Wastewater Master Plan Report for Lamu Island

Wastewater Master Plan Report for Lamu Island

REPUBLIC OF KENYA COAST WATER SERVICES BOARD WATER AND SANITATION SERVICE IMPROVEMENT PROJECT – ADDITIONAL FINANCING (WaSSIP - AF) Consulting Services for Wastewater Master Plan for Mombasa and Selected Towns within the Coast Region Contract No. CWSB/WaSSIP-AF/C/10/2012 FINAL WASTEWATER MASTER PLAN REPORT FOR LAMU ISLAND VOLUME 1: MASTER PLAN MAIN REPORT In Association with: MARCH 2017 Water and Sanitation Service Improvement Project – Additional Financing (WaSSIP - AF) FINAL MASTER PLAN REPORT Wastewater Master Plan for Mombasa and Selected Towns within the Coast Region - LAMU ISLAND “DOCUMENT CONTROL” WATER AND SANITATION SERVICE IMPROVEMENT PROJECT – ADDITIONAL FINANCING (WaSSIP – AF) Wastewater Master Plan for Mombasa and Selected Towns within the Coast Region EMPLOYER: Coast Water Services Board (CWSB) DOCUMENT TITLE: FINAL MASTER PLAN REPORT– LAMU ISLAND RECORDS FOR REVISION Version DATE: DESCRIPTION/PURPOSE OF ISSUE: PREPARED CHECKED APPROVED BY: BY: BY: FINAL MASTER PLAN REPORT– LAMU 01 31-03-2017 JMO/NJN TSM MSB ISLAND MIBP/ CES/ BOSCH Water and Sanitation Service Improvement Project – Additional Financing (WaSSIP - AF) FINAL MASTER PLAN REPORT Wastewater Master Plan for Mombasa and Selected Towns within the Coast Region - LAMU ISLAND WATER AND SANITATION SERVICE IMPROVEMENT PROJECT – ADDITIONAL FINANCING (WaSSIP – AF) Wastewater Master Plan for Mombasa and Selected Towns within the Coast Region FINAL MASTER PLAN REPORT– LAMU TABLE OF CONTENTS EXECUTIVE SUMMARY E1 GOALS AND OBJECTIVES OF THIS STUDY ............................................................................... E1 E2 OBJECTIVES OF THIS REPORT ................................................................................................ E1 E3 STUDY AREA AND DEMOGRAPHY ......................................................................................... E1 E4 WATER DEMAND FORECAST ................................................................................................ E2 E5 WASTEWATER FLOW PREDICTIONS ...................................................................................... E3 E6 WASTEWATER MANAGEMENT STRATEGIES .......................................................................... E4 E7 MULTI-CRITERIA ANALYSIS AND REVIEW OF DEVELOPMENT STRATEGIES .............................. E5 E8 PROJECT COSTS ................................................................................................................... E6 E9 FINANCIAL AND ECONOMIC ANALYSIS OF THE SELECTED DEVELOPMENT STRATEGY .............. E7 E10 CONCLUSION OF THE MASTER PLAN ..................................................................................... E9 MAIN REPORT ................................................................................................................................ 1-1 1.0 PROJECT BACKGROUND ..................................................................................................... 1-1 1.1 GOALS AND OBJECTIVES OF THIS STUDY ....................................................................................... 1-3 1.2 EXECUTION OF THE STUDY ........................................................................................................ 1-3 1.3 OBJECTIVES OF THIS REPORT ..................................................................................................... 1-3 2.0 PROJECT AREA DESCRIPTION .............................................................................................. 2-1 2.1 LOCATION AND ADMINISTRATION .............................................................................................. 2-1 2.2 STUDY AREA ......................................................................................................................... 2-1 2.3 CLIMATE .............................................................................................................................. 2-3 2.4 TOPOGRAPHY, GEOLOGY AND SOILS ........................................................................................... 2-3 2.5 ECONOMIC ACTIVITIES ............................................................................................................. 2-3 2.6 EXISTING WATER SUPPLY AND SANITATION SYSTEMS ...................................................................... 2-3 2.6.1 Water Supply ....................................................................................................................... 2-3 2.6.2 Sanitation System ................................................................................................................ 2-4 2.7 IMMEDIATE MEASURES FOR THE IMPROVEMENT OF SANITATION SYSTEMS ........................................... 2-4 2.7.1 Ablution Blocks .................................................................................................................... 2-5 2.7.2 Sludge Handling Facility ...................................................................................................... 2-8 2.7.3 Implementation Cost for Immediate Measures ................................................................ 2-12 3.0 DEMOGRAPHY, LAND USE AND URBAN DEVELOPMENT ...................................................... 3-1 3.1 DEMOGRAPHY AND POPULATION DYNAMICS FOR LAMU ISLAND ........................................................ 3-1 3.1.1 Previous Population Trend .................................................................................................. 3-1 3.1.2 Population Growth Scenarios.............................................................................................. 3-2 3.1.3 Projected Population for Lamu Island ................................................................................. 3-3 3.2 LAND USE AND URBAN DEVELOPMENT ........................................................................................ 3-4 3.2.1 Introduction ........................................................................................................................ 3-4 3.2.2 Existing Land Use ................................................................................................................. 3-4 3.2.3 Land Use Planning and Policy .............................................................................................. 3-6 MIBP/ CES/ BOSCH i Water and Sanitation Service Improvement Project – Additional Financing (WaSSIP - AF) FINAL MASTER PLAN REPORT Wastewater Master Plan for Mombasa and Selected Towns within the Coast Region - LAMU ISLAND 3.2.4 Land Use Requirement per Land Use Zone ......................................................................... 3-7 4.0 WATER DEMAND FORECAST ............................................................................................... 4-1 4.1 ANALYSIS OF WATER CONSUMPTION RATES ................................................................................. 4-1 4.2 WATER DEMAND PROJECTIONS ................................................................................................. 4-4 5.0 WASTEWATER FLOW PREDICTIONS .................................................................................... 5-1 5.1 DESIGN CRITERIA ................................................................................................................... 5-1 5.1.1 Principal References ............................................................................................................ 5-1 5.1.2 Sewerage Collection System ............................................................................................... 5-1 5.1.3 Sewage Generation ............................................................................................................. 5-1 5.1.4 Peak Flow Factor and Sewer Capacity ................................................................................. 5-3 5.2 PROJECTED WASTEWATER FLOWS .............................................................................................. 5-4 6.0 DESIGN CRITERIA FOR SEWERAGE SYSTEM AND WASTEWATER TREATMENT PLANTS ........... 6-1 6.1 DESIGN OF SEWERS ................................................................................................................. 6-1 6.1.1 Minimum Size of Sewer....................................................................................................... 6-1 6.1.2 Hydraulic Design Criteria ..................................................................................................... 6-1 6.1.3 Self-Cleansing Gradients and Velocities .............................................................................. 6-2 6.1.4 Sulphide Generation ........................................................................................................... 6-2 6.1.5 Ventilation of Sewers .......................................................................................................... 6-3 6.1.6 Depth of Sewers .................................................................................................................. 6-3 6.1.7 Manhole Spacing and Sizes ................................................................................................. 6-4 6.1.8 Pipe Materials ..................................................................................................................... 6-4 6.1.9 Property Connections .......................................................................................................... 6-6 6.2 DESIGN OF SEWAGE PUMPING STATIONS ..................................................................................... 6-6 6.2.1 Sewage Pumps ...................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    184 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us