Hydrology and Flood Risk

Hydrology and Flood Risk

Hornsea Project Four: Preliminary Environmental Information Report (PEIR) Volume 3, Chapter 2 : Hydrology and Flood Risk Prepared Royal HaskoningDHV, 26 July 2019 Checked Royal HaskoningDHV, 29 July 2019 Accepted Ant Sahota, Ørsted, 30 July 2019 Approved Julian Carolan, Ørsted, 31 July 2019 Doc. No.: A3.2 Version A Table of Contents 2.1 Introduction ................................................................................................. 7 2.2 Purpose ......................................................................................................... 7 2.3 Planning and Policy Context ................................................................... 8 2.4 Consultation .............................................................................................. 13 2.5 Study area .................................................................................................. 20 2.6 Methodology to inform baseline .......................................................... 22 2.7 Baseline environment ............................................................................. 23 2.8 Project basis for assessment ................................................................. 43 2.9 Maximum Design Scenario ..................................................................... 53 2.10 Assessment methodology ..................................................................... 56 2.11 Impact assessment .................................................................................. 61 2.12 Cumulative effect assessment (CEA) .................................................. 73 2.13 Transboundary effects ........................................................................... 80 2.14 Inter-related effects ................................................................................ 80 2.15 Conclusion and summary ....................................................................... 81 2.16 References ................................................................................................. 83 Doc. No.: A3.2 Version A Page 1/84 List of Tables Table 2.1: Summary of NPS EN-1 and EN-3 policy on relevant assessment considerations for Hydrology and Flood Risk. ........................................................................................................................................8 Table 2.2: Summary of NPS EN-1 and EN-3 policy on decision making relevant to Hydrology and Flood Risk. ......................................................................................................................................................................9 Table 2.3: Consultation Responses. .................................................................................................................... 13 Table 2.4: Key Sources of Hydrology and Flood Risk Data. .......................................................................... 22 Table 2.5: Summary of site-specific survey data. ............................................................................................ 23 Table 2.6: Surface watercourses within the Hornsea Four hydrology and flood risk study area (see Figure 2.2 – 2.6). ........................................................................................................................................................ 25 Table 2.7 Geomorphological characteristics of surface water bodies which intersect with the Hornsea Four hydrology and flood risk study area. ......................................................................................... 35 Table 2.8: Water quality characteristics of surface water bodies within the Hornsea Four hydrology and flood risk study area. ....................................................................................................................................... 37 Table 2.9: Hydrology and flood risk impact register. ..................................................................................... 44 Table 2.10: Relevant hydrology and flood risk Commitments. ................................................................... 50 Table 2.11: Maximum design scenario for impacts on hydrology and flood risk. .................................... 55 Table 2.12: Definition of terms relating to receptor sensitivity. .................................................................. 57 Table 2.13: Definition of terms relating to magnitude of an impact. ......................................................... 59 Table 2.14: Matrix used for the assessment of the significance of the effect. ......................................... 61 Table 2.15: Definition of impact magnitude resulting from access track watercourse crossings. ..... 68 Table 2.16: Magnitude of impact resulting from haul road watercourse crossings. .............................. 69 Table 2.17: Sensitivity of receptors crossed by the access track. ............................................................... 69 Table 2.18: Significance of Effects on EA Main Rivers and IDB Maintained Drainage Channels. ......... 71 Table 2.19: Stages and activities involved in the CEA process. ................................................................... 74 Table 2.20: Potential Cumulative Effects. ......................................................................................................... 76 Table 2.21: Project Screening for CEA Hydrology and Flood Risk............................................................... 77 Table 2.22: Inter-related effects assessment for Hydrology and Flood Risk. .......................................... 80 Table 2.23: Summary of potential impacts assessed for Hydrology and Flood Risk. ............................ 82 List of Figures Figure 2.1: Study area, based on WFD water body catchments (Not to Scale). ...................................... 21 Figure 2.2: Surface water drainage features (Not to Scale). ......................................................................... 28 Figure 2.3: Surface water drainage features (continued) (Not to Scale). ................................................... 29 Figure 2.4: Surface water drainage features (continued) (Not to Scale). ................................................... 30 Figure 2.5: Surface water drainage features (continued) (Not to Scale). ................................................... 31 Figure 2.6: Surface water drainage features (continued) (Not to Scale). ................................................... 32 Figure 2.7: Surface water drainage features (continued) (Not to Scale). ................................................... 33 Figure 2.8: Surface water drainage features (continued) (Not to Scale). ................................................... 34 Figure 2.9: Designated Sites within the Onshore Study Area (Not to Scale). ............................................ 41 Figure 2.10: Watercourses crossed by temporary haul road crossings (Not to Scale). .......................... 63 Doc. No.: A3.2 Version A Page 2/84 Figure 2.11: Watercourses crossed by temporary haul road crossings (continued) (Not to Scale). .... 64 Figure 2.12: Watercourses crossed by temporary haul road crossings (continued) (Not to Scale). .... 65 Figure 2.13: Watercourses crossed by temporary haul road crossings (continued) (Not to Scale) ..... 66 Figure 2.14: Watercourses crossed by temporary haul road crossings (continued) (Not to Scale). .... 67 Annexes Annex Heading 2.1 Geomorphological Baseline Survey Report 2.2 Onshore Infrastructure Flood Risk Assessment 2.3 Water Framework Directive Compliance Assessment Doc. No.: A3.2 Version A Page 3/84 Glossary Term Definition Code of Construction A document detailing the overarching principles of construction, contractor Practice (CoCP) protocols, construction-related environmental management measures, pollution prevention measures, the selection of appropriate construction techniques and monitoring processes Commitment A term used interchangeably with mitigation. Commitments are Embedded Mitigation Measures. Commitments are either Primary (Design) or Tertiary (Inherent) and embedded within the assessment at the relevant point in the EIA (e.g. at Scoping or PEIR). The purpose of Commitments is to reduce and/or eliminate Likely Significant Effects (LSE's) in EIA terms. Cumulative effects The combined effect of Hornsea Project Four in combination with the effects from a number of different projects, on the same single receptor/resource. Cumulative impact Impacts that result from changes caused by other past, present or reasonably foreseeable actions together with Hornsea Project Four. Design Envelope A description of the range of possible elements that make up the Hornsea Project Four design options under consideration, as set out in detail in the project description. This envelope is used to define Hornsea Project Four for Environmental Impact Assessment (EIA) purposes when the exact engineering parameters are not yet known. This is also often referred to as the “Rochdale Envelope” approach. Development Consent An order made under the Planning Act 2008 granting development consent Order (DCO) for one or more Nationally Significant Infrastructure Projects (NSIP). Effect Term used to express the consequence of an impact. The significance of an effect is determined by correlating the magnitude of the impact with the importance, or sensitivity, of the receptor or resource in accordance with defined significance criteria. EIA Regulations The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the ‘EIA Regulations’).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    85 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us