World Bank Document

World Bank Document

Country/Organisation:GHANA Procurement Plan-Goods Draft Bid Project/Programme: STWSSP If Post-Review, No-objection Dates are not needed Documents, Spec Proc Notice Loan #:3791-GH BASIC DATA Bidding Period Advert Prep & On-line UNDB Package Lot Estimated Procurement Pre-or Post Prior or Post Plan vs. No-objection Bid Invitation Bid Closing- Description* Submission Gateway Number Number Amount in US $ Method Qualification Review Actual Date Date Opening by Ex Agency Nat Press Norm Duration of Proc Steps If Prequalification Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks add 7-13 wks Actual List of Contracts HEAD OFFICE Public Disclosure Authorized Public Disclosure Authorized Vehicle for Head Office 2 1 33,000.00 IAPSO Post Prior Plan 15/03/08 30//03/08 N/A 04/04/08 20/05/06 Actual Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 554900PROP0p081nt0Plan01March091009.xls 1 of 20 07/05/2010 1:50 AM Public Disclosure Authorized Public Disclosure Authorized Country/Organisation:GHANA Procurement Plan-Goods Project/Programme: STWSSP Loan #:3791-GH Bid Evaluation Contract Finalization Contract Implementation Date Date Opening Arrival Inspection Submission No-objection Plan vs. Contract Amount Description* Contract Contract of of Final Bid Eval Rpt Date Actual in US$’000 Award Signature Let of Credit Goods Acceptance Norm Duration of Proc Steps 1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks Actual List of Contracts HEAD OFFICE Vehicle for Head Office N/A N/A Plan Actual 554900PROP0p081nt0Plan01March091009.xls 2 of 20 07/05/2010 1:50 AM Dates of Bank Approval of Procurement Plan For Goods Initial Approval Update Country/Organisation:GHAHA Pro Project/Programme: STWSSP If Post-Review, No-objection Dates are not needed Draft Bid Documents, including Spec Proc Procurement Plan - Works Loan #:3791-GH Basic Data specs and quantities, draft SPN Notice Bidding Period Bid Evaluation Advert Lumpsum or Prep & On-line UNDB Package Lot Procurement Estimated Amount in Pre-or Post Prior or Post No-objection Bid Invitation Bid Closing- Submission No-objection Description* Bill of Plan vs. Actual Submission Gateway Number Number Method US $ Qualification Review Date Date Opening Bid Eval Rpt Date Quantities by Ex Agency Nat Press If Prequalification Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks Norm Duration of Proc Steps add 7-13 wks Actual List of Contracts ASHANTI REGION Akwasiase Maaban Small Towns Water 1 1 BOQ NCB 450,000.00 Post Post Plan 28/02/08 07/03/08 12/03/08 21/03/08 02/05/08 19/05/08 02/06/08 Supply - Ahafo Ano North District Perior Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Jacobu Small Towns Water Supply -Amansie 1 1 BOQ NCB 350,000.00 Post Post Plan 28/02/08 07/03/08 12/03/08 21/03/08 02/05/08 19/05/08 02/06/08 Central District Perior Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 9 1 BOQ NCB 55,000.00 Post Post Plan 31-03-06 11/04/06 N/A 25-04-06 23-05-06 13/06/06 27/06/06 Institutinal Latrines Construction Actual 7 Jan. 2008 12 Feb. 2008 25 Feb. 2008 N/A N/A Lumpsum N/A 30,000.00 N/A N/A Plan N/A N/A N/A N/A N/A N/A N/A House Hold Latrines Construction Actual BRONG AHAFO REGION 1 1 BOQ NCB 1,032,609.00 Post Prior Plan N/A N/A 14/04/08 18/04/08 16/05/08 13/06/08 20/06/08 Wenchi Small Towns Water Supply Projecct Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Techiman Small Towns Water Supply 1 1 BOQ NCB 652,174.00 Post Prior Plan N/A N/A 14/04/08 18/04/08 16/05/08 13/06/08 20/06/08 Construction Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Jaman North Small Towns Water Supply 2 1 BOQ NCB 652,174.00 Post Prior N/A