PROCUREMENT PLAN Date: July 21, 2011 (updated as of August 29, 2012) Armenia: ADDITIONAL FINANCING OF IRRIGATION REHABILITATION EMERGENCY PROJECT (IBRD Loan#8106-AM) a) CIVIL WORKS Review By Method of Bank Number of Actual Contract Price in Contractor/ Country of Invitation Expected Bid- Contract Completion # Description/ Location Start Date Contract ref # Public Disclosure Authorized Procurement (Prior/ Contracts Contract Currency registration Date Opening Date Signing Date Date Post) 1. WORKS FOR REHABILITATION OF PRIMARY AND ON-FARM IRRIGATION CANALS Rehabilitation of Mkhchyan Canal 1 DM35+20-DM74+43 and Dvin Canal NCB Prior 1 335,962,419 AMD Dorozhnik LLC (NKR) 23-Sep-11 24-Oct-11 16-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/001 DM7+69-DM38+08 Rehabilitation of Arzni Shamiram 2 Canal DM105+35-DM281+50 (I-st NCB Prior 1 798,178,056 AMD Sahakyanshin CJSC (RA) 23-Sep-11 24-Oct-11 15-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/002 stage canal) Rehabilitation of Arzni Shamiram 3 Canal DM179+60-DM447+91 (II-nd NCB Post 1 719,8134,00 AMD Khachhar LLC (RA) 24-Sep-11 25-Oct-11 15-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/003 stage canal) JV of Egvardshin OJSC- Rehabilitation of Arzni Canal Branch 4 NCB Post 1 1,179,723,760 AMD Dorozhnik LLC, 1-Oct-11 31-Oct-11 15-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/004 DM27+57-DM124+00 Public Disclosure Authorized (RA/NKR) Rehabilitation of Right Branch of Kasakh Canal DM9+14-DM41+42 and 5 NCB Post 1 440,000,007 AMD Agat-777 LLC (RA) 24-Sep-11 25-Oct-11 15-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/005 Left Branch of Kasakh Canal DM34+09- DM65+01 Rehabilitation of Lower Hrazdan Canals DM112+00-DM160+40 (I-st JV of Arpa Sevan OJSC - 6 stage), DM24+22-DM86+60 (II-nd NCB Post 1 869,999,425 AMD SHMSH-23 OJSC 29-Sep-11 27-Oct-11 15-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/006 stage) and Shah-Aru Canal DM30+74- (RA/RA) DM47+87 Rehabilitation of Shirak Main Canal DM13+40-DM24+04; Distributor 26 7 NCB Post 1 674,922,925 AMD Spitak-1 OJSC (RA) 24-Sep-11 25-Oct-11 15-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/007 Canal at DM91+64-DM169+84 and Public Disclosure Authorized Nalband Canal DM141+22-DM183+74 Rehabilitation of Right Branch of Talin Main Canal DM102+46-DM165+07 Bagramyanshin OJSC 8 NCB Post 1 410,435,050 AMD 29-Sep-11 27-Oct-11 15-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/NCB/CW-11/008 and Myasnikyan "Mayr Aru" Canal (RA) DM0+00-DM31+87 Public Disclosure Authorized Rehabilitation of Tertiary Irrigation Networks in Baghramyan, Miasnikyan, Dalarik, Karakert, Bagaran, Vanand, Ervandashat, JV of SADE JSC - Blesk 9 Lernagog Communities of Talin I/S, NCB Post 1 863,888,452 AMD LLC (France/ 14-Oct-11 11-Nov-11 21-Dec-11 20-Jan-12 30-Apr-13 IREP/AF/NCB/CW-11/009 Arevadasht, Hatsik, Noravan Russia) Communities in Armavir I/S and Aghavnatun Community under command of Lower-Hrazdan System. Rehabilitation of Tertiary Irrigation Networks in Jrashen Community of Nalband I/S, Verin Getashen, Martuni, 10 NCB Post 1 649,206,111 AMD Dorozhnik LLC (NKR) 14-Oct-11 11-Nov-11 16-Dec-11 20-Jan-12 30-Apr-13 IREP/AF/NCB/CW-11/010 Dzoragjugh, Astghadzor, Vaghashen Communities of Sevan I/S and Meghrashen Community of Shirak I/S. b) Consulting Services Review by Expected Adverti- Selection Bank Number of Actual Contract Price in Consultant / Country of Proposal Contract Completion # Description sement for Start Date Contract ref # Method Prior/ Contracts Contract Currency registration Submission Signing Date Date EOI Date Post Date 2. CONSULTANTS` SERVICES Technical & Quality Supervision over JV of CES-YSUAC 1 QCBS Prior 1 704,472 USD 27-Aug-11 29-Nov-11 21-Dec-11 25-Dec-11 30-Apr-13 IREP/AF/QCBS/SW-11/001 Rehabilitation of Primary Canals (Germany/RA) Technical & Quality Supervision over JV of CES-YSUAC 2 Rehabilitation of On-farm Irrigation QCBS Prior 1 191,904 USD 27-Aug-11 30-Nov-11 16-Jan-12 20-Jan-12 30-Apr-13 IREP/AF/QCBS/SW-11/002 (Germany/RA) Network Canals The Procurement procedures have already 15-Jun-12 5-Oct-12 15-Nov-12 20-Nov-12 20-May-13 3 Study of the Meghri Gravity Scheme QCBS Prior 1 IREP/AF/QCBS/SW-11/003 started Audit of WUAs and WSAs (for 4 calendar years 2011-2012) Audit of 44 WUAs and 3 WSAs (for Grant Thornton CJSC IREP/AF/LCS/SW- 4(a) LCS Prior 1 69,494,400 AMD 3-Nov-11 18-Jan-12 27-Mar-12 27-Mar-12 20-Jun-12 calendar year 2011) (RA) 11/001Aud Audit of 44 WUAs and 3 WSAs (for The Procurement procedures to be started 15-Oct-12 15-Dec-12 25-Jan-13 1-Feb-13 30-Jun-13 IREP/AF/LCS/SW- 4(b) LCS Prior 1 calendar year 2012) in October 2012 12/001Aud IREP/AF/LCS/SW- 5 Audit of the Project (2011-2013) LCS Post 1 9,235,200 AMD SOS-Audit Ltd (RA) 14-Mar-12 4-May-12 16-May-12 20-May-12 31-Aug-13 11/002Aud.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us