Construction Arna - Bergen Stian Ekornaas Head of Strategies and Contracts Railway Tender Conference Oslo, 10 May 2017 Construction Arna - Bergen

Construction Arna - Bergen Stian Ekornaas Head of Strategies and Contracts Railway Tender Conference Oslo, 10 May 2017 Construction Arna - Bergen

Construction Arna - Bergen Stian Ekornaas Head of Strategies and Contracts Railway Tender Conference Oslo, 10 May 2017 Construction Arna - Bergen • 2 projects: ‒ Arna – Fløen ‒ Bergen – Fløen • Approx. 50 employees in Client organisation • Offices in Arna and the city centre of Bergen 2 Information is correct as of 10 May 2017, but may be subject to change. Arna – Fløen – Bergen 3 Arna - Fløen • Production from 2014 • Completed 2022 • New parallel tunnel Arna – Fløen (Ulriken tunnel) ‒ TBM ‒ Breakthrough autumn 2017 • Arna station ‒ Start-up August 2017 • UUT 31 Railway-technical contract 4 Information is correct as of 10 May 2017, but may be subject to change. TBM - New Ulriken tunnel 5 Information is correct as of 10 May 2017, but may be subject to change. Arna station 2022 6 Information is correct as of 10 May 2017, but may be subject to change. UUT 31 Railway-technical contract - p.1 • Interdisciplinary railway-technical contract ‒ Track/superstructure ‒ Catenary system ‒ Low-voltage system ‒ High-voltage system ‒ Telecommunications • New tunnel (7,8 km) • Updating old tunnel • Arna station area 7 Information is correct as of 10 May 2017, but may be subject to change. Railway-technical work at Arna station 8 Information is correct as of 10 May 2017, but may be subject to change. UUT 31 Railway-technical contract - p.2 • Tendered autumn 2017 • Contract summer 2018 • Planned start-up 1. quarter 2019 • Completion 3. quarter 2022 • Detailed design delivered by Bane NOR • Contractor will be responsible for design of the slab track part of the tunnel (7 km) • Estimated cost MNOK 500 9 Information is correct as of 10 May 2017, but may be subject to change. The New Ulriken Tunnel Arna Bergen 10 Information is correct as of 10 May 2017, but may be subject to change. Bergen - Fløen • Double-tracking Bergen – Fløen (1,3 km) • Renewal of existing systems • Project underway for several years • High complexity due to location (city centre), limited space and old infrastructure • Bane NOR needs to take into consideration several other projects ‒ Bergen light rail ‒ Freight terminal ‒ Railway projects • Bane NOR will review the scope of the project • Working on a new project progress plan. This will be settled in the near future 11 Information is correct as of 10 May 2017, but may be subject to change. Fløen 12 Information is correct as of 10 May 2017, but may be subject to change. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us