Information note from the General Secretariat on the Council’s buildings programme (27 February 2003) Caption: On 27 February 2003, the General Secretariat of the Council of the European Union proposes to the Committee of Permanent Representatives (Coreper II) that the Council’s buildings programme be updated with a view to future enlargements. This information note sets out the required conversion work on existing buildings as well as possible construction projects required to meet the requirements connected with the forthcoming enlargements. Source: Note d'information du Secrétariat général du Conseil au Comité des Représentants Permanents (2ème partie). Objet: Programmation immobilière dans la perspective des prochains élargissements, 6864/03, IMM 1. Bruxelles: Conseil de l'Union européenne, 27.02.2003. 13 p. http://register.consilium.europa.eu/pdf/fr/03/st06/st06864fr03.pdf. Copyright: (c) Translation CVCE.EU by UNI.LU All rights of reproduction, of public communication, of adaptation, of distribution or of dissemination via Internet, internal network or any other means are strictly reserved in all countries. Consult the legal notice and the terms and conditions of use regarding this site. URL: http://www.cvce.eu/obj/information_note_from_the_general_secretariat_on_the_co uncil_s_buildings_programme_27_february_2003-en-eedaed44-70ca-4e27-b801- 1f7bc5bf2472.html Last updated: 05/07/2016 1/8 Information note from the General Secretariat of the Council to the Committee of Permanent Representatives (Part II) on the property programme (Brussels, 27 February 2003) I. Introduction With future enlargements in mind, the Committee of Permanent Representatives took some policy decisions in 2001 and 2002 on the Council’s property programme on the basis of figures drawn up by the General Secretariat. Given the developments which have taken place since then, the General Secretariat of the Council hereby notifies the latest information on this issue and proposes to update the programme. II. Brussels 1. Current situation and future requirements At present, the Council uses a total surface area (superstructure) (1) of 165 090 m2, broken down as follows: • owned: — Justus Lipsius Building, Conference Wing: 55 680 m2 — Justus Lipsius Building, Secretariat Wing: 82 280 m2 • rented: — Frère-Orban Building: 11 100 m2 — Kortenberg 150 Building: 9 020 m2 — Kortenberg 158 Building: 6 250 m2 — Froissait Building (2nd floor): 760 m 2 165 090 m2 The current premises are all fully occupied, with the result that no spare space is available to meet current needs and certainly not to absorb the envisaged increase in activities and staff numbers. With future accessions in mind, the General Secretariat, in conjunction with the Antici Group, has already evaluated conference room and office requirements and the timescale involved. (2) As a result of these studies, the Committee of Permanent Representatives felt that the Justus Lipsius Building should continue to be the Council’s main building and therefore agreed to a programme of alterations to this building, largely concerning conference rooms and press areas. (3) It was also noted that, should 10 new Member States accede, a total surface area (superstructure) of 65 000 m2 would be needed to meet estimated office requirements; if the Frère-Orban and Kortenberg buildings were relinquished, this figure would increase to approximately 90 000 m2. As a result, the General Secretariat of the Council has already been authorised to proceed with the rental of the 2003 section of the additional office buildings scheduled for 2003 and 2004. (4) 2. Alterations to the Justus Lipsius Building The following programme of works is under way or planned so as to enable the Justus Lipsius Building to meet the requirements of future enlargements and to enable European Council meetings to be held there: 2/8 (a) The fitting out of two, or even three or four, conference rooms with 22/25 interpreters’ booths. This programme includes: • fitting out of Room 35.4 (2 x 75 places for the delegations and 22 interpreters’ booths); these works were started in 2002, and the room will be available from 1 July 2003; • enlargement of Room 50.1 (2 x 92 places for the delegations and 25 interpreters’ booths); provided that the building authorisation is issued in time, conversion works will start in July 2003 so that the new room is available from 1 May 2004; • changes to the interpretation equipment in Rooms 50.6/50.7 so that, when joined together, interpretation in 22 languages may be provided in this room; these alterations could be started in June 2004 so that the two rooms are operational again in September 2004; • possibly, the development of a room identical to Room 35.4 (2 x 75 places for the delegations and 22 or even 24 interpreters’ booths) in the spare area on level 20; where appropriate, these works could be scheduled for 2005. (b) Building of an additional level at SG.70. It is planned to accommodate 10/13 new delegations on this level in more or less identical conditions to those enjoyed by the current