ENGINEERING WING STATUS of WORKS Date of Estimate No & Date of Sl

ENGINEERING WING STATUS of WORKS Date of Estimate No & Date of Sl

ENGINEERING WING STATUS OF WORKS Date of Estimate No & Date of Sl. Agreement completion Details of the project amount agreement & Remarks No Amount as per (Rs.lakhs) Agency Agreement DIVISION-I IN PROGRESS WORKS Construction of Commercial M/s. Sundeep 1 Complex at Ramnagar Site - I & 1350.00 1035.74 Ravindra 25.02.2021 Work is in progress II, Visakhapatnam TOTAL 1350.00 DIVISION-II WORKS TO BE TAKEN UP .Letter addressed to Govt., for permission to conlude MoU with Development of Natural History APNHPM Trust. Govt 1 Park and Museum Research 5700.00 Orders are awaited. Institute at Visakhapatnam 2.Estate wing has been persuing take over land from the District Revenue Authorities TOTAL 5700.00 DIVISION-III IN PROGRESS WORKS Development of Sea Harrier Laying of plinth beams Museum Building at Beach road, and ground floor M/s. KPR 1 Visakhapatnam as a part of 750.00 506.40 23.08.2021 columns completed. Constructions Integrated Museum and Tourism Preparing for laying Complex Project, Phase-I beams and slab WORKS TO BE TAKEN UP Annual operational maintenance of TU-142 Aircraft Museum for the Tenders opened and 2 65.58 - - period from 01.04.2021 to circulated for approval 31.03.2022 Multi Level Car Parking & Jungle clearance and 3 Commercial Complex at Siripuran 8000.00 M/s. Vijay Nirman 31.12.2022 soil testing work is in Junction, Visakhapatnam Company Limited progress TOTAL 8815.58 DIVISION-IV IN PROGRESS WORKS Annual Maintenance (Civil) of VMRDA office located in U.B. Complex A, B & C blocks including power room building, M/s K.Prasadu & 1 56.24 43.82 30.09.2021 Work is under progress Gurajada Kalakshetram, Mini Zoo Co and Metropolitan Commissioner's Camp office at Pandurangapuram. Providing Maintenance of VMRDA Shopping Complexes at M/s K.Prasadu & 2 Seethammadhara & MVP Colony, 13.60 7.57 31.03.2022 Work is under progress Co Sector-VII, Suited in Visakhapatnam. TOTAL 69.84 Date of Estimate No & Date of Sl. Agreement completion Details of the project amount agreement & Remarks No Amount as per (Rs.lakhs) Agency Agreement DIVISION-V WORKS TO BE TAKEN UP Providing 60'-0'' Wide Master Plan Road at Chukkavankipalem 1 (RH Colony) to NH -16 at 900.00 RDP under preparation (Nathayyapalem Junction), Visakhapatnam Formation of embankment with Quarry Rubbish, B.T. Roads, Construction of Cross Drainage Works & Storm Water Drains, Kerb Walls for Central Median for Land acquistion is 2 2713.00 100'-0" wide PCPIR, Road under progress. Connecting from Appannapalem Jn. To Pudimadaka Cross Road (Via) near Atchutapuram, Visakhapatnam, Reach-I,II & III (0 mtrs to 4750mtrs) Improvement of Atchutapuram Rs.7.66 Cr deposited to 3 Junction (Gajuwaka Pudimadaka 1521.00 R&B Dept for land – Yelamanchili (GPY) SH -97 acquisition TOTAL 5134.00 DIVISION-VI IN PROGRESS WORKS Construction of Dormitory Children cum speical and Sri. G.Trinadha 1 observation Home for Girls 62.00 40.46 09--08-2021 Work is in progress Rao (Juvenile Home) at Visakhapatnam WORKS TO BE TAKEN UP Construction of Minor Bridge at 1 Km 22/832 near SOS at Bheemili 280.00 Tenders invited Beach Road at Visakhapatnam Formation of Master Plan Road 2 connecting NH-16 to Revenue 555.00 Tenders invited Nagar Road, Visakhapatnam TOTAL 897.00 DIVISION-VIII IN PROGRESS WORKS Detailed Investigation, Survey, Design, Engineering and Construction of a Composite 1 Level Grade Separators with 15000.00 11361.00 M/s. Vijay Nirman 30.09.2021 Work is in progress Architectural finishing, Aesthetics, Company Limited Service Roads etc., at Naval Armament Depot (NAD) Junction Restoration and Redevelopment M/s. KMV 2 of 380 Acres of Kailasagiri hill Top 5655.00 6193.00 12.07.2021 Work is in progress Project Ltd. Park, Visakhapatnam. TOTAL 20655.00 Date of Estimate No & Date of Sl. Agreement completion Details of the project amount agreement & Remarks No Amount as per (Rs.lakhs) Agency Agreement DIVISION-IX WORKS TO BE TAKEN UP 1. Project Planning (Architectural & Structural Designs), Development , Engineering procurement and Project Implementaiton Management Services was entrusted to APUIAML 2.Detailed Review Meetings held on Development of Planetarium at 11.02.2021 and 1 Kailasa Hill Park, Visakhapatnam 3700.00 18.02.2021 on the by VMRDA finalization of specification by the consultant and Architect. 3.Consultants yet to furnsih the BoQ & Drawings 4.APUIAML Engineers have discussed with set of Drawings, however complete detailing is yet to be done by the consultant. TOTAL 3700.00 GRAND TOTAL 46321.42.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us