Bowling Green Month Year

Bowling Green Month Year

Bowling Green Month Year Commissioner Janette Sadik-Khan, New York City Department of Transportation Presented by the Pedestrian Projects Group, May 2, 2012 to Community Board 1 Project Area • Whitehall Street: Charging Bull south to Pearl Street • State Street: Broadway south to Whitehall Street Whitehall St Whitehall 2010 Water-Whitehall Improvements 2 Pedestrian Generators Bull Sculpture Bowling Green Battery Park Subway Access Whitehall St Whitehall National Museum of the American Indian/ Customs House / Courts 3 Staten Island Ferry Pedestrian Issues Lack of pedestrian access to Bull sculpture Pedestrians walking in the street: 160 - AM peak hour April 25, 4 220 - PM peak hour 2012 Pedestrian Issues Long crosswalks Crowded sidewalks Stone St Pedestrians north of Stone Street walking in the street: 290 - AM peak hour April 25, 5 390 - PM peak hour 2012 Rapid Response Toolkit • Pavement markings • Signal timing • New signage • Painted and/or textured surfaces • Flexible delineators Forsyth St Allen St 6 Rapid Response Toolkit Painted Sidewalk Extension Examples Canal Street at E. Broadway Lower East Side 7 Schermerhorn Street, Brooklyn Proposal 8 Whitehall Street Plan 9 99 Whitehall Street Plan Provides relief to over-crowded sidewalks Shortens crosswalks existing Extends 2010 improvements north 1 10 0 Existing + Proposed Existing Proposed 11 Bowling Green/Broadway Plan New pedestrian space connects to crosswalk “Painted” sidewalk to bring people south next to fence + curb 12 Proposal 13 Existing + Proposed State Street Improves traffic alignment around standing buses on west curb Clarifies travel lanes from State St to Water St 14 Process Reviewed by: • MTA/NYCT • Parks Department • Homeland Security • NYPD Traffic and Counterterrorism • FDNY Contacted adjacent property managers and owners Maintenance Partner: • Outreach to Community Board 1: May • Downtown Alliance • Duration approximately 2 weeks • Implemendation date: To be determined 15 Summary 1. Improve pedestrian environment around Charging Bull 2. Widen sidewalks on Whitehall St between Pearl St and Morris St with color coating 3. Line roadbed “sidewalk” with flexible delineators and planters 4. Shorten crosswalks on Whitehall St 5. Restripe State St 16 Thank nyc.gov/dot You .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us