(CSHP) DOLE-CARAGA July 2018

(CSHP) DOLE-CARAGA July 2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA July 2018 Date No. Company Name and Address Project Name Principal / Owner Approved JODEL CONSTRUCTION SUPPLY & INSTALLATION/CONSTRUCTION OF SIX(6) UNITS PROVINCE OF AGUSAN 1 July 4, MDSE/JOEL ABUNDO OMOY/PUROK CONCRETE MATERIALS RECOVERY FACILITY (MRF) OF DEL NORTE 2018 1, BABAG, BUTUAN CITY AGUSAN DEL NORTE HOSPITALS LGC TRUCKING AND PROVINCE OF AGUSAN 2 CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION July 4, CONSTRUCTION/LORETO G. DEL NORTE ALONG CULIT-PAG-AO-JAGUIMITAN PROVINCIAL ROAD 2018 CHIU/PILI DRIVE, BUTUAN CITY FLORIANE CONSTRUCTION & LGU NASIPIT, AGUSAN 3 SUPPLY/FLORENCIO D. AGOT/279 July 4, DEL NORTE CONCRETING OF ROAD LEADING TO RHU BUILDING ANNEX 1ST ST., GUINGONA 2018 SUBD.,BUTUAN CITY M. MONTESCLAROS ENT., INC/MARIA DPWH-CARAGA REGION 18ND0059: REPAIR/REHAB, ASPHALT OVERLAY ALONG 4 NORICO T. July 4, XIII BUTUAN CITY-CAGAYAN DE ORO-ILIGAN ROAD K1243+046- MONTESCLAROS/VALENCIA CITY, 2018 K1244+192,ADN, BUTUAN CITY BUKIDNON 8709 M. MONTESCLAROS ENT., INC/MARIA DPWH-CARAGA REGION 18ND0060: REPAIR/REHAB, ASPHALT OVERLAY ALONG 5 NORICO T. July 4, XIII BUTUAN CITY-CAGAYAN DE ORO-ILIGAN ROAD K1247+000- MONTESCLAROS/VALENCIA CITY, 2018 K1249+461,ADN, BUTUAN CITY BUKIDNON 8709 18ND0065: CONST/IMPROVEMENT OF ACCESS ROADS DPWH-CARAGA REGION M. MONTESCLAROS ENT., INC/MARIA LEADING TO BRGY. LINGAYAO-INTERIM BRGY. OF LAWAN- XIII 6 NORICO T. LAWAN RD IN SUPPORT OF LAS NIEVES, July 4, MONTESCLAROS/VALENCIA CITY, BUENAVISTA,NASIPIT,CARMEN (LASBUENASCAR) 2018 BUKIDNON 8709 SUSTAINABLE AGRO FORESTRY DEV'T PROJ., LAS NIEVES, ADN 18NC0048: REHAB/ REPAIR OF DAMAGED SLOPE/BANK DPWH-ADS 2ND DEO 7 ADFIL CORP./JOSEPH Q July 4, PROTECTION W/ DRAINAGE ALONG BAHAYAN RIVER GORME/DOONGAN, BUTUAN CITY 2018 UPSTREAM OF BAYAHAN BRIDGE J-R3 CONSTRUCTION & LGU-NASIPIT 8 SUPPLY/ENGR. ZOSIMO R. ROSALES, July 4, IMPROVEMENT OF MULTI PURPOSE BUILDING JR./P-18A LOWER MANDACPAN, 2018 BRGY. SAN VICENTE, BUTUAN CITY Page 1 of 26 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA July 2018 Date No. Company Name and Address Project Name Principal / Owner Approved 18NA0044: CONST./REHAB OF FLOOD MITIGATION DPWH-ADN HEXAMINDZ CORP./HENRY B. 9 FACILITIES WITH IN MAJOR RIVER BASINS AND PRINCIPAL July 4, DEO,BUTUAN CITY SABATE/PEARL ST., MARFORI RIVERS-CONST. OF RING DIKE ALONG LAKE MAINIT 2018 HEIGHTS SUBD., DAVAO CITY (BRGY. LAPAZ, SANTIAGO SECTION) RELY