Newquay Neighbourhood Plan Summary of Evidence and Documentation as at June 2015 V1 June 2015 Produced by CRCC in collaboration with Newquay NP Group CRCC 2 Princes Street Truro Cornwall TR1 2ES CONTENTS 1.0 INTRODUCTION 6 2.0 EVIDENCE GATHERING 6 2.1 COMMUNITY NETWORK AREA (CNA) DOCUMENTATION 6 2.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 6 2.1.2 Community Network Profile (Sept 2014) 7 2.1.3 Newquay Town Framework and emerging Allocations Development Plan Document 8 2.1.4 The Restormel Borough Local Plan 2001-2011 9 2.1.5 Newquay & St Columb Place Based Topic Paper - March 2013 9 2.1.6 The Cornwall and Isles of Scilly Landscape Character Assessment (2007) 9 2.1.7 Cornwall Renewable Energy Supplementary Planning Document – Consultation (Draft 2015) 9 2.1.8 Green Infrastructure Strategy for Cornwall 10 2.1.9 Cornwall Infrastructure Needs Assessment, Newquay & St Columb Schedule (March 2014) 10 2.1.10 Connecting Cornwall 2030 - Cornwall’s Local Transport Plan 10 2.1.11 The Strategic Housing Land Availability Assessment (SHLAA) 2013 10 2.1.12 The Strategic Housing Market Needs Assessment (SHMNA) (2013) 11 2.1.13 Settlements: Hierarchy and Settlement Categories 2012 Update (2013) 11 2.1.14 Cornwall Employment Land Review (2010) 11 2.1.15 Cornwall Retail Study (2010) 11 2.1.16 Cornwall Town Centre Boundaries Assessment (2012) 12 2.1.17 Cornwall Strategic Flood Risk Assessment Level 1(2009) 12 2.1.18 Cornwall Maritime Strategy 2012 – 2030 12 2.1.19 Open Space Strategy for Larger Towns in Cornwall (2014) - Newquay 12 2.1.20 Newquay Cornwall Airport Masterplan 2008-2030 12 2.1.21 Newquay & St Columb Major Area Strategic Investment Framework 2007- 2013 13 2.1.22 Cornwall Towns Study (Roger Tym & Partners - September 2006) 13 2.1.23 Cornwall & Scilly Urban Survey – Historic Characterisation for Regeneration – Newquay April 2003 14 2.1.24 Newquay Hotel & Holiday Accommodation Market & Planning Policy Appraisal (2005) 14 2.2 THE NEWQUAY TOWN AND PARISH PLAN (2010) 14 3.0 VISION, THEME AND POLICY FORMATION – NP GROUP 15 3.1 SCOPING SURVEY (2014 – 2015) 15 3.1.1 Background 15 3.2 CONSULTATION – SECONDARY SCHOOLS LED SURVEYS (2015) 16 3.2.1 Background 16 3.2.2 Parental Questionnaire 16 3.2.3 Student Questionnaire (Tretherras) 16 4.0 THEMES & TOPICS 16 5.0 OPEN SPACE, COMMUNITY AND RECREATION FACILITIES 17 5.1 CORNWALL COUNCIL DOCUMENTATION 17 5.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 17 5.1.2 Open Space Strategy For Larger Towns in Cornwall (2014) 18 5.1.3 Cornwall Local Plan, Place Based Topic Paper: Newquay & St Columb Community Network Area (2013) 23 5.2 PARISH CONSULTATION 24 5.2.1 Scoping Survey Results 2014-2015 24 5.2.2 Secondary Schools Led Surveys 2015 24 5.2.3 Newquay Town and Parish Plan 2010 25 5.3 RECREATION /C OMMUNITY FACILITIES THEME CONCLUSIONS 26 6.0 NATURAL ENVIRONMENT 27 6.1 CORNWALL COUNCIL DOCUMENTATION 27 6.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 27 6.1.2 Newquay and St. Columb Community Network Profile (2014) 28 6.1.3 Newquay Town Framework and emerging Allocations Development Plan Document 28 6.1.4 Cornwall Local Plan, Place Based Topic Paper: Newquay & St Columb Community Network Area (2013) 29 6.1.5 Cornwall and Isles of Scilly Landscape Character Study – Newquay and Perranporth Coast 31 6.2 PARISH CONSULTATION 31 6.2.1 Scoping Survey Results 2014-2015 31 6.2.2 Secondary Schools Led Surveys 2015 31 6.2.3 Newquay Town and Parish Plan 2010 32 6.3 NATURAL ENVIRONMENT THEME CONCLUSIONS 32 7.0 HERITAGE 33 7.1 COMMUNITY NETWORK AREA DOCUMENTATION (2013/14/15) 33 7.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 33 7.1.2 Cornwall Local Plan, Place Based Topic Paper: Newquay & St Columb Community Network Area (2013) 33 7.1.3 Cornwall & Scilly Urban Survey – Historic Characterisation for Regeneration – Newquay April 2003 34 7.1.4 Newquay Shopfront Guide (2004) 39 7.2 PARISH CONSULTATION 39 7.2.1 Scoping Survey Results 2014-2015 39 7.2.2 Secondary Schools Led Surveys 2015 39 7.2.3 Newquay Town and Parish Plan 2010 39 7.3 HERITAGE THEME CONCLUSIONS 39 8.0 HOUSING AND AFFORDABLE HOUSING 40 8.1 COMMUNITY NETWORK AREA DOCUMENTATION (2013/14/15) 40 8.