Los Angeles County Metropolitan Transportation Authority

Los Angeles County Metropolitan Transportation Authority

Los Angeles County Metropolitan Transportation Authority Los Angeles Regional Investors Conference, February 26-27, 2014 Nalini Ahuja‐Executive Director, Finance and Budget Donna R. Mills –Treasurer At a Glance Metro Operates the 3rd Largest Transportation System in the U.S. • Completely clean-air fleet of over 2,200 Compressed Natural Gas buses • 87 miles of Metro Rail – 83 stations • Approximately 1.1 million bus and 360,000 rail passengers each weekday • Metro Rapid Bus • 535 HOV lane miles • Service area of 1,433 square miles 1 At a Glance The Extensive Bus System • Service in L.A. County as well as portions of Orange and Ventura Counties • Second largest bus system in the U.S. • Nearly 360 million boardings in FY13 • Twenty-five Metro Rapid corridors – Over 400 miles of express routes throughout the County – Buses have traffic signal priority and fewer stops to speed transit • The Metro Orange Line – 18-mile Bus Rapid Transit service that operates along an exclusive right-of way – Transports thousands of commuters between Warner Center in the west San Fernando Valley and the Chatsworth Amtrak/Metrolink Station to the North and the Metro Red Line subway station in North Hollywood • The Metro Silver Line – Express Bus service stretching over 26 miles from El Monte Station to Harbor Gateway Transit Center 2 At a Glance The Rail System Currently Consists of Six Rail Lines • Four light rail lines – Blue, Green, Gold, and Exposition serving 67 stations along 70.3 miles of track. • Two subway lines – Red and Purple, serving 16 stations along 17.4 miles of track. • Projects under construction – Expo 2 to Santa Monica – Gold Line Foothill Extension – Crenshaw/LAX Transit Corridor – Regional Connector – Westside Subway Extension Phase One 3 At a Glance The Rail System Currently Consists of Six Rail Lines 4 At a Glance Other Major Transportation Projects Across the County • Highway System Improvements – Freeway construction improvements- interchanges, widening and sound walls. – High Occupancy Vehicle (HOV) lane program, in cooperation with Caltrans, funded through a combination of federal, State and local resources. – Metro ExpressLanes, a pilot program on I-10 and I-110 overseen by Metro, Caltrans and several other mobility partners to convert HOV lanes to High Occupancy Toll (HOT) lanes. – Accelerated Regional Transportation Improvements (ARTI) P3 Project. • Metrolink Commuter Rail Line Fund Assistance – Funding partner with four other participating counties – Seven lines, totaling 512 miles and 55 stations. – Service to Riverside, Ventura, Orange, San Bernardino and San Diego counties. • Other Metro Funded Projects – Freeway service patrols – Over 100 local return and non-profit agencies providing community based transportation. 5 At a Glance Metro’s Public Support Proposition A • ½ cent sales tax approved by voters in November 1980 with no sunset • Since inception, Proposition A has provided more than $14.4 billion for transportation funding1 Proposition C • ½ cent sales tax approved by voters in November 1990 with no sunset • Since inception, Proposition C has provided more than $11.7 billion for transportation funding1 Measure R • ½ cent sales tax approved by voters in November 2008 with 2/3 majority • 30-year sales tax expiring in 2039 • Commits a projected $34.5 billion to traffic relief and transportation upgrades 1Through FY2013 –Sales tax revenues less administrative fees paid to the State Board of Equalization 6 At a Glance Proposition A Sales Tax Revenues $800.0 $700.0 $600.0 $500.0 $400.0 $300.0 $200.0 $100.0 $‐ 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 *Proposition C and Measure R Revenues are historically similar to Proposition A Revenues 7 LOOKING FORWARD Long Range Planning 2009 Long Range Transportation Plan May 2013 Update Summary of Sources Measure R $ 34.6 B 14.3% Federal $ 34.5 B Local 14.3% $ 135.1 B 55.9% State $ 37.3 B 15.5% $241.5 Billion Total FY 2013 – FY 2040 9 Measure R 2008 Voters Approved Allocation of Measure R Revenues • Half-cent tax on all taxable sales throughout Los Angeles Rail Operations Metro Rail Capital County 5% 2% Local Return • Taxes are allocated to be spent on specific project needs 15% Rail and/or Bus and operational purposes as set forth on the right Metrolink Capital 3% 35% • Bondholders benefit from a pledge of 85% of all Sales Tax Collections Bus Operations 20% Highway Capital 20% 10 Measure R Ten Largest Transit and Highway Projects Estimated Cost Opening Project (in $Millions) Year Exposition Blvd. LRT Phase II $1,511 FY 2017 Gold Line Foothill LRT Extension 786 FY 2017 Crenshaw/LAX Transit Corridor 2,058 FY 2020 Regional Connector 1,399 FY 2021 Westside Subway Extension – Segment 1 2,861 FY 2023 Largest Transit Projects Subtotal $8,615 I-405 North Carpool Lanes from I-10 to US-101 $1,149 FY 2014 I-5 North Carpool Lanes from State Route 170 to State