CONST. & SUPPLY/RENATO DPWH-SDN 2ND DEO 10 DELA ROSA CASTANEDA/KM. 7 18NG0062: ROAD WIDENING-SECONDARY ROADS DAPA July 4, TIGATTO ROAD. BUHANGIN, DAVAO JCT CANCOHOY ROAD (K0001+(-1019)-K0002+000) 2018 CITY FLORIANE CONSTRUCTION & NIA-ASDI IMO, AMBAGO 11 SUPPLY/FLORENCIO D. AGOT/279 CONSTRUCTION OF CANALIZATION AND CANAL July 4, BUTUAN CITY ANNEX 1ST ST., GUINGONA STRUCTURES, CAMPO BACUAG SURIGAO DEL NORTE 2018 SUBD.,BUTUAN CITY MAG CORP./ARTHUR R. ABAD/NO. 10 18NI0036: PACKAGE 10 -CONST. (COMPLETION) OF MULTI DPWH-SDS 2ND DEO 12 July 5, BOR, BUILDING 1 CARMEN, DAVAO PURPOSE BUILDING, RAJAH CABUNGSUAN SDS,BOGAC 2018 DEL NORTE LINGIG SDS,PALO ALTO LINGIG SDS JODEL CONSTRUCTION SUPPLY & CITY GOVERNMENT OF 13 CONSTRUCTION OF NEW HEALTH CENTER AT BRGY. July 5, MDSE/JOEL ABUNDO OMOY/PUROK BUTUAN CITY BILAY, BUTUAN CITY 2018 1, BABAG, BUTUAN CITY MAG CORP./ARTHUR R. ABAD/NO. 10 18NI0037: PACKAGE 11-CONST. (COMPLETION) OF MULTI DPWH- SDS 2ND DEO 14 July 5, BOR, BUILDING 1 CARMEN, DAVAO PURPOSE BUILDING,BATUNAN TAGBINA SDS, BRGY. 2018 DEL NORTE SORIANO TAGBINA SDS,MANAMBIA TAGBINA SDS TABADA CONST. & SUPPLIES/ NATIONAL IRRIGATION 15 CONSTRUCTION OF DIVERSION WORKS, CANALIZATION & July 5, GEMMA P. TABADA/326KM. 3 BAAN, ADMINISTRATION (NIA) TERMINAL FACILITIES OF TIDMAN CIS 2018 BUTUAN CITY C&R CONSTRUCTION & PROVINCE OF AGUSAN 16 CONSTRUCTION OF HINIMBANGAN WATER SYSTEM LEVEL July 5, SUPPLY/ANGELITO A. CONDE/291 DEL NORTE II AT KITCHARAO, AGUSAN DEL NORTE 2018 CAPITOL DRIVE, BUTUAN CITY AGUERO CONSTRUCTION/RONNIE S. 18NI0022: PACKAGE 1 - CONSTRUCTION (COMPLETION OF DPWH-SDS 2ND DEO 17 July 5, AGUERO/ P-1, BRGY. 5, SAN MULTIPURPOSE BUILDINGAT 2018 FRANCISCO, AGUSAN DEL SUR BACULIN,CAQMPA,HARIP,BIGAAN HINATUAN, SDS 18 EDANNA CONSTRUCTION/EDGAR P. REPAIR OF RC WHARF AND REPLACEMENT OF July 5, PHILIPPINE PORTS CABADING/ZONE 4 #89 BIASONG, FENDERING SYSTEM AT THE PORT OF MASAO, BRGY. 2018 AUTHORUTY Page 2 of 26 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA July 2018 Date No. Company Name and Address Project Name Principal / Owner Approved SAN ISIDRO, TALISAY CITY, CEBU LUMBOCAN, BUTUAN CITY CARTESIAN BUILDERS/REHUM S. LGU- MUNICIPALITY OF 19 LOPEZ/ 083 SAMPAGUITA ST., EXPANSION OF MUNICIPAL GYM (PHASE 2) AT BRGY. July 5, CAGDIANAO KASKAG VILLAGE, BRGY. POBLACION, CAGDIANAO, DINAGAT ISLAND 2018 WASHINGTON, SURIGAO CITY CARTESIAN BUILDERS/REHUM S. LGU- MUNICIPALITY OF CONCRETING OF NUEVA ESTRELLA FMR (BRIDGE 20 LOPEZ/ 083 SAMPAGUITA ST., July 5, CAGDIANAO APPROACH) AT