Download the Full Ford Dagenham Case Study

Download the Full Ford Dagenham Case Study

client | Ford Motor Company “The engine plant project presented the Royal HaskoningDHV team with a number of challenges ...” Driving forward Ford’s centre of excellence Ford’s Dagenham Engine Plant stands on the site of A critical survey of the existing roof steelwork was the company’s original factory which was purpose- performed to establish the strength capacity and built on marshland in 1928 and dubbed ‘The Detroit condition of the roof members. The roof structure itself of Europe’, producing its first vehicle in October 1931. accommodates the air conditioning, coolant, compressed air, fire and electrical services. Adjacent to the Engine Plant is the 30,000 m2 Dagenham Diesel Centre, Ford’s ultra-modern facility for diesel engine A major feature of the assembly hall is the use of extensive manufacturing in the UK. This new plant is one of the most ‘clean room’ technology, with a state-of-the-art air 00104-cs-mac-mo-rhdhv-0613-gb-v01-cwa advanced in Europe. induction and extraction system to minimise the amount of airborne dust particles that could severely hamper the The Diesel Centre project, led by the SDC Contractor Group production of the latest generation of sophisticated, hi- and designed by architects Austin-Smith-Lord, occupies in tech diesel engines that Ford produces for customers such part, a previously undeveloped 10,000 m2 part of the site. It as Jaguar, Land Rover and Peugeot. consists of the engine assembly plant along with a three- storey design office. Royal Haskoning was asked to provide The engine plant project presented the Royal HaskoningDHV civil and structural engineering as well as CDM expertise. team with a number of challenges, including working around existing structures, accommodating the exacting The initial phases of the project involved the part tolerances of a clean room environment and completing the demolition of existing buildings on a contaminated project within a 18 month design and build timescale. brownfield site, prior to refurbishment and construction of the new plant and offices. Peter Mills T: +44 (0) 1733 336104 E: [email protected] royalhaskoningdhv.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us