Tidal Water Resources

Tidal Water Resources

Feasibility Report MDDP Tidal Water Resources Medway Group Abigail Nelson; Agilesh Singaraj; James Robinson; Jessica Hyland; Stavros Kylakos; Thomas Pughe TIDAL WATER RESOURCES | TEAM MEDWAY Table of Contents List of Figures ........................................................................................................................................ 1 List of Tables .......................................................................................................................................... 1 Executive Summary ........................................................................................................................ 1 Introduction .................................................................................................................................... 1 Scope of Work ................................................................................................................................ 2 Project Context and Goals .............................................................................................................. 3 Summary of Existing Conditions ................................................................................................... 4 Three Underlying Questions ........................................................................................................... 9 Operational Feasibility ................................................................................................................. 10 Best Configuration ........................................................................................................................ 11 How does this compare with other suggested schemes? .............................................................. 13 Conclusions and Next Steps ..................................................................................................... 17 Location of Weir ....................................................................................................................... 19 Abstraction Point ...................................................................................................................... 23 Mass Balance Check ................................................................................................................. 30 Safety Considerations and Statutory Issues .............................................................................. 38 Design Procedure for Movable Weirs ...................................................................................... 42 Design of Weir ......................................................................................................................... 44 Column Calculations ................................................................................................................ 52 Foundation Bearing Capacity ................................................................................................... 60 Slab Design ............................................................................................................................... 69 River Modelling........................................................................................................................ 73 Environmental Impact Assessment .......................................................................................... 92 Hydro-installation ................................................................................................................... 113 Construction Phasing .............................................................................................................. 141 Financial Analysis .................................................................................................................. 147 CONTENTS II TIDAL WATER RESOURCES | TEAM MEDWAY Risk Assessment ..................................................................................................................... 153 References .............................................................................................................................. 159 Appendix A Finance ....................................................................................................................... 166 Appendix B River Modelling .......................................................................................................... 169 Appendix C General Scheme Arrangement at Allington Weir ....................................................... 171 Appendix D Guide to Calculations and Relationships for Hydro Unit ........................................... 172 Appendix E Turbine Locations ....................................................................................................... 175 Appendix F Salinity graphs ............................................................................................................ 180 CONTENTS III List of Figures Figure 2-1:Location of River Medway ................................................................................................... 1 Figure 5-1: Rainfall Depths in England and Wales for the past 12 months (Environment Agency, 2014). ................................................................................................................................................................ 4 Figure 5-2: River discharge data and predictions for the future (Cloke, et al., 2010). ........................... 5 Figure 5-3 National Water Resource Availability (Environment Agency, 2000). ................................. 6 Figure 5-4 Current scheme in place at the River Medway (Beckett, 2014) ........................................... 7 Figure 5-5 The back pumping scheme that is currently at place for the Medway (Beckett, 2014) ........ 8 Figure 8-1 Downstream of Allington lock at low tide, the area is unnavigable ................................... 12 Figure 11-1: Proposed locations of weirs ............................................................................................. 19 Figure 11-2: Water levels at various locations along the River Medway for MHWS and MHWN ..... 20 Figure 11-3: Location of weir with lock ............................................................................................... 21 Figure 11-4: Revised location of weir with lock .................................................................................. 21 Figure 11-5: Proposed location of weir without lock ........................................................................... 22 Figure 12-1 - Medway River with Locations ....................................................................................... 23 Figure 12-2 - River Medway system diagram ...................................................................................... 24 Figure 12-3: Map showing the current abstraction point, water treatment works and new potential abstraction point. .................................................................................................................................. 25 Figure 12-4: Map showing Allington weir and position of Burham Water Treatment works ............. 26 Figure 12-5: Extract from South East Water planning drawing for new freshwater pipeline in Burham .............................................................................................................................................................. 27 Figure 13-1 River Medway Schematic for Mass Balance .................................................................... 31 Figure 13-2: Flow for a year for the River Medway at Teston and East Farleigh combined (Taken from Environment Agency, 2014) ................................................................................................................ 32 Figure 13-3: Flow for a year for the River Tesie at Stongbridge (Taken from Environment Agency, 2014) ..................................................................................................................................................... 33 Figure 13-4: Flow for a year for the River Beult at Stiebridge (Taken from Centre for Ecology & hydrology, 2013) .................................................................................................................................. 33 Figure 13-5: Flow for a year for the River Medway at Chafford (Taken from Centre for Ecology & Hydrology, 2013) ................................................................................................................................. 34 Figure 13-6: First Mass balance principle used .................................................................................... 34 Figure 13-7: Second Mass balance principle used ............................................................................... 35 Figure 15-1 Schematic of weir ............................................................................................................. 43 TIDAL WATER RESOURCES | TEAM MEDWAY Figure 16-1 Structural members of the radial gate (Erbisti, 2014) ....................................................... 45 Figure 16-2 Rear view of radial gate showing girder arrangement ...................................................... 46 Figure 16-3 Typical Arrangements of girders ...................................................................................... 46 Figure 16-4 Segment gate with 2 pairs of arms showing geometry ..................................................... 47 Figure 16-5 Loading on the vertical beams .........................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    192 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us