World Bank Document

World Bank Document

Consolidated Procurement Plan Armenia: Lifeline Roads Improvement Project (Credit 4549 AM) and Additional Financing - Lifeline Roads Improvement Project (Loan 7751 AM) updated 17 December 2009 a) Works and Goods Dated: 17 December 2009 Review By Expected Estimated Bank Contract No. of Procurement Invitation Bid- Start Completion Actual Contract price in Package No. Description/ Location Cost (PRIOR / Award Contractor Note Packages Method Date Opening Date Date** the contract currency (US$ m) Post) Date Date A B C D E F G H I K L M 1. WORKS for rehabilitation of roads: Aghavnadzor-link to M2 Highway (section 16) lot1, CJSC RBE of 1 NCB Prior 31-Mar-09 21-Apr-09 29-Apr-09 5-May-09 30-Nov-10 LRIP*** Contract CW-NCB-1/2009 lot 1 Yeghegnadzor 260,270,830 AMD 1.24 2 Aghavnadzor-link to M2 Highway (section 16) lot2, CJSC RBE of 2 NCB Prior 31-Mar-09 21-Apr-09 29-Apr-09 5-May-09 30-Nov-10 LRIP*** Contract CW-NCB-1/2009 lot 2 Yeghegnadzor 204,875,616 AMD Chkalov-link to M6 Highway (section 7), Contract CW- 0.41 1 NCB Post 31-Mar-09 21-Apr-09 29-Apr-09 5-May-09 30-Nov-10 Tumanyani RBE OJSC LRIP*** Public Disclosure Authorized 3 NCB-2/2009 154,430,544 AMD Joint Venture of Motor Zorakert-Ardenis-Aghvorik-Tavshut-link to M1 Transport Road of 4 0.73 1 NCB Post 31-Mar-09 21-Apr-09 29-Apr-09 5-May-09 30-Nov-10 LRIP*** Highway (section 12) Contract CW-NCB-3/2009 Ashotck CJSC and Akhuryani CHSHSH 276,963,882 AMD Vardenut-link to M3 Highway (section 1), Contract CW- CJSC 5 0.95 1 NCB Post 2-Apr-09 23-Apr-09 19-May-09 26-May-09 30-Nov-10 Mostovik LLC LRIP*** NCB-4/2009 354,837,571 AMD Aygeshat-Janfida (section 2), Contract CW-NCB- 6 0.61 1 NCB Post 2-Apr-09 23-Apr-09 5-May-09 19-May-09 30-Nov-10 Tshanshinvarpet CJSC LRIP*** 5/2009 227,332,359 AMD Geghanist-Horom (section 9) lot1, Contract CW-NCB- 7 NCB Post 2-Apr-09 23-Apr-09 29-Apr-09 5-May-09 30-Nov-10 UnderMoscow OJSC LRIP*** 6/2009 lot1 467,408,989 AMD Geghanist-Horom (section 9) lot2, Contract CW-NCB- 8 3.91 3 NCB Post 2-Apr-09 23-Apr-09 8-May-09 18-May-09 30-Nov-10 Blesk LLC LRIP*** 6/2009 lot2 610,182,373 AMD Geghanist-Horom (section 9) lot3, Contract CW-NCB- 9 NCB Post 2-Apr-09 23-Apr-09 29-Apr-09 5-May-09 30-Nov-10 UnderMoscow OJSC LRIP*** 6/2009 lot3 386,200,577 AMD Lernakert-link to M1 Highway (section 3), Contract 10 1.32 1 NCB Post 2-Apr-09 23-Apr-09 4-May-09 7-May-09 30-Nov-10 Khachhar LLC LRIP*** CW-NCB-7/2009 