Metra Construction Program

Metra Construction Program

UP-N ILLINOIS / WISCONSIN STATE LINE McHENRY NCS LAKE UP-NW MD-N 56 37 59 19 68 69 17 16 25 36 LAKE 28 18 MICHIGAN COOK 15 MD-W 74 14 73 40 29 65 35 72 13 42 DU PAGE 63 41 12 UP-W 70 71 11 60 64 Downtown 55 CHICAGO 53 39 38 53 20 52 54 51 27 26 67 57 48 49 50 30 1 66 58 84 33 2 32 3 BNSF 77 76 4 31 62 21 43 5 22 44 WILL 34 6 75 61 61 SS 78 7 79 8 80 9 45 HC 82 Metra 24 23 Construction 83 RI 81 Program 46 ME 10 ILLINOIS / INDIANA STATE LINE 2018 47 SWS 2018Metra Construction Program STATIONS CROSSING REPLACEMENTS BRIDGES Metra Electric Metra Electric/South Chicago Branch UP North 1 63rd Street – warming shelter 31 90th Street, Chicago 63 Chicago – continuation of multiyear 2 75th Street – warming shelter 32 73rd Street, Chicago project to replace 11 bridges from Grace to Balmoral avenues and the inbound 3 83rd Street – warming shelter 33 Dorchester Avenue, Chicago portion of the Ravenswood Station 4 87th Street – warming shelter Metra Electric/Blue Island Branch 64 Chicago – replace the bridges over Webster Avenue and the North Branch 5 91st Street – warming shelter 34 Perry Avenue, Chicago of the Chicago River 6 103rd Street – warming shelter Milwaukee District North 7 Riverdale – painting and repairs Milwaukee District West 35 Devon Avenue, Chicago 65 Elgin – continuation of multi-year project 8 147th Street – painting and repairs 36 St. Mary’s Road, Libertyville to replace bridge over the Fox River 9 Hazel Crest – continuation of station 37 Route 120, Grayslake renovation project started in 2017 Metra Electric 38 Racine Avenue, Chicago 10 University Park – painting and repairs 66 Chicago – rehab of bridges at 63rd and Milwaukee District West 64th Streets Milwaukee District North 39 Narragansett Avenue, Chicago 11 Healy – finishing station rehab SIGNAL/COMMUNICATIONS started in 2017 40 Raymond Street, Elgin Metra Electric 12 Grayland – finishing parking work 41 73rd Avenue, Elmwood Park started in 2017 67 Chicago – complete upgrade of signal 42 Medinah Road, Medinah 13 Mayfair – platform lighting system for the interlocking at 11th Place Rock Island 14 Golf – paint station building exterior Milwaukee District North 43 95th Street, Rock Island main line in 15 North Glenview – platform replacement, Chicago (pending funding) 68 Libertyville to Fox Lake – install new ADA improvements signal system to support 44 107th Street, on the Rock Island main 16 Libertyville – $1.1 million station rehab line in Chicago 69 Rondout – renew interlocker overseen by the village, projected late 2018 start 45 Oak Park Avenue, Tinley Park Milwaukee District West 17 Prairie Crossing – new station house SouthWest Service 70 Franklin Park – renew interlocking at Edginton Street 46 Joliet Highway, New Lenox North Central Service 71 Franklin Park – modify B-12 interlocking 47 North Street, Manhattan 18 Vernon Hills – platform replacement, to accommodate new signal systems as ADA improvements BNSF part of the CREATE B-1 project 19 Washington Street/Grayslake – 72 Elgin – install new interlocking and 48 Forest Avenue, Downers Grove platform replacement, ADA improvements upgrade circuitry at seven crossings in 49 Main Street, Downers Grove Elgin as part of the Z-100 bridge project Rock Island 50 Prairie Avenue, Brookfield 73 Elgin – renew interlocking 20 LaSalle Street – concourse replacement UP West 74 Big Timber Road – renew interlocking 21 95th Street – install visual information signs 51 First Avenue, Maywood Rock Island 22 111th Street/ Morgan Park – platform replacement, ADA improvements 75 Chicago – upgrade signal system and TRACK PROJECTS crossing circuitry on the Beverly Branch 23 Hickory Creek – platform replacement, ADA improvements UP 76 Chicago – upgrade interlocking at Gresham New Lenox – move old station 77 Chicago – upgrade interlocking at Brainerd 24 52 Lake Street – replace rail on curve building to new site and replace 78 Blue Island – install new control point at UP West with a temporary facility UP North Vermont Street in Blue Island 53 Third Main Project – two separate multiyear UP North 79 Robbins – install new control point projects to add eight miles of third track, 25 Lake Bluff – station rehab, work started in 2017 80 Robbins – upgrade crossing circuitry at construction ongoing 139th Street 54 Chicago to West Chicago – replace 43,000 ties UP West 81 Mokena – renew control point at interlocking 55 West Chicago – replace rail on curve 26 Kedzie – platform replacement 82 New Lenox – renew control point at UP Northwest interlocking 27 River Forest – platform replacement 56 Harvard Station – replace rail on curve UP Northwest 83 Joliet – renew control points at three south of the station interlockings UP Northwest BNSF SouthWest Service 28 Cary – platform and station rebuild 57 Downers Grove to Aurora – track resurfacing 84 Chicago – complete upgrade of signal 29 Cumberland – station renovation 58 Hinsdale to Aurora – replace 12,000 ties system at 74th Street interlocking BNSF Milwaukee District North 30 Western Springs – complete platform replacement started in 2017 59 Fox Lake to Libertyville – replace 17,000 ties and six switches 60 Chicago – replace ties on 11 bridges Metra Electric 61 South Chicago and Blue Island Branch Lines – replace 10,000 ties Rock Island 62 Beverly Branch Line – replace 10,000 ties .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us