Department of the Navy, Enclosure #8; NAWCWD Decommissioning

Department of the Navy, Enclosure #8; NAWCWD Decommissioning

DECOMMISSIONING PLAN for NAVAL AIR WEAPONS STATION (NAWS) CHINA LAKE Prepared by New World Technology 448 Commerce Way Livermore, CA 94551 Revision 3 – 7/2/2007 Enclosure (8) Decommissioning Plan NAWS China Lake TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY _______________________________________________ 10 1.1 Background Information _____________________________________________ 10 1.2 Decommissioning Objectives __________________________________________ 11 1.3 ALARA Evaluations (Revise to summarize analysis of Section 7.0) __________ 12 1.4 Derived Concentration Guideline Limits (DCGLs) ________________________ 13 1.5 Schedule ___________________________________________________________ 14 1.6 Post Remediation Activities ___________________________________________ 14 1.7 License Amendment _________________________________________________ 14 2.0 FACILITY OPERATING HISTORY ______________________________________ 14 2.1 Current License Number/Status _______________________________________ 17 2.2 Current Authorized Activities _________________________________________ 17 2.3 License and Naval Radioactive Material Permit History ___________________ 17 2.4 Locations Potentially Impacted by Licensed and Non-Licensed DU Activities at China Lake (Historical Review) _____________________________________________ 20 2.4.1 Kennedy Stands Target Area _________________________________________ 20 2.4.2 K-2 Gunnery Range ________________________________________________ 21 2.4.3 Tower 11 Range ___________________________________________________ 22 2.4.4 G-6 Range ________________________________________________________ 28 2.4.5 Burro Canyon-Dead Man’s Canyon ____________________________________ 30 2.4.6 Building 10520 Range ______________________________________________ 30 2.4.7 T-Range Burning Ground (IR Site 6) __________________________________ 31 2.4.8 Skytop, Skytop Playa, Mineshafts _____________________________________ 31 2.4.9 Boondock Facility __________________________________________________ 31 2.4.10 Building 10632 __________________________________________________ 31 2.4.11 Supersonic Naval Ordnance Research Track (SNORT) ___________________ 31 2.4.12 Building 10522 __________________________________________________ 32 2.4.13 Building 10524 __________________________________________________ 32 2.4.14 Building 10540 __________________________________________________ 32 2.4.15 Building 10562 __________________________________________________ 32 2.4.16 Building 10630 __________________________________________________ 32 2.4.17 Building 11640 __________________________________________________ 32 2.4.18 Building 11681 __________________________________________________ 32 2.4.19 Building 15570 __________________________________________________ 32 2.4.20 Building 30594 __________________________________________________ 32 2.4.21 Building 31003 __________________________________________________ 32 2.4.22 Building 31018 __________________________________________________ 33 2.4.23 Building 31110 __________________________________________________ 33 Revision 3 – 7/2/2007 i Decommissioning Plan NAWS China Lake 2.4.24 Building 15510 __________________________________________________ 33 2.4.25 CT Area ________________________________________________________ 33 2.4.26 Building 15560 __________________________________________________ 33 2.4.27 Magazette 45M-4-13 ______________________________________________ 33 2.4.28 Airport Lake ____________________________________________________ 33 2.4.29 B-1-B Range ____________________________________________________ 33 2.4.30 B-4 Range ______________________________________________________ 34 2.4.31 Building 10634 __________________________________________________ 34 2.4.32 Building 12520 __________________________________________________ 34 2.4.33 Building 13090 __________________________________________________ 34 2.4.34 Building 13110 __________________________________________________ 34 2.4.35 Building 30888 __________________________________________________ 34 2.4.36 Building 30973 __________________________________________________ 34 2.4.37 Cole Flats ______________________________________________________ 34 2.4.38 Coso Military Target Range ________________________________________ 35 2.4.39 G-1 Range ______________________________________________________ 35 2.4.40 G-2 Range ______________________________________________________ 35 2.4.41 LC Ranges ______________________________________________________ 35 2.4.42 Off-Station Target-1 (OST-1) Range _________________________________ 35 2.4.43 Salt Wells Pilot Plant (SWPP) Facility ________________________________ 35 2.4.44 Building 15700 __________________________________________________ 35 2.4.45 X-3 Bomb Craters ________________________________________________ 