493,926,092 AMD Voghji-link to M1 Highway (section 10) lot1 , Contract Akhuryan CHSHSH 11 NCB Post 2-Apr-09 23-Apr-09 4-May-09 5-May-09 30-Nov-10 LRIP*** CW-NCB-8/2009 lot1 CJSC 546,205,046 AMD Voghji-link to M1 Highway (section 10) lot2, Contract Akhuryan CHSHSH 12 4 3 NCB Post 2-Apr-09 23-Apr-09 4-May-09 5-May-09 30-Nov-10 LRIP*** CW-NCB-8/2009 lot2 CJSC 471,044,022 AMD Voghji-link to M1 Highway (section 10) lot3, Contract Akhuryan CHSHSH 13 NCB Post 2-Apr-09 23-Apr-09 4-May-09 5-May-09 30-Nov-10 LRIP*** CW-NCB-8/2009 lot3 CJSC 599,851,530 AMD Joint Venture of Voskehask-link to M7 Highway (section 4), Contract Akhuryani Koopshin Ltd 14 0.74 1 NCB Post 2-Apr-09 23-Apr-09 5-May-09 7-May-09 30-Nov-10 LRIP*** Public Disclosure Authorized CW-NCB-9/2009 and Akhuryan CHSHSH CJSC 256,816,373 AMD Aygabats-Gyumri (section 11) lot1, Contract CW-NCB- Akhuryan CHSHSH 15 NCB Post 2-Apr-09 23-Apr-09 4-May-09 5-May-09 30-Nov-10 LRIP*** 10/2009 lot1 CJSC 520,977,631 AMD 2.88 2 Aygabats-Gyumri (section 11) lot2, Contract CW-NCB- 16 NCB Post 2-Apr-09 23-Apr-09 4-May-09 5-May-09 30-Nov-10 UnderMoscow OJSC LRIP*** 10/2009 lot 2 560,020,088 AMD Karchaghbyur-link to M11 Highway (section 5), 17 0.57 1 NCB Post 7-Apr-09 28-Apr-09 5-May-09 15-May-09 30-Nov-10 Kapavor Ltd LRIP*** Contract CW-NCB-11/2009 214,123,507 AMD Akunk-Vardenis (section 6), Contract CW-NCB- 18 0.84 1 NCB Post 7-Apr-09 28-Apr-09 5-May-09 15-May-09 30-Nov-10 Kapavor Ltd LRIP*** 12/2009 315,034,280 AMD Dzoragyugh-link toM10Highway (section 8), Contract 19 0.93 1 NCB Post 7-Apr-09 28-Apr-09 5-May-09 11-May-09 30-Nov-10 OJSC RBE OF GAVAR LRIP*** CW-NCB-13/2009 348,803,161 AMD L.Karmiraghbyur-Berd (section 13) lot1, Contract CW- 20 NCB Post 7-Apr-09 28-Apr-09 5-May-09 15-May-09 30-Nov-10 Tavushi CJSC CHSH LRIP*** NCB-14/2009 lot1 318,449,630 AMD 1.4 2 L.Karmiraghbyur-Berd (section 13) lot2, Contract CW- Chambarak CHSHSH 21 NCB Post 7-Apr-09 28-Apr-09 5-May-09 14-May-09 30-Nov-10 LRIP*** NCB-14/2009 lot2 OJSC 205,963,495 AMD Chochkan-Pokr Ayrum (section 14) lot 1, Contract CW- 22 NCB Post 7-Apr-09 28-Apr-09 29-Apr-09 8-May-09 30-Nov-10 Sahakyanshin CJSC LRIP*** NCB-15/2009 lot1 332,673,586 AMD 1.99 2 Chochkan-Pokr Ayrum (section 14) lot 2, Contract CW- 23 NCB Post 7-Apr-09 28-Apr-09 29-Apr-09 14-May-09 30-Nov-10 Levon Erkrord LLC LRIP*** NCB-15/2009 lot2 414,151,942 AMD Kurtan-Gyulakarak (section 15) lot1, Contract CW- 24 NCB Post 7-Apr-09 28-Apr-09 