REGIONAL REPORT on the APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA June 2018

REGIONAL REPORT on the APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA June 2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA June 2018 Date No. Company Name and Address Project Name Principal / Owner Approved CHARLZ CONST./CHARLES L. 18NF0067:RETROFITTING/STRENGTHRNING OF DPWH SDN 1ST DEO 1 GOSINGCO/COR. BORROMEO ST. & PERMANENT BRIDGES AMOSLOG BRIDGE(B00977MN) 6/5/2018 VASQUEZ ST. SURIGAO CITY ALONG SURIGAO DAVAO COASTAL RD A.T. DUMLAO CONSTRUCTION/ DPWH SDN 1ST DEO 2 June 5, PABLO YVES L. DUMLAO II/ 3871 18NF0051:CONCRETING OF BRGY. ROAD 2018 NARCISO ST., SURIGAO CITY LVRO CONSTRUCTION AND DPWH SDN 1ST DEO 3 SUPPLY/VON RONALD M. June 5, 18NF0007: CONST. OF RIVER CONTROL OCENAR/11172 BRGY. RIZAL, 2018 SURIGAO CITY,SURIGAO DEL NORTE FFJJ CONST./OSMENA L. DPWH-SDS 1ST DEO 4 PALANGGALAN/BLK 4, LOT 18NH0014: KAG-AYONGAN BRIDGE [B00670MN] ALONG June 5, 21,KALAYAAN ST.,SKYLINE [PHASE SURIGAO-DAVAO COASTAL RD. 2018 III], DAVAO CITY 18ND0039: CONST. OF MAIN DRAINAGE CANAL ALONG DPWH-BUTUAN CITY 5 ADFIL CORP./JOSEPH Q. June 5, JCT. MONTILLA BOULEVARD-T. CALO ST.-JCT OCHOA ST.- DEO GORME/DOONGAN, BUTUAN CITY 2018 JCT CALO ST. LADP MAIN DRAINAGE CANAL, BUTUAN CITY GICAR CONST. INC/ERNESTO G. DPWH-BUTUAN CITY 6 18ND01073:REVETMENT OF TAGUIBO RIVER AT SITIO June 5, CHUA/00831 SAN NICOLAS ST. DEO IYAO, BRGY. ANTICALA BUTUAN CITY 2018 SURIGAO CITY OLIN DEV'T ENGINEERING AND DPWH-ADS 1ST DEO CONST./ENGR. NILO C. OBUS/2ND 7 18NB0053: CONST. OF MULTI-PURPOSE BUILDING June 6, FLOOR MATITO BUILDING, NORTH (EVACUATION CENTER) 2018 MONTILLA BOULEVARD, BUTUAN CITY KELVIN CONST./KING JOHN A. DPWH-ADN DEO 8 18NA0051: REHABILITATION OF MULTI-PURPOSE June 6, TUPAZ/P-19, ALVIOLA VILLAGE, BUILDING, BRGY. JAGUPIT,SANTIAGO ADN 2018 BRGY. BAAN KM3 BUTUAN CITY 18NO0054: CONST. OF MISSING LINKS, COMPLETION OF DPWH-ROXIII ULTICON BUILDERS, INC/RICARDO S. 9 EAST-WEST LATERAL RD. CONNECTING ADS/ADN TO June 6, VERDILLO/DON JULIAN RODRIGRUEZ BUKIDNON,SAMPAGUITA-MAKILOS(ADS/BUKIDNON 2018 SR. AVE. MA-A,DAVAO CITY BOUNDARY),PACKAGE 7,ADS,2.2 CONST. OF MISSING Page 1 of 22 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA June 2018 Date No. Company Name and Address Project Name Principal / Owner Approved LINKS,COMPLETION OF THE EAST-WEST LATERAL RD CONNECTING ADS/ADN TO BUKIDNON,SAMPAGUITS- MAKILOS9ADS/BUKIDNON