Ross Bennett @Golder.Com

Ross Bennett @Golder.Com

REPORT ON-PROPERTY SITE INVESTIGATION WORK PLAN Saint-Gobain Performance Plastics Facility 701 Daniel Webster Highway in Merrimack, New Hampshire Submitted to: New Hampshire Department of Environmental Services Hazardous Waste Remediation Bureau 29 Hazen Drive, PO Box 95 Concord, New Hampshire 03302 Submitted by: Saint-Gobain Performance Plastics Corp. 14 McCaffrey Street Hoosick Falls, New York 12090 Submitted by: Golder Associates Inc. 670 North Commercial Street, Suite 103 Manchester, New Hampshire, USA 03101 June 8, 2018 June 8, 2018 1668623 Table of Contents 1.0 INTRODUCTION ............................................................................................................................................. 1 2.0 BACKGROUND .............................................................................................................................................. 1 2.1 Property and Facility History ................................................................................................................ 1 2.2 Summary of Previous Investigations .................................................................................................... 3 3.0 PRELIMINARY CONCEPTUAL SITE MODEL .............................................................................................. 3 3.1 Geologic and Hydrogeologic Setting .................................................................................................... 4 3.2 Potential Releases and Transport Mechanisms .................................................................................. 5 3.3 Nature and Extent of PFAS .................................................................................................................. 6 4.0 INVESTIGATION OBJECTIVES AND SCOPE OF WORK ............................................................................ 7 4.1 Investigation Objectives ....................................................................................................................... 7 4.2 Scope-of-Work ..................................................................................................................................... 8 4.2.1 PRA-Specific Investigations ............................................................................................................ 9 4.2.2 Soil Sampling and Analysis ........................................................................................................... 14 4.2.3 Groundwater Sampling and Analysis ............................................................................................ 15 4.2.4 Hydraulic Testing and Water Level Elevation Monitoring ............................................................. 15 5.0 METHODS AND PROCEDURES ................................................................................................................. 15 5.1 General ............................................................................................................................................... 15 5.2 Soil Boring Advancement and Soil Sampling ..................................................................................... 16 5.3 Monitoring Well Installation ................................................................................................................ 16 5.3.1 Installation of Monitoring Wells ..................................................................................................... 16 5.3.2 Installation of Temporary Monitoring Wells ................................................................................... 17 5.3.3 Development ................................................................................................................................. 17 5.3.4 Surveying ...................................................................................................................................... 18 5.4 Groundwater Sampling ...................................................................................................................... 18 5.4.1 Sample Purging and Stabilization ................................................................................................. 18 5.4.2 Sample Collection ......................................................................................................................... 19 ii June 8, 2018 1668623 5.5 Groundwater Elevation Measurement ............................................................................................... 20 5.6 Quality Control.................................................................................................................................... 20 5.6.1 Field Duplicates............................................................................................................................. 20 5.6.2 Trip Blanks .................................................................................................................................... 21 5.6.3 Equipment Blanks ......................................................................................................................... 21 5.6.4 Field Blanks ................................................................................................................................... 21 5.6.5 Analytical QA/QC .......................................................................................................................... 21 5.7 Decontamination ................................................................................................................................ 21 5.8 Investigation-Derived Waste .............................................................................................................. 22 5.9 Equipment Calibration ........................................................................................................................ 22 5.10 Slug Testing ....................................................................................................................................... 22 5.11 Data Management .............................................................................................................................. 23 5.12 Data Validation ................................................................................................................................... 24 6.0 SCHEDULE AND PROJECT ORGANIZATION ........................................................................................... 24 6.1 Schedule ............................................................................................................................................ 24 6.2 Project Organization ........................................................................................................................... 25 7.0 ACRONYMNS AND ABBREVIATIONS ....................................................................................................... 26 8.0 REFERENCES CITED .................................................................................................................................. 28 9.0 CLOSING ...................................................................................................................................................... 30 TABLES Table 1 Potential Release Areas Table 2 Soil Investigation Locations – PFAS Analysis Table 3 Soil Investigation Locations – Non-PFAS Analysis Table 4 Overburden Groundwater Investigation Locations – First Sampling Event Table 5 Overburden Groundwater Investigation Locations – Second Sampling Event Table 6 Bedrock Groundwater Investigation Locations Table 7 PFAS Analyte List iii June 8, 2018 1668623 FIGURES Figure 1 Facility Location Map Figure 2 Facility and Nearby Property Locations Figure 3 Facility Plan Figure 4 Potential Release Areas Figure 5 Proposed Investigations APPENDICES Appendix A NHDES SI Work Plan Comments Appendix A-1 NHDES Comment Letter Appendix A-2 Response to NHDES Comments Appendix B Facility Release History Appendix C General Field Methods for PFAS Sampling Programs Appendix D Geoprobe Screen Point 16 Groundwater Sampler Standard Operating Procedure iv June 2018 1668623 1.0 INTRODUCTION On behalf of Saint-Gobain Performance Plastics (SGPP), Golder Associates Inc. (Golder) prepared this On- property Site Investigation Work Plan (Work Plan) for the SGPP Facility located at 701 Daniel Webster Highway in Merrimack, New Hampshire (the Facility; as shown in Figure 1). The New Hampshire Department of Environmental Services (NHDES) has designated the property a Remediation Site (Facility ID #199712055, Project Number 36430) due to the presence of perfluoroalkyl substances (PFAS) in soil and groundwater. This Work Plan presents the objectives, proposed scope-of-work and methods for assessing “on-property” (i.e., Tax Lot 6E-3-2) soil and groundwater to satisfy the Site Investigation requirements outlined in ENV-Or 606. In addition to the scope-of-work described herein, SGPP is performing on-property quarterly groundwater monitoring, off-property investigation of surface water, stormwater and garden soils, and sampling of off-property residential wells under separate work plans. The remainder of this Work Plan is organized as follows: Section 2 – Background Section 3 – Preliminary Conceptual Site Model Section 4 – Investigation Objectives and Scope-of-Work Section 5 – Methods and Procedures Section 6 – Schedule and Project Organization Section 7 – Acronyms and Abbreviations Section 8 – References Cited 2.0 BACKGROUND Following Initial Site Characterization (ISC) field investigation activities, C. T. Male Associates (C.T.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    95 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us