4-May-09 6-May-09 30-Nov-10 Argishti1 LLC LRIP*** NCB-16/2009 lot1 645,648,463 AMD 3.16 2 Kurtan-Gyulakarak (section 15) lot2, Contract CW- 25 NCB Post 7-Apr-09 28-Apr-09 4-May-09 20-May-09 30-Nov-10 Lorii CHSHSH CJSC LRIP*** NCB-16/2009 lot2 536,329,331 AMD Public Disclosure Authorized Public Disclosure Authorized H17-Armavir-Isahakyan km18+850-km22+800 lot1, 26 NCB Post 13-Jun-09 6-Jul-09 10-Jul-09 1-Aug-09 30-Nov-10 Kotayki CH SH SH LLC LRIP*** Contract CW-NCB-17/2009 lot1 360,480,968 AMD 1.84 2 H17-Armavir-Isahakyan km22+800-km25+956 lot 2, Motor Transport Road of 27 NCB Post 13-Jun-09 6-Jul-09 10-Jul-09 20-Jul-09 30-Nov-10 LRIP*** Contract CW-NCB-17/2009 lot2 Talin OJSC 313,668,905 AMD Sers-Martiros-Zaritap km0+000-km3+681 lot 1, 28 NCB Post 13-Jun-09 6-Jul-09 16-Jul-09 21-Jul-09 30-Nov-10 Vayki CHSHSH CJSC 413,807,366 AMD LRIP*** Contract CW-NCB-18/2009 lot1 Sers-Martiros-Zaritap km3+681-km7+788 lot 2, 29 3.2 3 NCB Post 13-Jun-09 6-Jul-09 10-Jul-09 20-Jul-09 30-Nov-10 Vayki CHSHSH CJSC LRIP*** Contract CW-NCB-18/2009 lot2 331,537,982 AMD Sers-Martiros-Zaritap km7+788-km11+385 lot 3, 30 NCB Post 13-Jun-09 6-Jul-09 16-Jul-09 1-Aug-09 30-Nov-10 Kapani CHSHSH LLC LRIP*** Contract CW-NCB-18/2009 lot3 440,096,945 AMD Joint Venture of Sisiani Sisian-Brnakot km 0+000-km2+960 lot 1*, Contract 31 NCB Prior 24-Jun-09 15-Jul-09 22-Jul-09 1-Aug-09 15-Dec-10 BUAT LLC and Vahagn 348,040,572 AMD Add. LRIP**** CW-NCB-AF-1/2009 lot1 ev Samvel LLC 1.77 2 Joint Venture of Megru T Sisian-Brnakot km 2+960-km4+749 lot 2*, Contract 32 NCB Prior 24-Jun-09 15-Jul-09 22-Jul-09 1-Aug-09 15-Dec-10 SH SH D OJSC and 296,249,983 AMD Add. LRIP**** CW-NCB-AF-1/2009 lot2 Sisiani TCHANSHIN M17-Meghri km0+000-km3+000 * Contract CW-NCB- LLC 33 1.05 1 NCB Prior 25-Jun-09 14-Aug-09 3-Sept-09 10-Sept-09 15-Dec-10 Megru T SH SH D OJSC Add. LRIP**** AF-2/2009 396,165,535 AMD M2-Kavchut-Geghavanq km0+000-km2+500 lot 1, 34 NCB Post 1-Aug-09 24-Aug-09 3-Sept-09 17-Sept-09 15-Dec-10 Kapani CHSHSH LLC Add. LRIP**** Contract CW-NCB-AF-7/2009 lot1 412,295,533 AMD 2.53 2 M2-Kavchut-Geghavanq km2+500-km6+000 lot 2, 35 Post 1-Aug-09 24-Aug-09 3-Sept-09 17-Sept-09 15-Dec-10 Kapani CHSHSH LLC Add. LRIP**** Contract CW-NCB-AF-7/2009 lot2 543,791,446 AMD M17-Alvanq km0+000-km2+597, Contract CW-NCB- 36 0.84 1 NCB Post 1-Aug-09 24-Aug-09 28-Aug-09 7-Sept-09 15-Dec-10 Megru T SH SH D OJSC Add.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us