Route 134 608 FY 2016 I-5 South from Orange County Line to I-605 (includes Carmenita Interchange) 1,894 FY 2017 I-10 Carpool Lanes from I-605 to State Route 57 578 FY 2018 Alameda Corridor East 1,446 FY 2012+ Largest Highway Projects Subtotal $5,675 GRAND TOTAL $14,290 (As of May 2013) 11 Measure R Transit Capital Plan 12 Measure R Highway Plans 13 Long Range Planning Metro Continues to Issue and Seek New Funding • New capital projects will be funded through Measure R subject to the Long Range Transportation Plan • Metro continues to seek alternative funding sources for various projects – Secured a $545.9 million TIFIA loan for the Crenshaw/LAX transit corridor – In final negotiations for $160 million TIFIA loan for Regional Connector project plus FFGA – Application in progress for $856 million Phase One of Westside Subway Extension • Metro issued $320 million of Proposition C new money bonds in calendar 2013, for two to three years of capital funding for highways. 14 CREDIT AND DEBT CHARACTERISTICS Metro Credit Debt Policy Guides Future Debt Issuance Measure R Debt Affordability Targets and Policy Limits Category Allowable Uses & Status Debt Policy Maximum 87% of MR Transit Capital – Transit Capital 35% – New Rail New Rail and/or Bus Rapid Transit. Initial issuance occurred in New Rail and/ or Bus Rapid CY2010. and/or Bus Rapid Transit Transit revenues. Transit Capital 3% – Metrolink Capital Operations, Maintenance and Expansion for system improvements, 87% of MR Transit Capital – Improvement Projects Within LA rail yards and rail cars. Currently no debt service. Issuance likely in Metrolink Capital County the future. Improvements in LA County. Transit Capital 2% – Metro Rail System improvements, rail yards and rail cars. Initial issuance 87% of MR Transit Capital – Capital 87% of MR Transit Capital occurred in CY2010. Metro Rail Capital Carpool lanes, highways, goods movement, grade separations and Highway Capital 20% – 60% of MR Highway Capital soundwalls. Currently no debt service. Issuance likely in the future. Rail operations for new transit project operations and maintenance. Operations 5% – Rail Operations No debt issuance. Currently no debt service. No debt issuance permitted. Bus operations for countywide bus service and maintenance. Operations 20% – Bus Operations No debt issuance. Currently no debt service. No debt issuance permitted. Major street resurfacing, rehabilitation and reconstruction; pothole repair; left turn signals; bikeways, pedestrian improvements; Local Return 15% – N/A streetscapes; signal synchronization; and transit. Distributed to localities based on population. 16 Metro Credit Sales Tax Bonds – Security Features Prop A Prop C Measure R Payments secured by Payments secured by Payments secured by Trust Structure Trust Agreement/ Trust Agreement/ Trust Agreement/ Trustee intercept Trustee intercept Trustee intercept ½ cent sales tax ½ cent sales tax ½ cent sales tax approved 1980 (no approved 1990 (no approved 2008 (30 sunset) sunset) year sunset) Funding Source Approx. 75% (excludes Approx. 80% (excludes Approx. 85% (excludes 25% Local Jurisdiction 20% Local Jurisdiction 15% Local Jurisdiction and administrative and administrative and administrative fees) fees) fees) • First Tier Senior • Senior Bonds • Senior Bonds Bonds • Subordinate Bonds, • Subordinate Flow of Funds • Subordinate Bonds, Notes or Other Bonds, Notes or Notes or Other Obligations Other Obligations Obligations • TIFIA Loans 17 Metro Credit Outstanding Debt and Ratings Credit Outstanding Par Rating (Moody’s/S&P/Fitch) Prop A – 1st Tier Senior Bonds $1,249,900,000 Aa2/AAA/NR Prop A – 2nd Tier Senior Bonds 20,520,000 Aa3/AA-/NR Prop C – Senior Bonds 1,316,285,000 Aa3/AA+/AA Measure R – Senior Bonds 701,935,000 Aa2/AAA/NR General Revenue Bonds 148,685,000 A1/A/NR Prop A Commercial Paper 119,020,000 P-1/A-1 (Sumitomo/Union LOCs) Prop C Commercial Paper 21,594,000 P-1/A-1 (State Street LOC) Prop C Revolving Credit Facility 45,000,000 NR Outstanding Debt $3,622,939,000 18 Metro Credit Proposition A Sales Tax Coverage History (in $Millions) Metro Maintains Net Sales Tax Allocation to Local Pledged Senior Lien Year Revenue Governments Revenues Coverage 2007 $686.2 (171.5) $514.6 3.60x Strong Coverage 2008 683.4 (170.8) 512.5 3.47x 2009 620.8 (155.2) 465.6 3.03x • Historically, Metro has maintained 2010 565.7 (141.4) 424.3 2.71x strong coverage on its long term debt 2011 601.9 (150.5) 451.4 3.00x 2012 648.7 (162.2) 486.5 3.04x supported by Proposition A and 2013 687.2 (171.8) 515.4 3.39x Proposition C Proposition C Sales Tax Coverage History (in $Millions) • A portion of the sales tax collected per Net Sales Tax Allocation to Local Pledged Senior Lien Year Revenue Governments Revenues Coverage proposition is used for local agencies, 2007 $686.3 (137.3) $549.0 5.86x the remainder is pledged to pay the 2008 683.5 (136.7) 546.8 5.31x 2009 620.9 (124.2) 496.7 4.22x Sales Tax Revenue bonds.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us