BOUNDARY),PACKAGE 8,ADS CHARLZ CONST./CHARLES L. DPWH-SDN 1ST DEO 10 18NF0065: NETWORK DEV'T ROAD WIDENING OF June 6, GOSINGCO/COR. BORROMEO ST. & SURIGAO-DAVAO COASTAL ROAD,K1162+000-K1162+574 2018 VASQUEZ ST. SURIGAO CITY ALGAMON CONST./LILIA V. 18NF0070: CONST./IMPROVEMENT OF ACCESS ROADS DPWH-SDN 1ST DEO 11 June 6, TAMAYO/00126 RIZAL ST. SURIGAO LEADING TO SEAPORT NJR POB. ALEGRIA ROAD LEADING 2018 CITY TO MAINIT LAKE BOAT LANDIN FACILITY 12 JMT CONST./JOEY M TAN/10029 18NF0068: NETWORKING DEV'T. OF ROAD WIDENING OF June 6, DPWH-SDN 1ST DEO BRGY. LUNA, SURIGAO CITY PRIMARY NATIONAL RD DAANG MAHARLIKA 2018 ASJ BUILDERS/ANTONIO S. SIO, SR./ DPWH-SDN 1ST DEO 13 June 6, 03535 BORROMEO ST., SURIGAO 18NF0060: CONST. OF WATER SYSTEM, BRGY. BALITE 2018 CITY A.T. DUMLAO CONSTRUCTION/ DPWH-SDN 1ST DEO 14 June 6, PABLO YVES L. DUMLAO II/ 3871 18NF0055: CONCRETING OF MARGA-CAPAYAHANROAD 2018 NARCISO ST., SURIGAO CITY 18NO0076: CONST. OF MISSING LIN KS,COMPLETION OF DPWH-ROXIII EAST-WEST LATERAL RD. CONNECTING ADS/ADN TO ULTICON BUILDERS, INC/RICARDO S. BUKIDNON, SAMPAGUITA-MAKILOS(ADS/BUKIDNON 15 June 6, VERDILLO/DON JULIAN RODRIGRUEZ BOUNDARY), PACKAGE 13,ADS,4.2 CONST. OF MISSING 2018 SR. AVE. MA-A,DAVAO CITY LINKS, COMPLETION OF THE EAST-WEST LATERAL RD CONNECTING ADS/ADN TO BUKIDNON, SAMPAGUITA- MAKILOS9ADS/BUKIDNON BOUNDARY0PACKAGE 14,ADS NORTHERN BUILDERS/VICTOR M. DPWH-ROXIII 18NO0001:CONST. OF ACCESS ROADS LEADING TO 16 ANGELES/KM. 131 C.P. ROMULO June 6, DECLARED TOURISM DESTINATION, CIRCUMFERENTIAL HIGHWAY, BARAS-BARAS,TARLAC 2018 ROAD LEADING TO LAKE MAINIT CITY MAMSAR CONST. & INDUSTRIAL DPWH-SDN 2ND DEO 17 CORP./ENGR. ALMITA DASMARINAS- 18NG0013: ACCESS ROAD LEADING TO JUNCTION ROXAS- June 6, BARUG/MACAPAGAL AVE., TUBOD, BUHING CALIPAY LAGOON STA. 0+000-STA. 1+600 2018 ILIGAN CITY, LANAO DEL NORTE Page 2 of 22 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA June 2018 Date No. Company Name and Address Project Name Principal / Owner Approved MAMSAR CONST. & INDUSTRIAL DPWH-SDN 2ND DEO 18NG0069: TAYTAY BRIDGE )B00013SG) ALONG JCT. DEL 18 CORP./ENGR. ALMITA DASMARINAS- June 6, CARMEN STA. MONICA SAN. ISIDRO RD, BARUG/MACAPAGAL AVE., TUBOD, 2018 (RETROFITTING/STRENGTHENING) ILIGAN CITY, LANAO DEL NORTE MAMSAR CONST. & INDUSTRIAL DPWH-SDN 2ND DEO 18NG0082:ACCESS ROAD LEADING TO DONA HELENE 19 CORP./ENGR. ALMITA DASMARINAS- June 6, PORT OF BUCAS