East Bank Flood Resilience Program

East Bank Flood Resilience Program

East Bank Flood Resilience Program Artist impression of the new vehicle bridge Improving flood resilience Improving flood resilience for our customers and the community Flood Risk A new traffic bridge Seqwater’s East Bank Flood Resilience Program (EBFRP) involves Constructed in 1927, the Mount Crosby Weir was designed a number of improvements to reduce flood risks to critical bulk to provide a pumping pool for the East Bank Water Treatment water infrastructure at the historical East BankPump Station in Plant (WTP). The existing bridge was constructed on top of the Mount Crosby. weir, allowing coal to be transported across the Brisbane River to the nearby pump station. Today, the bridge over the weir is The Mount Crosby Water Treatment Plants are a critical part of open to traffic and locals who regularly use it to access the the South East Queensland (SEQ) Water Grid and supply about sporting fields on the other side of the river. The bridge is also 50 per cent of South East Queensland’s drinking water. critical to Seqwater operations and provides a link between the Seqwater has developed a Master Plan for the East Bank Pump West Bank WTP and East Bank WTP. Station site to improve flood resilience and protect South East In 2015, Seqwater introduced a weight limit on the weir bridge Queensland’s water supply. as a safety precaution following engineering assessments of The Master Plan includes: the structure. Several options to address the safety issues have been assessed including building a new bridge. • Constructing a new vehicle bridge over the Brisbane River The Master Plan has been updated to include a new vehicle • Constructing a new substation and high voltage switch bridge over the Brisbane River. The existing weir bridge will be room on higher ground to power the pumps repurposed for pedestrians and cyclists, increasing connectivity and improving safety in the Mount Crosby area. The new vehicle bridge will provide greater flood resilience than the existing weir bridge and allow access for heavy vehicles, such as school buses. Contact us For more information about the East Bank Flood Resilience Program, contact 1800 771 497 or email [email protected]..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us