35 2.4.46 X-Pad at NAF ___________________________________________________ 36 2.5 Previous Decommissioning Activities ___________________________________ 36 2.5.1 Skytop Playa Mineshafts_____________________________________________ 37 2.5.2 Tower 11 Target Area _______________________________________________ 37 2.5.3 Site 6 Burn Facility (T-Range Burn Pits) ________________________________ 38 2.5.4 Building 10520 Range (known in the historical record as Building 52) ________ 39 2.6 Spills ______________________________________________________________ 39 3.0 FACILITY DESCRIPTION _____________________________________________ 40 3.1 Site Location and Description _________________________________________ 40 3.2 Population Distribution ______________________________________________ 42 3.3 Current and Future Land Use _________________________________________ 44 3.4 Ambient Air Quality _________________________________________________ 44 3.5 Meteorology and Climatology _________________________________________ 45 3.6 Geology and Seismology ______________________________________________ 46 3.7 Surface Water Hydrology ____________________________________________ 47 3.8 Groundwater Hydrology _____________________________________________ 47 3.9 Natural Resources ___________________________________________________ 49 3.10 Environmentally/Archaeologically Sensitive Areas ________________________ 49 Revision 3 – 7/2/2007 ii Decommissioning Plan NAWS China Lake 4.0 RADIOLOGICAL STATUS OF FACILITY ________________________________ 50 4.1 Contaminated Ranges ________________________________________________ 50 4.1.1 Aerial Surveys _____________________________________________________ 50 4.1.2 Kennedy Stands ___________________________________________________ 50 4.1.3 K-2 Gunnery Range ________________________________________________ 55 4.1.4 K-2 Gunnery Range (Berm and Area Behind Berm) _______________________ 62 4.1.5 Waste Profile Samples of K-2 Berm ____________________________________ 64 4.1.6 G-6 Range ________________________________________________________ 64 4.2 Contaminated Systems and Equipment _________________________________ 68 4.3 Subsurface Soil Contamination ________________________________________ 76 4.3.2 Kennedy Stands Area _______________________________________________ 76 4.3.3 K-2 Gunnery Range ________________________________________________ 76 4.3.4 Tower 11 Area ____________________________________________________ 76 5.0 DOSE MODELING ____________________________________________________ 76 5.1 Site Conceptual Model _______________________________________________ 76 5.1.2 Source Term ______________________________________________________ 77 5.1.3 Physical Characteristics of the Site _____________________________________ 78 5.1.4 Plausible Human Exposure Scenarios and Pathways _______________________ 79 5.2 Unrestricted Release Using Site-Specific Information (K-2 Gunnery Range (Minus Berm)-Tower 11 Area, Kennedy Stands Area) ___________________________ 81 5.2.1 RESRAD Version 6.3 Calculations ____________________________________ 81 5.2.2 Sensitivity Analysis ________________________________________________ 83 6.0 ALTERNATIVES CONSIDERED AND RATIONALE FOR CHOSEN ALTERNATIVE _____________________________________________________________ 84 6.1 Alternatives Considered ______________________________________________ 84 6.2 Rationale for Chosen Alternative ______________________________________ 85 7.0 ALARA ANALYSIS ____________________________________________________ 86 8.0 PLANNED DECOMMISSIONING ACTIVITIES ___________________________ 88 8.1 General considerations for the Planning of Decommissioning Activities ______ 88 8.2 Scope of Planned Decommissioning Activities ____________________________ 89 8.3 Kennedy Stands Target Area __________________________________________ 91 8.4 K-2 Gunnery Range _________________________________________________ 93 8.5 Tower 11 Target Area _______________________________________________ 95 8.6 Contaminated Structures _____________________________________________ 96 8.7 Contaminated Systems and Equipment _________________________________ 97 8.8 Schedules __________________________________________________________ 97 9.0 PROJECT MANAGEMENT AND ORGANIZATION ________________________ 98 Revision 3 – 7/2/2007 iii Decommissioning Plan NAWS China Lake 9.1 Decommissioning Management Organization ____________________________ 98 9.2 Decommissioning Task Management ___________________________________ 98 9.3 Decommissioning Management Positions and Qualifications _______________ 99 9.3.1 Project Manager ___________________________________________________ 99 9.3.2 Radiation Safety Manager ___________________________________________ 100 9.3.3 Health and Safety Manager __________________________________________

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    149 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us