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 40 8.1.2 Newquay Town Framework and emerging Allocations Development Plan Document 41 8.1.3 Community Network Profile (Sept 2014) 45 8.2 PARISH CONSULTATION 45 8.2.1 Scoping Survey Results 2014-2015 45 8.2.2 Secondary Schools Led Surveys 2015 45 8.2.3 Newquay Town and Parish Plan 2010 46 8.3 HOUSING THEME CONCLUSIONS 46 9.0 TRANSPORT AND TRAVEL 47 9.1 COMMUNITY NETWORK AREA DOCUMENTATION (2013/14) 47 9.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 47 9.1.2 Connecting Cornwall 2030, Cornwall’s Local Transport Plan 48 9.1.3 Cornwall Infrastructure Needs Assessment, Newquay & St Columb Schedule 49 9.2 PARISH CONSULTATION 50 9.2.1 Scoping Survey Results 2014-2015 50 9.2.2 Secondary Schools Led Surveys 2015 50 9.2.3 Newquay Town and Parish Plan 2010 50 9.3 TRANSPORT & TRAVEL THEME CONCLUSIONS 51 10.0 ECONOMY 52 10.1 COMMUNITY NETWORK AREA DOCUMENTATION (2013/14) 52 10.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 52 10.1.2 Community Network Profile 53 10.1.3 Newquay Town Framework and emerging Allocations Development Plan Document - 53 10.1.4 Employment Land Review 2010 53 10.1.5 Newquay & St Columb Major Area Strategic Investment Framework 2007- 2013 55 10.2 PARISH CONSULTATION 55 10.2.1 Scoping Survey Results 2014-2015 55 10.2.2 Secondary Schools Led Surveys 2015 55 10.2.3 Newquay Town and Parish Plan 2010 56 10.3 ECONOMIC DEVELOPMENT THEME CONCLUSIONS 56 11.0 DESIGN 57 11.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 57 11.1.2 Cornwall & Scilly Urban Survey – Historic Characterisation for Regeneration – Newquay April 2003 58 11.2 PARISH CONSULTATION 58 11.2.1 Scoping Survey Results 2014-2015 58 11.2.2 Secondary Schools Led Surveys 2015 58 11.2.3 Newquay Town and Parish Plan 2010 58 11.3 DESIGN THEME CONCLUSIONS 59 12.0 RENEWABLE ENERGY 60 12.1 COMMUNITY NETWORK AREA DOCUMENTATION (2013/14) 60 12.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 60 12.1.2 Cornwall Renewable Energy Supplementary Planning Document – Consultation (Draft 2015) 61 12.2 PARISH CONSULTATION 62 12.2.1 Scoping Survey Results 2014-2015 62 12.2.2 Secondary Schools Led Surveys 2015 62 12.2.3 Newquay Town and Parish Plan 2010 63 12.3 RENEWABLE ENERGY THEME CONCLUSIONS 63 13.0 CRIME, DISORDER AND COMMUNITY SAFETY 64 13.1 COMMUNITY NETWORK AREA DOCUMENTATION (2013/14) 64 13.1.1 Cornwall Local Plan 2010-2030 Submission Document (February 2015) - Proposed Submission (March 2014) and Schedule of Focused Changes (September 2014) Combined document to support submission to the Secretary of State – February 2015. 64 13.2 PARISH CONSULTATION 65 13.2.1 Scoping Survey Results 2014-2015 65 13.2.2 Secondary Schools Led Surveys 2015 65 13.2.3 Newquay Town and Parish Plan 2010 65 13.3 CRIME , DISORDER AND COMMUNITY SAFETY THEME CONCLUSIONS 66 14.0 OTHER CONSIDERATIONS 67 14.1 NEXT STEPS AND EVIDENCE GATHERING 67 1.0 Introduction This report presents summary results of the evidence and documentation gathered during the process of forming Newquay’s Neighbourhood Plan (NP). This document is structured thematically into sections e.g. Housing, Natural Environment, Heritage, Transport and Travel etc. A number of sources of evidence have contributed to the formation of Newquay NP. These sources are briefly set out in Section 2: Evidence Gathering. Work carried out by the NP Group or other working group members is then listed in Section 3. The results and conclusions drawn from these sources are then presented within Sections 5–13, with any additional comments in Section 14. It should also be noted that due to the variable nature of how the evidence has been gathered and presented (e.g.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages67 Page
-
File Size-