GRANDE ISLAND, SOCORRO,SDN,STA. BARUG/MACAPAGAL AVE., TUBOD, 2018 0+000-STA.1+240 ILIGAN CITY, LANAO DEL NORTE R. SEMILLA CONST. AND DPWH-SDN 2ND DEO 18NG0033:CLUSTER D REPAIR/REHAB OF MULTIPURPOSE MARKETING/ROBERTO S. 20 BUILDING (COVERED COURT)BRGY. MATIN AO/REHAB OF June 6, SEMILLA/ROOM 307, DONA SEGUNDA MULTI PURPOSE HALL SAN MATEO/REPAIR/REHAB OF 2018 BUILDING,C.C. RECTO ST. DAVAO MULTI PURPOSE BUILDING (BRGY HALL) BRGY. POB 1 CITY 18NC0032: REHAB/REPAIR OF SLOPE PROTECTION OF DPWH-ADS 2ND DEO 21 ADFIL CORP./JOSEPH Q. June 6, BAHAYAN RIVER PROTECTING SALVACION BRIDGE W/ GORME/DOONGAN, BUTUAN CITY 2018 CHANNEL DESILTATION(UPSTREAM) 18NC0044:CONST. OF BANK PROTECTION OF SIMULAO DPWH-ADS 2ND DEO 22 ADFIL CORP./JOSEPH Q. June 6, RIVER, PROTECTING DAANG MAHARLIKA (AGUSAN-DAVAO GORME/DOONGAN, BUTUAN CITY 2018 SECTION) 18NB0050:CONST./IMPROVEMENT OF ACCESS RDS ALONG DPWH-ADS 23 DATREBIL CONST. & SUPPLY/ANGEL NRJ MABUHAY-SAN LORENZO RD LEADING TO BEGA PARK June 6, UY/P2-A BADING BUTUAN CITY & RESORT,UGNOP CAVES,HAPON FALLS,TUGONAN FALLS 2018 AND SAN LORENZO HOT SPRING GEVANS CONST. & SUPPLY/SHAINE DPWH-DIDEO 24 June 6, OLIVER V. TAMAYO/00126 RIZAL ST. 18NE0003:CONST OF ROADS, DINAGAT,DINAGAT ISLAND 2018 SURIGAO CITY GEVANS CONST. & SUPPLY/SHAINE DPWH-SDN 25 June 6, OLIVER V. TAMAYO/00126 RIZAL ST. 18NF0016: CONST. OF BRGY. HALL/BRGY. PANANAY-AN 2018 SURIGAO CITY GEVANS CONST. & SUPPLY/SHAINE DPWH-DIDEO 26 June 6, OLIVER V. TAMAYO/00126 RIZAL ST. 18NF0046: CONCRETING OF BRGY. ROAD 2018 SURIGAO CITY Page 3 of 22 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA June 2018 Date No. Company Name and Address Project Name Principal / Owner Approved GEVANS CONST. & SUPPLY/SHAINE DPWH-1ST DEO 27 18NF0056: CONCRETING OF BRGY. ROAD IN BRGY. June 6, OLIVER V. TAMAYO/00126 RIZAL ST. BALIBAYON 2018 SURIGAO CITY 18NG0021: CONST./IMPROVEMENT OF ACCESS ROADS DPWH-SDN 1ST DEO MAMSAR CONST. & INDUSTRIAL LEADING TO SEAPORT NRJ DAANG MAHARLIKA (LIPATA- 28 CORP./ENGR. ALMITA DASMARINAS- June 6, SURIGAO SECTION) BIOBORJAN RIZAL-SABANG III BARUG/MACAPAGAL AVE., TUBOD, 2018 LEADING TO LIPATA PORT, INCLUDING ROW & SLOPE ILIGAN CITY, LANAO DEL NORTE PROTECTION MONOLITHIC CONST. AND 18NF0071:WIDENING OF PERMANENT BRIDGES TO MORE DPWH-SDN 1ST DEO 29 CONCRETE PRODUCTS, INC/A.T. THAN TWO LANES KINABUTAN BRIDGE 2 ALONG DAANG June 6, DUMLAO CONST,INC. JOINT MAHARLIKA (LIPATA-SURIGAO SECTION) BRGY. RIZAL 