BRGY. NUEVA ESTRELLA, CAGDIANAO, KASKAG VILLAGE, BRGY. 2018 DINAGAT ISLAND WASHINGTON, SURIGAO CITY 21 DATREBIL CONST. & SUPPLY/ANGEL 18NB0056: CONST. OF WATER SUPPLY SYSTEM LEVEL II, July 5, DPWH-ADS UY/ P2-A BADING, BUTUAN CITY PROSPERIDAD (PHASE I) 2018 22 DATREBIL CONST. & SUPPLY/ANGEL 18NB0025: CONST. OF WATER SYSTEM LEVEL 2, July 5, DPWH-ADS UY/ P2-A BADING, BUTUAN CITY MAGSAYSAY SIBAGAT ADS 2018 LGC TRUCKING AND PROVINCE OF AGUSAN 23 CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION July 4, CONSTRUCTION/LORETO G. DEL NORTE ALONG CULIT-PAG-AO-JAGUIMITAN PROVINCIAL ROAD 2018 CHIU/PILI DRIVE, BUTUAN CITY FLORIANE CONSTRUCTION & LGU NASIPIT, AGUSAN 24 SUPPLY/FLORENCIO D. AGOT/279 July 4, DEL NORTE CONCRETING OF ROAD LEADING TO RHU BUILDING ANNEX 1ST ST., GUINGONA 2018 SUBD.,BUTUAN CITY M. MONTESCLAROS ENT., INC/MARIA DPWH-CARAGA REGION 18ND0059: REPAIR/REHAB, ASPHALT OVERLAY ALONG 25 NORICO T. July 4, XIII BUTUAN CITY-CAGAYAN DE ORO-ILIGAN ROAD K1243+046- MONTESCLAROS/VALENCIA CITY, 2018 K1244+192,ADN, BUTUAN CITY BUKIDNON 8709 M. MONTESCLAROS ENT., INC/MARIA DPWH-CARAGA REGION 18ND0060: REPAIR/REHAB, ASPHALT OVERLAY ALONG 26 NORICO T. July 4, XIII BUTUAN CITY-CAGAYAN DE ORO-ILIGAN ROAD K1247+000- MONTESCLAROS/VALENCIA CITY, 2018 K1249+461,ADN, BUTUAN CITY BUKIDNON 8709 M. MONTESCLAROS ENT., INC/MARIA 18ND0065: CONST/IMPROVEMENT OF ACCESS ROADS DPWH-CARAGA REGION 27 NORICO T. LEADING TO BRGY. LINGAYAO-INTERIM BRGY. OF LAWAN- July 4, XIII MONTESCLAROS/VALENCIA CITY, LAWAN RD IN SUPPORT OF LAS NIEVES, 2018 BUKIDNON 8709 BUENAVISTA,NASIPIT,CARMEN (LASBUENASCAR) Page 3 of 26 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA July 2018 Date No. Company Name and Address Project Name Principal / Owner Approved SUSTAINABLE AGRO FORESTRY DEV'T PROJ., LAS NIEVES, ADN 18NC0048: REHAB/ REPAIR OF DAMAGED SLOPE/BANK DPWH-ADS 2ND DEO 28 ADFIL CORP./JOSEPH Q July 4, PROTECTION W/ DRAINAGE ALONG BAHAYAN RIVER GORME/DOONGAN, BUTUAN CITY 2018 UPSTREAM OF BAYAHAN BRIDGE J-R3 CONSTRUCTION & LGU-NASIPIT 29 SUPPLY/ENGR. ZOSIMO R. ROSALES, July 4, IMPROVEMENT OF MULTI PURPOSE BUILDING JR./P-18A LOWER MANDACPAN, 2018 BRGY. SAN VICENTE, BUTUAN CITY 18NA0044: CONST./REHAB OF FLOOD MITIGATION DPWH-ADN HEXAMINDZ CORP./HENRY B. 30 FACILITIES WITH IN MAJOR RIVER BASINS AND PRINCIPAL July 4, DEO,BUTUAN CITY SABATE/PEARL ST., MARFORI RIVERS-CONST. OF RING DIKE ALONG LAKE MAINIT 2018 HEIGHTS SUBD., DAVAO CITY (BRGY. LAPAZ, SANTIAGO SECTION) RELY CONST. & SUPPLY/RENATO DPWH-SDN 