MOM Karnal HSPCB

MOM Karnal HSPCB

FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT& ENVIRONMENTAL MANAGEMENT PLAN For Construction of New Four/Six-lane National Highway (NH-152D) from Gangheri, district Kurukshetra to Narnaul, district Mahendergarh in the state of Haryana Project Proponent: NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport &Highways, Government of India) Project Consultant SA Infrastructure Consultant Private Limited Environmental Consultant: ENVIRO INFRA SOLUTIONS PVT.LTD. (QCI Certificate No. NABET/EIA/1619/ IA 0018) January 2019 Final EIA/EMP Report for Construction of New Four Lane national Highway (NH-152D) from Gangheri, District - Kurukshetra to Narnaul, District - Mahendergarh in the state of Haryana (Length = 230 km) NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) Table of Contents Section No. Contents Page No. EXECUTIVE SUMMARY i to xi CHAPTER-1: INTRODUCTION 1.1 Project Background 1-1 1.2 Identification of Project and Project Proponent 1-1 1.3 Brief Description of the Project and its Importance to the Country 1-1 1.3.1 Salient features of the project 1-2 1.4 Scope of the EIA/EMP Study (As per TOR) 1-5 1.5 Objectives of the Consultancy Services 1-5 1.6 Policies, Legal and Administrative Framework 1-6 1.7 Structure of the Report 1-10 1.8 TOR approved by MoEF&CC and its Compliance 1-11 CHAPTER-2: PROJECT DESCRIPTION 2.1 Introduction 2-1 2.2 Description of the Project & Brief about the Project 2-1 2.2.1 Need of the Project 2-1 2.2.2 Proposed Pavement & Overlay 2-1 2.2.3 Traffic Control, Road Marking, Traffic Signs and Safety 2-1 Measures 2.2.4 Proposal for Truck Lay byes/Parking cum Rest Area 2-2 2.2.5 Toll Plazas and Weighing Stations 2-2 2.2.6 Standards and Specifications Adopted 2-2 2.2.7 Geometric Design Standards for 4-lane Highway 2-3 2.3 Land Requirement for the proposed project 2-3 2.4 Water Requirement for the proposed project 2-4 2.5 Traffic Survey and Analysis 2-4 2.5.1 Introduction 2-4 2.5.2 Traffic Surveys 2-4 2.5.3 Analysis of Traffic Surveys 2-5 2.6 Traffic Management Plan 2-5 2.7 Details of the Structures proposed along the Proposed Alignment 2-6 2.7.1 Details of the proposed bridges 2-6 ENVIRO INFRA SOLUTIONS PVT. LTD. Page 1 Final EIA/EMP Report for Construction of New Four Lane national Highway (NH-152D) from Gangheri, District - Kurukshetra to Narnaul, District - Mahendergarh in the state of Haryana (Length = 230 km) NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 2.7.2 Details of the proposed major/minor Junctions 2-8 2.7.3 Details of the proposed ROBs 2-8 2.7.4 Details of proposed Interchanges 2-8 2.7.5 Details of proposed flyovers 2-9 2.7.6 Details of vehicular, light and pedestrian underpasses 2-10 2.7.7 Details of the Proposed Box Culverts 2-18 2.7.8 Details of the proposed Toll Plazas 2-22 2.8 Details of affected religious structures 2-23 2.9 Cost Estimates 2-23 CHAPTER - 3: ANALYSIS OF ALTERNATIVES 3.1 Selection of Alternative 3-1 3.2 With and Without Project Scenario 3-18 CHAPTER-4: DESCRIPTION OF ENVIRONMENT 4.1 Preparation of Questionnaires for Environmental Parameters 4-1 4.1.1 Field Observation on Questionnaire 4-1 4.1.2 Screening, Testing & Monitoring of Physical Environmental 4-1 Factors 4.1.2.1 Ambient Air Quality 4-2 4.1.2.1.1 Instrument Used for Sampling 4-2 4.1.2.1.2 Techniques for Ambient Air Quality Monitoring 4-3 4.1.2.2 Water Quality 4-3 4.1.2.3 Soil Quality 4-3 4.1.2.3.1 Sampling Frequency and Analysis Methodology 4-3 4.1.2.4 Noise Level 4-4 4.1.2.4.1 Noise Standards 4-5 4.1.3 Secondary Available Data 4-5 4.2 Analyses, Compilation And Preparation of Report 4-5 4.3 Baseline Environmental Conditions 4-6 4.3.1 Physical/Natural Environment 4-6 4.3.2 Geographical Location of the project expressway 4-6 4.3.3 Land Use and Terrain 4-6 4.3.3.1 Land Use within 500 m buffer 4-7 4.3.4 Climate and Micro-Meteorological Parameters 4-25 ENVIRO INFRA SOLUTIONS PVT. LTD. Page 2 Final EIA/EMP Report for Construction of New Four Lane national Highway (NH-152D) from Gangheri, District - Kurukshetra to Narnaul, District - Mahendergarh in the state of Haryana (Length = 230 km) NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 4.3.5 Natural Hazards and Vulnerability of the sub project area 4-31 4.3.5.1 Seismic profile of the area 4-31 4.4 Geology of the study area 4-33 4.4.1 Field study and Sampling locations 4-34 4.4.1.1 Soil Quality along the study area 