2018 VENTURES/PABLI YVES L. DUMLAO II SURIGAO CITY 18NC0078:REPAIR/REHAB OF CONCRETE PAVEMENT DPWH-2ND DEO ADS 30 JB CONST,/LILIOSO S. BEGYAN (REBLOCKING OF PUMPING AND DEPRESSION) ALONG June 7, III/BRGY. 5 SAN FRANCISCO,ADS DAANG MAHARLIKA (AGUSAN-DAVAO RD),NRJ CUEVAS- 2018 BISLIG ROAD AND NRJ CUEVAS-STA JOSEFA RD HEXAMINDZ CORP/HENRY B. DPWH-2ND DEO ADS 31 18NC0051:CONST. OF BYPASS AND DIVERSION ROADS OF June 7, SABATE/PEARL ST. MARFORI ROSARIO-MARFIL-TAGBINA RD PACKAGE A 2018 HEIGHTS SUBD., DAVAO CITY HEXAMINDZ CORP/HENRY B. 18NC0067:CONST. OF BY PASS AND DIVERSION RD, NJR DPWH-2ND DEO ADS 32 June 7, SABATE/PEARL ST. MARFORI HUBANG-MANAGBANAY-ALEGRIA DIVERSION RD 2018 HEIGHTS SUBD., DAVAO CITY INCLUDING ROW WITH BRIDGE 18NC0045: CONST. OF BY-PASS AND DIVERSION ROAD, DPWH-2ND DEO ADS HEXAMINDZ CORP/HENRY B. 33 SAN FRANCISCO (NJR HUBANG STA. ANA-SAN ISIDRO) BY- June 7, SABATE/PEARL ST. MARFORI PASS ROAD (DAANG MAHARLIKA ALTERNATIVE 2018 HEIGHTS SUBD., DAVAO CITY ROUTE)INCL. ROW, K0+000-K.2+000 ALGAMON CONST./LILIA V. DPWH-DIDEO 34 18NE0008: REPAIR/REHAB OF NATIONAL RD ALONG June 7, TAMAYO/00126 RIZAL ST. SURIGAO DINAGAT-LORETO ROAD, SAN JOSE DINAGAT ISLAND 2018 CITY R.F. VARQUEZ CONST./ROLDAN F. 18NE0012: REPAIR/MAINTENANCE OF TAGBABOY BRIDGE DPWH-DIDEO 35 June 7, VARQUEZ/00126 RIZAL ST. SURIGAO REVETMENT ALONG DINAGAT LORETO RD,BRGY. DONA 2018 CITY HELENE,TAG-ABACA,DINAGAT ISLAND Page 4 of 22 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA June 2018 Date No. Company Name and Address Project Name Principal / Owner Approved R.F. VARQUEZ CONST./ROLDAN F. 18NE0013: REPAIR/MAINTENANCE OF DONA HELENE DPWH-DIDEO 36 June 7, VARQUEZ/00126 RIZAL ST. SURIGAO BRIDGE 1 REVETMENT PHASE III ALONG DINAGAT LORETO 2018 CITY ROAD,BRGY. DONA HELENE,TAG-ABACA, DINAGAT ISLAND R.F. VARQUEZ CONST./ROLDAN F. DPWH-DIDEO 37 18NE0014: REPAIR/MAINTENANCE OF ROAD SLIP BRIDGE June 7, VARQUEZ/00126 RIZAL ST. SURIGAO REVETMENT ALONG DPWH-DIDEO COMPUND 2018 CITY MC GEOMETRIC PROPORTIONS, DPWH-SDN 2ND DEO INC/ENGR. JASON B. 38 ALONZO/6H,WESTGATE 17NG0078:CONCRETING OF SAYAK TO DOMOYOG FMR June 7, TOWER,INVESTMENT (PHASE 1) 2018 DRIVE,MADRIGAL BUSINESS PARK,AYALA ALABANG MUNTINLUPA MC GEOMETRIC PROPORTIONS, DPWH-SDN 2ND DEO INC/ENGR. JASON B. 17NG0034:CONST. OF 3 STY-15CLR SCHOOL BUILDING. 39 ALONZO/6H,WESTGATE June 7, GEN. LUNA NHS(SCH.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us