2ND DEO 31 DELA ROSA CASTANEDA/KM. 7 18NG0062: ROAD WIDENING-SECONDARY ROADS DAPA July 4, TIGATTO ROAD. BUHANGIN, DAVAO JCT CANCOHOY ROAD (K0001+(-1019)-K0002+000) 2018 CITY FLORIANE CONSTRUCTION & NIA-ASDI IMO, AMBAGO 32 SUPPLY/FLORENCIO D. AGOT/279 CONSTRUCTION OF CANALIZATION AND CANAL July 4, BUTUAN CITY ANNEX 1ST ST., GUINGONA STRUCTURES, CAMPO BACUAG SURIGAO DEL NORTE 2018 SUBD.,BUTUAN CITY MAG CORP./ARTHUR R. ABAD/NO. 10 18NI0036: PACKAGE 10 -CONST. (COMPLETION) OF MULTI DPWH-SDS 2ND DEO 33 July 4, BOR, BUILDING 1 CARMEN, DAVAO PURPOSE BUILDING, RAJAH CABUNGSUAN SDS,BOGAC 2018 DEL NORTE LINGIG SDS,PALO ALTO LINGIG SDS LGC TRUCKING AND PROVINCE OF AGUSAN 34 CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION July 4, CONSTRUCTION/LORETO G. DEL NORTE ALONG CULIT-PAG-AO-JAGUIMITAN PROVINCIAL ROAD 2018 CHIU/PILI DRIVE, BUTUAN CITY FLORIANE CONSTRUCTION & LGU NASIPIT, AGUSAN 35 SUPPLY/FLORENCIO D. AGOT/279 July 4, DEL NORTE CONCRETING OF ROAD LEADING TO RHU BUILDING ANNEX 1ST ST., GUINGONA 2018 SUBD.,BUTUAN CITY Page 4 of 26 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-CARAGA July 2018 Date No. Company Name and Address Project Name Principal / Owner Approved M. MONTESCLAROS ENT., INC/MARIA DPWH-CARAGA REGION 18ND0059: REPAIR/REHAB, ASPHALT OVERLAY ALONG 36 NORICO T. July 4, XIII BUTUAN CITY-CAGAYAN DE ORO-ILIGAN ROAD K1243+046- MONTESCLAROS/VALENCIA CITY, 2018 K1244+192,ADN, BUTUAN CITY BUKIDNON 8709 M. MONTESCLAROS ENT., INC/MARIA DPWH-CARAGA REGION 18ND0060: REPAIR/REHAB, ASPHALT OVERLAY ALONG 37 NORICO T. July 4, XIII BUTUAN CITY-CAGAYAN DE ORO-ILIGAN ROAD K1247+000- MONTESCLAROS/VALENCIA CITY, 2018 K1249+461,ADN, BUTUAN CITY BUKIDNON 8709 18ND0065: CONST/IMPROVEMENT OF ACCESS ROADS DPWH-CARAGA REGION M. MONTESCLAROS ENT., INC/MARIA LEADING TO BRGY. LINGAYAO-INTERIM BRGY. OF LAWAN- XIII 38 NORICO T. LAWAN RD IN SUPPORT OF LAS NIEVES, July 4, MONTESCLAROS/VALENCIA CITY, BUENAVISTA,NASIPIT,CARMEN (LASBUENASCAR) 2018 BUKIDNON 8709 SUSTAINABLE AGRO FORESTRY DEV'T PROJ., LAS NIEVES, ADN 18NC0048: REHAB/ REPAIR OF DAMAGED SLOPE/BANK DPWH-ADS 2ND DEO 39 ADFIL CORP./JOSEPH Q July 4, PROTECTION W/ DRAINAGE ALONG BAHAYAN RIVER GORME/DOONGAN, BUTUAN CITY 2018 UPSTREAM OF BAYAHAN BRIDGE J-R3 CONSTRUCTION & LGU-NASIPIT 40 SUPPLY/ENGR. ZOSIMO R. ROSALES, July 4, IMPROVEMENT OF MULTI PURPOSE BUILDING JR./P-18A LOWER MANDACPAN, 2018 BRGY.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    26 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us