Slide Presentation

Slide Presentation

SFMTA Battery Electric Bus Pilot Program SFMTA Board Meeting November 5, 2019 Zero Emission Vehicles Resolution • SFMTA currently operates greenest fleet in North America • SFMTA is national leader in pursuing sustainable, reduced, and zero emissions transit vehicles • California Air Resources Board (CARB) has set ambitious requirements for electric-bus adoption in California • SFMTA Board of Directors Zero Emissions Vehicle Resolution (2018) guides all aspects of our battery-electric vehicle program: − 2020: Pilot electric buses − 2025: 100% electric procurements − 2035: all electric fleet 2 Zero Emission Timeline Battery 100% Start/ Electric Zero Stop Bus Emission 2007 Feature 2019 Pilot 2025 Fleet Orion 2016 Entirely 2020 Purchase 2035 Hybrids Hybrid/ Battery Trolley Electric Fleet Buses Only Green Zone 3 Battery-Electric Bus Pilot Overview • Procure nine 40-ft battery-electric buses – three each from three different manufacturers to determine the current state of battery electric technology • Use vehicles in regular revenue service on SFMTA’s most demanding routes • Install charging infrastructure at the Woods Maintenance yard • Prepare a report analyzing the electric buses and comparing them to our existing hybrid electric and electric trolley buses. 4 Goals for Pilot • Compare battery buses to one another, as well as to our existing electric hybrid buses and trolley buses • Evaluate performance, reliability, maintainability, and operability of the buses in SF unique operating environment • Understand the best current technology on the market; battery technology used in electric vehicles is rapidly evolving • Evaluate manufacturer’s ability to deliver on safety and reliability for the “full bus,” not just the battery components • Evaluate new features that respond to customer and employee feedback such as new seats, CAD/AVL systems, a Passenger Information System, doors, wheelchair ramps, and security systems 5 Battery Electric Bus Contract Prices Contract Number Not to Exceed Firm Name SFMTA-2019-02 $4,452,536 New Flyer SFMTA-2020-18 $3,509,150 BYD SFMTA-2020-19 $5,262,602 Proterra Each base contract includes three 40-foot, low floor, battery-electric buses, as well as licenses for the ViriCiti vehicle telematics system, operator and maintenance training packages, spare parts, special tools, and all required operating, maintenance, and parts manuals 6 Reasons for Price Variation The contract prices vary due to several factors: • Base Bus prices vary due to different battery sizes and different vehicle configurations (chassis, suspension, overall bus, etc) • Proterra and BYD can provide a dual drive motor at this time, which will perform better on the hills • Except New Flyer, no prior relationships with SFMTA’s preferred suppliers leading to significant first-time integration costs: − CAD/AVL Systems − Automatic Passenger Counter System − Transit Signal Priority System − Video Surveillance System − Passenger Information System • BYD pricing reflects interest in establishing strong market presence 7 8 Alternatives Evaluated based on SFMTA Board Feedback 1. Reduce the number of recommended vendors 2. Reduce scope for New Flyer or Proterra 3. Request voluntary price reductions and/or contract restructuring that would not impact performance 4. Approve full program as presented on October 15 9 Recommendation Staff recommends Option 4, approve as presented on October 15 • Reducing vendors could have long-term cost implications by reducing competition by limiting the number of manufacturers familiar with SFMTA operating environment and equipment needs • Reducing scope would prevent us from understanding the state- of-the art technology and may lead to over-designing in future procurements and would also have schedule impacts • Changing price elements introduce new risks (e.g., shifting battery risk to SFMTA) and would also have schedule impacts • Adopting the pilot as is will help the SFMTA make progress towards its commitment to CARB to begin procuring battery electric buses only in 2025 10.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us