(To Be Published in the Gazette of India, Part-II, and Section 3, Sub

(To Be Published in the Gazette of India, Part-II, and Section 3, Sub

FORM –1 & 1 A “Proposed Residential cum Commercial Project” At Survey No 7/1, 7/2, 7/3, 7/4, 7/5, ,8/1/1/2 and 3/2 (p) off Nagar Road, Kalyani Nagar, Wadgaonsheri, Pune, Maharashtra By M/s. BrahmaCrop Pvt. Ltd. FORM –1 “Proposed Residential cum Commercial Project” At Survey No 7/1, 7/2, 7/3, 7/4, 7/5, ,8/1/1/2 and 3/2 (p) off Nagar Road, Kalyani Nagar, Wadgaonsheri, Pune, Maharashtra By M/s. BrahmaCrop Pvt. Ltd. APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the project Proposed residential cum commercial Project 2. S. No. in the schedule 8 (b) B1 3. Proposed capacity/area/length/tonnage Total Plot area : 1,77,900 m2 to be handled/command area/lease Built-up Area as per FSI: 4,62,057.75 m2 area/number of wells to be drilled Total Construction Built -up Area: 6,98,756.08 m2 Project Proposal: Completed & Under Construction as per earlier EC Bldg Name No. of Flats No. of Shops A1 72 -- A2 72 -- C1 36 -- C2 36 -- C3 36 -- CL1 72 -- CL2 72 -- D1 36 -- D2 36 -- D3 36 -- D4 36 -- D5 36 -- D6 36 -- E1 36 -- E2 36 -- E3 36 -- E4 36 -- E5 36 -- E6 36 -- E7 36 -- L1 54 -- L2 54 -- L3 54 -- A3 43 -- C4 86 -- C5 86 -- A4 22 -- C6 44 -- D7 22 -- CL3 44 -- Multi- -- purpose Hall 9 Bungalows 4 -- Sr. No. Item Details Tower 1 68 20 Tower 2 118 20 Tower 3 104 20 Tower 4 118 -- Tower 5 124 -- Tower 6 141 -- Tower 7 123 -- Tower 8 86 -- TOTAL 2268 60 Proposed Construction: for expansion & Amendment Bldg Name No. of Flats No. of Shops Wing A 250 Flats 14 Wing B 350 Flats Wing C 350 Flats 325 Flats Wing D Wing E 225 Flats 8 Wing F 250 Flats 16 Wing G 225 Flats 12 Wing H 275 Flats 28 Building A 64 Flats Building B 208 flats Total 2522 78 Shops Total proposal (Existing + Proposed): 4790 flats, 138 shops 4. New/Expansion/Modernization Expansion and amendment 5. Existing Capacity/ Area etc. Earlier EC vide letter No.- SEAC-2013/CR-444/TC.II dated 11.08.2016 Existing : Total BUA completed as per earlier EC= 386085.38 m2 6. Category of project i.e.’ A’ or ‘B’ A 7. Does it attract the general condition? If No yes, please specify. 8. Location Latitude 18°32'50.78"N Longitude 73°55'5.80"E Plot/Survey/Khasra No. Survey No 7/1, 7/2, 7/3, 7/4, 7/5, ,8/1/1/2 and 3/2 (p) off Nagar Road, Kalyani Nagar, Wadgaonsheri, Pune, Maharashtra Village Wadgaon Sheri Tehsil Haveli District Pune State Maharashtra 9. Nearest railway station Pune Railway Station: 4.9 km Nearest airport Pune Airport: 3.7 km 10. Nearest Town, city, Pune Municipal Corporation District headquarters Along with distance in kms. 11. Village Panchayats, Zilla Parishad, Pune Municipal Corporation Municipal Corporation, Local body Sr. No. Item Details (complete postal address with telephone nos. to be given) 12. Name of the applicant M/s. Bramha Corp Ltd. 13. Registered Address BramhaCorp. Ltd. Residency club, 3 Queens garden road, Camp, Pune. 14. Address for correspondence BramhaCorp Ltd. Residency club, 3 Queens garden road, Camp, Pune. Name Mrs. Anjali Bendarkar Designation (Owner/Partner/CEO) HOD – D&D Address BramhaCorp Infrastructures Pvt. Ltd. Residency club, 3 Queens garden road, Camp, Pune. Pin Code 411001 E-mail [email protected] Telephone No. 020-41423333 Fax No. 020-26353333 15. Details of Alternative Sites examined, if No any. Location of these sites should be shown on a topo-sheet. 16. Interlinked Projects Not applicable 17. Whether separate application of Not applicable interlinked project has been submitted? 18. If yes, date of submission Not applicable 19. If no, reason Not applicable 20. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. No (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 21. Whether there is any Government No Order/Policy relevant/ relating to the site? (a) The Forest (Conservation) Act, 1980? Not Applicable (b) The Wildlife (Protection) Act, 1972? Not Applicable (c) The C.R.Z Notification, 1991? Not Applicable 22. Whether there is any Government Not Applicable Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not Applicable 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II). Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Yes / Details thereof (with approximate quantities /rates, Information/Checklist confirmation No. No wherever possible) with source of information data 1.1 Permanent or temporary change in No Project site is in residential zone as per DP remarks. Sr. Yes / Details thereof (with approximate quantities /rates, Information/Checklist confirmation No. No wherever possible) with source of information data land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No 40 Nos. of existing buildings are constructed/ under vegetation and building? construction as per earlier EC. 1.3 Creation of new land uses? No Proposed Residential and commercial development in existing premises 1.4 Pre-construction investigation e.g. Yes Pre-construction investigation will be carried out as bore houses, soil testing? per relevant standards. 1.5 Construction works? Yes Name Flats Configuration A1 72 P+9 A2 72 P+9 C1 36 P+9 C2 36 P+9 C3 36 P+9 CL1 72 P+9 CL2 72 P+9 D1 36 P+9 D2 36 P+9 D3 36 P+9 D4 36 P+9 D5 36 P+9 D6 36 P+9 E1 36 P+9 E2 36 P+9 E3 36 P+9 E4 36 P+9 E5 36 P+9 E6 36 P+9 E7 36 P+9 L1 54 P+9 L2 54 P+9 L3 54 P+9 A3 43 P+11 C4 86 P+11 C5 86 P+11 A4 22 P+11 C6 44 P+11 D7 22 P+11 CL3 44 P+11 Multi- G+1 Purpose Hall 9 Bungalows 4 G+2 68 Flats, 20 B+G+P+S+18 - Tower 1 Shops 118 Flats, 20 B+G+P+S+18 - Tower 2 Shops 104 Flats, 20 B+G+P+S+18 - Tower 3 Shops Tower 4 118 Flats B+G+P+S+18 - Tower 5 124 Flats B+G+P+S+20 - Tower 6 141 Flats B+G+P+S+20 - Tower 7 123 Flats B+G+P+S+20 - Sr. Yes / Details thereof (with approximate quantities /rates, Information/Checklist confirmation No. No wherever possible) with source of information data Tower 8 86 Flats B+G+P+S+22- 250 Flats, 14 3B+S+2P+25 Wing A Shops Wing B 350 Flats 3B+S+2P+25 Wing C 350 Flats 3B+S+2P+25 Wing D 325 Flats 3B+S+2P+25 225 Flats, 8 3B+S+2P+25 Wing E Shops 250 Flats, 16 3B+S+2P+25 Wing F Shops Wing G 225 Flats, 12 Shops 3B+S+2P+25 Wing H 275 Flats 28 Shops 3B+S+2P+11 64 Flats S+ 8 Building A 208 Flats 3B+S+2P+26 Building B 4790 Flats, 138 Flats Shops 1.6 Demolition works? No - 1.7 Temporary sites used for Yes Sheds of Temporary labour camp for construction construction works or housing of workers on site with security construction workers? 1.8 Above ground building, structures or Yes Excavation in the form of rubble and soil. Part of this earthworks including linear soil and rubble will be used for back filling and structures, cut and fill or remaining material will be disposed by covered excavations. trucks to our proposed site. 1.9 Underground works including Yes Creation of Basements mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes During construction phase temporary storage materials? facilities will be created to store the construction raw material. 1.15 Facilities for treatment or disposal Yes Facilities will be provided for collection, treatment of solid waste or liquid effluents? and disposal for solid and liquid waste. STP for treatment of sewage Segregation of solid waste into non- biodegradable and biodegradable garbage Treatment of biodegradable waste in Organic Waste Converter Segregation of Non-biodegradable waste into recyclable & non-recyclable. Recyclable waste: To recyclers Non-Recyclable waste: To authorized vendors Dried sludge from STP : As manure 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail, or sea traffic during No -- construction or operation? Sr. Yes / Details thereof (with approximate quantities /rates, Information/Checklist confirmation No. No wherever possible) with source of information data 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission lines No -- or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to development and land surface affecting drainage or runoff after development there is some increment in run-off? runoff of storm water.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    50 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us