delegations. This additional level will take approximately 18 months to build. Given that the building authorisation has yet to be issued for these works, temporary accommodation will have to be found for the new delegations in another part of the Justus Lipsius Building. (c) Extension of the Press Centre The Press Centre will have to be extended to take account of enlargement and the fact that European Council meetings are to be held in the Justus Lipsius Building. (5) These works include: • extending the Press Centre’s working areas, briefing rooms and radio/TV cabins by taking over the parking areas in CO.01/02; although these works were more or less completed in 2002, some additional work still remains to be carried out at these levels (addition of cabins, sliding partitions in some briefing rooms, TV studio); • roofing over of the main entrance courtyard and relocation of the access control point; provided that the building authorisations are obtained, these works are scheduled for 2003, 2004 and 2005; these new structures should make it possible both to improve the Justus Lipsius Building and to provide a multipurpose area which could be used as a press working area during European Council meetings. (6) Delays in obtaining the building authorisations for these conversion works are, however, holding up building work, in particular: • as of now, the construction of the new floor for the new delegations at level 70 and the relocation of the access control point at the main entrance, • in the near future, the extension of conference room 50.1 and the roofing over of the main entrance courtyard. Problems with these permits therefore need to be resolved so that they can be issued as soon as possible. 3. Additional buildings The total surface area (superstructure) which the Council will need to cope with the forthcoming accessions is approximately 90 000 m2, assuming that the peripheral buildings are vacated. (7) 3/8 These requirements are to be met by using: • the LEX Building, • the Résidence Palace Building. (a) LEX Building The General Secretariat undertook a survey of the property market in Brussels in July 2001 with a view to purchasing or leasing a building designed to meet its requirements. (8) Following this survey, negotiations started with the developers of the LEX Building (rue de la Loi 145) with a view to purchasing this building. This building, which has a total surface area (superstructure) of 58 000 m2, will include: • enough space for the fitting out of seven conference rooms (2 x 70 places for the delegations, 30 interpreters’ booths): (9) 9 600 m2 • offices for General Secretariat departments: 39 200 m2 • a restaurant and kitchen area: 4 000 m2 • a multipurpose area on the ground and first floors: 2 600 m2 • basement technical areas: 3 200 m2 Negotiations with the developer have been more or less completed to the General Secretariat’s satisfaction, especially as regards quality, timescale, cost and financing issues. Provided that the documents can be satisfactorily finalised, the contract will be signed in mid-March. Barring the unforeseen, the LEX Building could therefore be ready for occupation by the Council by late 2006. Payment for the purchase of this building will take the form of instalments during the construction period and a 27-year mortgage facility after the building has been delivered. (b) Résidence Palace Building On 21 October 2002, Belgian Government representatives submitted a technical file on the possible transfer of Block A of the Résidence Palace Building (rue de la Loi 155) to the Council. This file describes the current state of the building and some works already planned. The file includes: • the plans and technical specifications of the existing building, • town-planning possibilities and constraints, • planned works (railway), • the various easements on the property (in particular, the railway and links with the other Résidence Palace blocks). According to the file, a building with a total surface area (superstructure) of some 35 000 to 45 000 m2 could be provided (by renovation, demolition and rebuilding and/or by new building). Following a study of this technical file by the staff of the General Secretariat, discussions are under way with Belgian Government representatives with a view to clarifying: 4/8 • town-planning issues (possibility of obtaining authorisations, transfer of any obligation to build replacement housing, listing of some historic parts of the building, consequences of certain easements); • security issues (underground station and railway, rights of way); • the issue of the future use of the building (seat of the European Council and/or of the Council, Coreper, Press Centre, offices); • building timescale and procedures; • cost issues and financing methods. The General Secretariat plans to submit this file to the Committee of Permanent Representatives as soon as it has been able to clarify the various issues listed above with the competent Belgian authorities.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages8 Page
-
File Size-