4-35 4.5 Air Environment 4-37 4.5.1 Ambient Air monitoring locations 4-37 4.5.2 Analysis of Ambient Air Quality along the study area 4-38 4.6 Noise Environment 4-42 4.6.1 Noise Monitoring locations 4-42 4.6.2 Analysis of Noise monitoring along the study area 4-43 4.7 Water Environment 4-44 4.7.1 Streams/Canals/Nalas and Bridges Crossings the proposed 4-44 alignment 4.7.2 Water bodies crossing the proposed project 4-46 4.7.3 GeoHydrology for the study area 4-46 4.7.4 Rivers of Haryana 4-47 4.7.5 Hydrometeorology 4-47 4.7.6 Hydrogeological Setup 4-47 4.7.7 Water Quality of the study area 4-50 4.7.7.1 Water Sampling Locations 4-50 4.7.7.2 Ground Water Quality along the Study Area 4-51 4.7.7.3 Surface Water Quality along the study area 4-54 4.8 Biological environment 4-55 4.8.1 Methodology for the study 4-56 4.8.2 Forest Types in the Project Area 4-56 4.8.3 Taxonomic Diversity: Flora 4-56 4.8.3.1 Economically-Important Plant Species 4-57 4.8.4 Taxonomic Diversity: Fauna 4-57 4.8.4.1 Aquatic Ecology 4-58 4.8.4.1.1 Fish Diversity 4-58 4.8.5 Tree cutting 4-59 4.9 National Park/Wildlife Sanctuary/Eco Sensitive Zone 4-59 ENVIRO INFRA SOLUTIONS PVT. LTD. Page 3 Final EIA/EMP Report for Construction of New Four Lane national Highway (NH-152D) from Gangheri, District - Kurukshetra to Narnaul, District - Mahendergarh in the state of Haryana (Length = 230 km) NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 4.9.1 Brief about Chhilchila Lake Wildlife Sanctuary 4-60 4.10 Socio-Economic profile of the project areas 4-61 4.10.1 Introduction 4-61 4.10.2 Project Influence Districts 4-61 4.10.3 Demographic and Socio Economic Characteristics 4-64 4.10.3.1 Population 4-64 4.10.3.2 Socio-economic characteristics of the population area 4-65 4.10.3.3 Population Growth and Urbanization 4-65 4.10.4 State’s Economy 4-65 4.10.5 Agriculture and Allied Activities 4-68 4.10.6 Industry 4-69 CHAPTER-5: ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES 5.1 Introduction 5-1 5.2 Potential Impacts on Soil 5-1 5.2.1 Loss of Productive Soil 5-1 5.2.2 Erosion 5-1 5.2.3 Contamination of Soil 5-2 5.3 Impacts on Water Resources 5-2 5.3.1 Modification of the Surface Water Flow 5-3 5.3.2 Modification of the Groundwater Flow 5-3 5.3.3 Rainwater Harvesting 5-3 5.3.4 Use of Local Water Supply 5-4 5.3.5 Water Quality Degradation 5-4 5.4 Impact on Ambient Air Quality 5-4 5.4.1 Impacts During Construction Phase 5-5 5.4.1.1 Use of Fly Ash 5-5 5.4.1.2 Quarry for GSB, Boulder, Aggregates, Sand 5-5 5.4.2 Impacts During Operation Phase 5-7 5.4.2.1 Prediction of Impact on Ambient Air Quality 5-7 5.5 Impact On Noise Levels 5-12 5.5.1 Prediction of Noise Impact on Noise Level 5-13 5.5.1.1 Outcome of the Noise level Modelling: 5-13 ENVIRO INFRA SOLUTIONS PVT. LTD. Page 4 Final EIA/EMP Report for Construction of New Four Lane national Highway (NH-152D) from Gangheri, District - Kurukshetra to Narnaul, District - Mahendergarh in the state of Haryana (Length = 230 km) NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 5.5.2 Mitigation measures to reduce Noise levels 5-16 5.6 Impact on Flora, Fauna and Ecosystem 5-17 5.6.1 Removal of trees 5-17 5.6.2 Removal of Herbal Cover 5-17 5.6.3 Conservation and Mitigation Measures 5-18 5.6.3.1 Integrated Eco-friendly designs 5-20 5.6.3.2 Impact of Noise, Light and Power lines on Wild animals 5-22 5.7 Impact on Protected Monuments and Cultural Heritage Sites 5-22 5.8 Impacts on Social Environment 5-22 5.9 Impacts on Road Safety and Public Health 5-23 5.10 Mitigation Measures 5-23 5.10.1 Soil 5-23 5.10.2 Water Resources 5-24 5.10.3 Ambient Air Quality 5-24 5.10.4 Noise Levels 5-25 5.10.5 Human Health and Safety 5-25 5.10.6 Measures Taken For Pedestrian Safety 5-26 5.11 Biological Characteristics 5-26 5.12 Summary of Environmental Impact Assessment 5-28 CHAPTER-6: ENVIRONMENTAL MONITORING PROGRAMME 6.1 Environment Monitoring Programme 6-1 6.2 Environmental Monitoring Cost 6-3 CHAPTER-7: ADDITIONAL STUDIES 7.1 Introduction 7-1 7.2 Public Consultation 7-1 7.2.1 Introduction 7-1 7.2.2 Methodology Followed For Public Consultation 7-1 7.2.3 Public Consultation Process 7-2 7.2.4 Key Issues 7-3 7.2.5 Consultations during Design 7-3 7.2.6 Consultation Sessions 7-3 7.2.7 Continued Consultation 7-7 7.3 Public hearing 7-9 ENVIRO INFRA SOLUTIONS PVT.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    278 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us