund side of existing Godown at 65 2.08 Completed Dodearhat underCooch Behar Zilla RMC. construction of Conc. Drain at Own Fund 66 Baneswar Hat under Cooch Behar 4.58 ongoing Zilla RMC. Clearing of drain and garbage Own Fund from the hat ground of Nishigang 67 5.22 Completed hat, Dodearhat, Dhaprahat, dewanhat , Vetagurihat etc. Repairing and renovation of conc. Own Fund 68 Drain at boxirhat under Cooch 3.18 Completed Behar Zilla RMC. construction of Conc. Passage at Own Fund 69 Jayantirhat under Cooch Behar 3.37 Completed Zilla RMC. Constrauction of conc. Drain with Own Fund slab from Swapan Mallik shop to 70 River via vegetable market at 4.57 Completed Bairagirhat under Cooch Behar Zilla RMC. Repairing and renovation of Own Fund conc. Drain infront of the 71 3.39 Completed Baneswar Temple under Cooch Behar Zilla RMC. Constrauction of conc. passage Own Fund from Uttam Pal's shop to Swapan 72 4.66 Completed Mallik shop at Bairagirhat under Cooch Behar Zilla RMC. Repairing of conc. Passage at Own Fund vegetable market , Fish market 73 and grocessary market at 3.32 Completed Tufanganj Ranirhat market under Cooch Behar Zilla RMC. construction of pavement infront Own Fund 74 of the Baneswar Shib temple 4.85 Completed under Cooch Behar Zilla RMC. Constrauction of conc. passage Own Fund from Jatin Sarker shop to 75 2.49 Completed vegetable market at Bairagirhat under Cooch Behar Zilla RMC. Repairing of drain with slab on Own Fund fish market and vegetable market 76 0.97 Completed at Tufanganj Ranirhat under Cooch Behar Zilla RMC. Renovation of stall for Sufal Own Fund Bangla stall outlet at Chowrahat, 77 4.79 Completed Dinhata under Cooch Behar Zilla RMC. Renovation of existing room for Own Fund proposed stall at Ist floor of at 78 4.81 Completed Chowrahat, Dinhata under Cooch Behar Zilla RMC. Const. of conc. Drain with slab at Own Fund 79 Rampur market under Cooch 4.36 Completed Behar Zilla RMC. Repairing and renovation of Own Fund outside wall of existing building 80 (ground floor and Ist floor) at 3.39 Completed Chowrahat(W), Dinhata under Cooch Behar Zilla RMC. Earth work in filling in the Cattle Own Fund market at Premchanderhat 81 4.58 Completed within Mathabhanga-I block under Cooch Behar Zilla RMC. Electrical scheme for decorative Own Fund street light arrangement on the 82 3.40 Completed Southern side of Baneswa hat under Cooch Behar Zilla RMC. Electrical scheme for decorative Own Fund street light arrangement on the 83 2.87 Completed West side of Baneswa hat under Cooch Behar Zilla RMC. Construction of Toilet complex, Own Fund drain with slab at Ghoksadanga 84 20.79 Ongoing market under Cooch Behar Zilla RMC. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us