Riverwalk Residential Development Project Draft Environmental Impact

Riverwalk Residential Development Project Draft Environmental Impact

City of Long Beach Riverwalk Residential Development Project Draft Environmental Impact Report SCH # 2014091011 May 2015 DRAFT ENVIRONMENTAL IMPACT REPORT RIVERWALK RESIDENTIAL DEVELOPMENT PROJECT Prepared by: City of Long Beach Development Services 333 W. Ocean Boulevard, 5th Floor Long Beach, California 90802 Contact: Mr. Craig Chalfant (562) 570-6368 Prepared with the assistance of: Rincon Consultants, Inc. 180 North Ashwood Avenue Ventura, California 93003 (805) 644-4455 May 2015 This report prepared on 50% recycled paper with 50% post-consumer content. Riverwalk Residential Development Project EIR Table of Contents Riverwalk Residential Development Project EIR Table of Contents Page Executive Summary ............................................................................................................................. ES-1 1.0 Introduction 1.1 Environmental Impact Report Background ................................................................. 1-1 1.2 Lead, Responsible and Trustee Agencies...................................................................... 1-2 1.3 Purpose and Legal Authority ......................................................................................... 1-3 1.4 Scope and Content/Environmental Factors Potentially Affected ............................. 1-3 1.5 Environmental Review Process ...................................................................................... 1-4 2.0 Project Description 2.1 Project Applicant .............................................................................................................. 2-1 2.2 Project Location ................................................................................................................ 2-1 2.3 Current Land Use and Regulatory Setting ................................................................... 2-1 2.4 Project Characteristics.................................................................................................... 2-11 2.5 Project Objectives ........................................................................................................... 2-16 2.6 Required Approvals ....................................................................................................... 2-16 3.0 Environmental Setting 3.1 Regional Setting ................................................................................................................ 3-1 3.2 Project Site Setting ............................................................................................................ 3-1 3.3 Cumulative Projects Setting ............................................................................................ 3-2 4.0 Environmental Impact Analysis .................................................................................................... 4-1 4.1 Aesthetics ....................................................................................................................... 4.1-1 4.2 Air Quality ..................................................................................................................... 4.2-1 4.3 Biological Resources ..................................................................................................... 4.3-1 4.4 Cultural Resources ........................................................................................................ 4.4-1 4.5 Geology and Soils .......................................................................................................... 4.5-1 4.6 Greenhouse Gas Emissions .......................................................................................... 4.6-1 4.7 Hazards and Hazardous Materials ............................................................................. 4.7-1 4.8 Hydrology and Water Quality .................................................................................... 4.8-1 4.9 Land Use and Planning ................................................................................................ 4.9-1 4.10 Noise ............................................................................................................................. 4.10-1 4.11 Population and Housing ............................................................................................ 4.11-1 4.12 Public Services and Recreation .................................................................................. 4.12-1 4.13 Transportation and Traffic ......................................................................................... 4.13-1 4.14 Utilities and Service Systems ..................................................................................... 4.14-1 5.0 Other CEQA-Required Discussions .............................................................................................. 5-1 5.1 Growth Inducement ......................................................................................................... 5-1 5.2 Irreversible Environmental Effects ................................................................................ 5-2 5.3 Energy Effects ................................................................................................................... 5-3 City of Long Beach i Riverwalk Residential Development Project EIR Table of Contents 6.0 Alternatives ....................................................................................................................................... 6-1 6.1 No Project .......................................................................................................................... 6-2 6.2 Reduced Density Alternative ......................................................................................... 6-5 6.3 Alternative Site Alternative .......................................................................................... 6-10 6.4 Revised Access Alternative ........................................................................................... 6-16 6.5 Environmentally Superior Alternative........................................................................ 6-21 7.0 References and Report Preparers 7.1 References .......................................................................................................................... 7-1 7.2 Report Preparers ............................................................................................................. 7-14 List of Figures Figure 1-1 CEQA Environmental Review Process ....................................................... 1-6 Figure 2-1 Regional Location ........................................................................................... 2-2 Figure 2-2 Aerial View of Project Site and Surrounding Uses .................................... 2-3 Figure 2-3a Site Photographs ............................................................................................. 2-4 Figure 2-3b Site Photographs ............................................................................................. 2-5 Figure 2-4a Site Vicinity Photographs .............................................................................. 2-6 Figure 2-4b Site Vicinity Photographs .............................................................................. 2-7 Figure 2-5 General Plan Land Use Designations .......................................................... 2-8 Figure 2-6 Zoning Designations ...................................................................................... 2-9 Figure 2-7 Project Site Plan ............................................................................................ 2-13 Figure 4.1-1 Photosimulation 1: View looking south towards project site from intersection of Daisy Avenue and West 48th Street ............................... 4.1-5 Figure 4.1-2 Photosimulation 2: View looking east towards project site from the western terminus of West 48th Street ................................................. 4.1-6 Figure 4.1-3 Photosimulation 3: View looking northeast towards project site from the LA river bicycle and pedestrian path just north of the UP Railroad Bridge ..................................................................................... 4.1-7 Figure 4.1-4 Street Tree on Oregon Avenue south of West 48th Street ..................... 4.1-9 Figure 4.1-5 Entry and Recreation Center Rendering ................................................ 4.1-11 Figure 4.1-6 Entry and Recreation Center Elevations ................................................ 4.1-12 Figure 4.1-7 Plan 1 Front Elevations ............................................................................. 4.1-13 Figure 4.1-8 Plan 2 Front Elevations ............................................................................. 4.1-14 Figure 4.5-1 Regional Fault Zone Map ........................................................................... 4.5-2 Figure 4.5-2 Alquist-Priolo Earthquake Fault Zone Map Long Beach Quadrangle................................................................................................... 4.5-4 Figure 4.5-3 Seismic Safety Element, Plate 2 ................................................................. 4.5-7 Figure 4.5-4 Areas of Potential Liquefaction Long Beach Quadrangle ..................... 4.5-8 Figure 4.8-1 Hydrology Watershed Map ....................................................................... 4.8-9 Figure 4.10-1 Noise Measurement Locations ................................................................ 4.10-7 Figure 4.13-1 Existing (2013) Weekday Peak Hour Traffic Volumes ......................... 4.13-6 Figure 4.13-2 Project Opening

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    315 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us