N/A 14/04/08 18/04/08 16/05/08 13/06/08 20/06/08 Construction Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Jaman South Small TownsWater Supply 2 1 BOQ NCB 652,174.00 Post Prior Plan N/A N/A 14/04/08 18/04/08 16/05/08 13/06/08 20/06/08 Construction Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Construction of 55 No. Institutinal Latrines in 8 BOQ NCB 598,000.00 Post Prior Plan 01/11/07 08/11/07 21/01/08 04/02/08 03/03/08 17/03/08 31/03/08 districts Actual 02-Nov, 2007 18-Dec,2007 N/A 28-Jan,2008 13 March 2008 22 April 2008 14 May 2008 Construction of 550 No. Household Latrines in Plan 8 districts Actual CENTRAL REGION Twifo Mokwa Water System in Twifo Heman 1 1 BOQ NCB 400,000.00 Post Prior Plan 03-March. 2008 17-March. 2008 N/A 07 April 2009 08 May 2009 15 May 2009 29 May 2009 Lower Denkyira District Actual 16 April 2008 23 April 2008 Mfoum and Jukwa Krobo Water Systems in 2 1 BOQ NCB 300,000.00 Post Prior Plan 03-March. 2008 17-March. 2008 N/A 31-March 2008 12-May 2008 09-June 2008 16-June 2008 Twifo Heman Lower District Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Denkyira Asikuma Water System in Upper 3 1 BOQ NCB 300,000.00 Post Prior Plan 03-March. 2008 17-March. 2008 N/A 07 April 2009 08 May 2009 15 May 2009 29 May 2009 Denkyira District Actual 16 April 2008 23 April 2008 Ayanfuri Water System in Upper Denkyira 4 1 BOQ NCB 500,000.00 Post Prior Plan 03-March. 2008 17-March. 2008 N/A 31-March 2008 12-May 2008 09-June 2008 16-June 2008 District Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Jameso Nkwanta & Diaso Water Systems in 4 2 BOQ NCB 200,000.00 Post Prior Plan 03-March. 2008 17-March. 2008 N/A 31-March 2008 12-May 2008 09-June 2008 16-June 2008 Upper Denkyira District Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Nsuam/Kyekyewere Water System in Assin 5 1 BOQ NCB 600,000.00 Post Prior Plan 03-March. 2008 17-March. 2008 N/A 31-March 2008 12-May 2008 09-June 2008 16-June 2008 South District Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Asamankese/Achiase and Assin 5 2 BOQ NCB 450,000.00 Post Prior Plan 03-March. 2008 17-March. 2008 N/A 31-March 2008 12 May 2008 09-June 2008 16-June 2008 Adubiase/Habitat Water Systems in Assin Actual 16 April 2008 23 April 2008 N/A 19 May 2008 18 June 2008 24 Sept 2008 9 October 2008 Construction of 5 No.Institutional 6 1 BOQ NCB 42,500.00 Post Post Plan 03-March. 2008 N/A N/A 31-March 2008 28-April 2008 N/A N/A KVIP latrines in Assin South District Post Post Actual 02-Nov, 2007 18-Dec,2007 N/A 28-Jan,2008 26-Feb,2008 09-June,2008 14-June,2008 6 2 NCB 42,500.00 Post Post Plan 03-March. 2008 N/A N/A 31-March 2008 28-April 2008 N/A N/A 5 No. KVIP Institutional latrines in Assin South 02-Nov, 2007 18-Dec,2007 28-Jan,2008 26-Feb,2008 09-June,2008 14-June,2008 District Actual NCB 6 3 BOQ 42,500.00 Post Post Plan 03-March. 2008 N/A N/A 31-March 2008 28-April 2008 N/A N/A 5 No. KVIP Institutional latrines in Assin South District NCB Actual Construction of 5 No.Institutional KVIP 7 1 BOQ NCB 42,500.00 Post Post Plan 03-March. 2008 N/A N/A 31-March 2008 28-April 2008 N/A N/A latrines in Upper Denkyira District Actual Construction of 5 8 1 BOQ NCB 42,500.00 Post Post Plan 03-March. 2008 N/A N/A 31-March 2008 28-April 2008 N/A N/A No.Institutional KVIP latrines in Twifo Heman Actual Construction of 5 9 1 BOQ NCB 42,500.00 Post Post Plan 03-March. 2008 N/A N/A 31-March 2008 28-April 2008 N/A N/A No.Institutional KVIP latrines in Asikuma Actual ConstructionConsolidated of 5 No.Institutional Procurement KVIP Plan - Updated10 July 2007 1 BOQ NCB 42,500.00 Post 5 ofPost 20 Plan 03-March.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us