Karnataka Integrated and Sustainable Water Resources Management Investment Program ADB LOAN 3836-IND

Karnataka Integrated and Sustainable Water Resources Management Investment Program ADB LOAN 3836-IND

KARNATAKA NEERAVARI NIGAM LTD Karnataka Integrated and Sustainable Water Resources Management Investment Program ADB LOAN 3836-IND Quarterly Progress Report July-September 2020 Project Management Unit, KISWRMIP Project Support Consultant SMEC International Pty. Ltd. Australia in association with SMEC (India) Pvt. Ltd. 19 December 2020 DOCUMENTS/REPORT CONTROL FORM Report Name Quarterly Progress Report July-September 2020 Karnataka Integrated and Sustainable Water Resources Management Project Name: Investment Program Project Number: 5061164 Report for: Karnataka Neeravari Nigam Ltd (KNNL) REVISION HISTORY Revision Date Prepared by Reviewed by Approved by # Dr. Srinivas Mudrakartha Dr Srinivas Dr Srinivas 19 December 1 Balaji Maddikera Mudrakartha/ Mudrakartha/ 2020 (Draft) Deepak GN and Team Gaurav Srivastava Gaurav Srivastava ISSUE REGISTER Distribution List Date Issued Number of Copies KNNL 19 December 2020 10 SMEC Staff 19 December 2020 2 Associate (Gaurav Srivastava) 19 December 2020 1 Office Library (Hospet) 19 December 2020 1 SMEC Project File 19 December 2020 2 SMEC COMPANY DETAILS Dr Janardhan Sundaram, Executive Director 1st Floor, Novus Tower, West Wing, Plot Number-18, Sector–18, Gurgaon–122016, Haryana Tel: +91 124 4501100 Fax: +91 124 4376018 Email: [email protected];Website:www.smec.com CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 1 2.0 KISWRMIP-MODERNIZATION OF IRRIGATION PROJECTS .............................................. 3 2.1 Tranche 2-Vijayanagara Channels Irrigation System ....................................................... 3 2.1.1 Project Management ................................................................................................. 4 2.1.2 Project Basic Data ..................................................................................................... 7 2.1.3 Utilisation of Funds .................................................................................................... 8 2.1.3.1 Contract Awards .................................................................................................... 8 2.1.3.2 Disbursements ...................................................................................................... 8 2.1.4 Design and Monitoring Framework Indicators .......................................................... 9 2.1.5 Key Activities and Milestones ................................................................................. 10 2.1.1 Agreed Action Points from Aide memoire ............................................................... 11 2.1.2 Project 2 Deliverables ............................................................................................. 13 2.2 Tranche 2 VNC Modernization project ............................................................................ 13 2.2.1 Modernization Works: VNC Package 1 .................................................................. 13 2.2.1.1 Physical Progress ................................................................................................ 14 2.2.1.2 Financial Progress ............................................................................................... 18 2.2.1.3 S Curves .............................................................................................................. 20 2.2.2 Safeguard Monitoring .............................................................................................. 23 2.2.2.1 Risk Mitigation measures for COVID 19 ............................................................. 27 2.2.2.2 Grievance Redressal Mechanism ....................................................................... 27 2.2.3 Third Party Quality Assurance ................................................................................ 29 2.2.4 Public Consultations ................................................................................................ 31 2.3 WUCS formation and strengthening activity ................................................................... 32 2.3.1 Baseline Assessment of WUCS .............................................................................. 32 2.3.2 Capacity Building of WUCS .................................................................................... 32 2.3.3 Revival and Registration of WUCS ......................................................................... 39 2.4 Sustainable Agriculture Activity ....................................................................................... 40 2.4.1 System of Rice Intensification paddy ...................................................................... 43 2.4.2 Direct Seeding of Rice ............................................................................................ 46 2.4.3 Promotion of Organic Farming ................................................................................ 49 2.4.3.1 Growth promoters and Bio-pesticides ................................................................. 49 2.4.3.2 Waste decomposer ............................................................................................. 50 2.4.3.3 Ghana Jeevamrutha ............................................................................................ 51 2.4.3.4 Jeevamrutha ........................................................................................................ 52 2.4.3.5 Low cost Vermicompost ...................................................................................... 53 2.4.3.6 Poochimarandu: A broad-spectrum biopesticide ................................................ 54 2.4.4 System of crop intensification: Guli Ragi ................................................................ 55 2.4.5 Revival of Traditional Crop Varieties ...................................................................... 56 2.4.5.1 Evaluation and demonstration of desi rice germplasm ....................................... 57 2.4.6 Study Tours ............................................................................................................. 57 2.4.7 Sustainable Sugarcane Initiative ............................................................................ 59 2.4.8 Kitchen Garden ....................................................................................................... 61 2.5 Social Management Framework and Gender Action Plan.............................................. 64 2.5.2.1 Capacity Building Programs ................................................................................ 65 2.5.2.2 Women Subcommittees ...................................................................................... 67 2.5.4 Livelihood Activities by Women .............................................................................. 73 Tranche 2-Quarterly Progress Report Apr-Jun 2020 Page | i 2.5.5 GAP progress in VNC ............................................................................................. 74 2.6 Information, Education and Communication ................................................................... 80 2.7 Program Performance Management System ................................................................. 82 3.0 TUNGABHADRA LEFT BANK CANAL ................................................................................ 86 4.0 PROJECT STAFF MOBILISATION ...................................................................................... 88 LIST OF TABLES Table 1: PMU Staff position ............................................................................................................. 4 Table 2: Project Basic Data ............................................................................................................. 7 Table 3: Detailsof Contract award under Tranche 2 ........................................................................ 8 Table 4: Details of disbursement ..................................................................................................... 8 Table 5: Status of DMF .................................................................................................................... 9 Table 6: Agreed Action Points ....................................................................................................... 11 Table 7: Important deliverables for Project-2 activities .................................................................. 13 Table 8: Physical progress of RBC works as of 30September 2020-VNC Package 1 ................. 15 Table 9: Physical progress of LBC works as of 30September 2020-VNC Package 1 .................. 16 Table 10: Financial Progress of RBC works as of 30 September 2020 (VNCPackage 1) ........... 18 Table 11: Financial progress of LBC works as of 30 September 2020-VNC Package 1 .............. 19 Table 12: Details of trees cut from various canals ........................................................................ 25 Table 13: List of compensatory tree plantation along VNC as of September 2020 ...................... 25 Table 14: Tree species selected by communities for compensatory tree plantation .................... 26 Table 15: Grievances registered as of 30 September 2020 .......................................................... 28 Table 16: WUCS strengthening and capacity building activities as of 30 September 2020 ......... 34 Table 17: Trainings on sustainable agricultural practices ............................................................ 42 Table 18: Status of SRI Kharif-2020 Paddy farmers as of 30 September 2020 ..........................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    125 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us