Updated Resettlement and Customary Communities Plan – Part 1

Updated Resettlement and Customary Communities Plan – Part 1

Updated Resettlement and Customary Communities Plan – Part 1 # Resettlement and Customary Communities Plan September 2018 INO: West Kalimantan Power Grid Strengthening Project (Tayan – Sanggau – Sekadau) Prepared by PT. Perusahaan Listrik Negara (PLN) Persero for the Government of Indonesia and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 September 2018) Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0.0000671096 $1.00 = Rp14,901 NOTE (i) In this report, "$" refers to US dollars. This resettlement and customary communities plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. UPDATED RESETTLEMENT AND CUSTOMARY COMMUNITIES PLAN INO: West Kalimantan Power Grid Strengthening Project 150 kV Tayan – Sanggau – Sekadau Transmission Lines and 150/20 kV Sanggau and Sekadau Substations Prepared by PT PLN (Persero) for Asian Development Bank September 2018 ABBREVIATION ADB Asian Development Bank AFD Agence Française de Développement AH Affected Household AP Affected Person APG ASEAN Power Grid BPN Badan Pertanahan Nasional (National Land Agency) COI Corridor Of Impact DAD Dewan Adat Dayak (Dayak Cultural Council) DCF Discounted Cash Flow DED Detailed Engineering Design DMS Detailed Measurement Survey EA Executing Agency EMA External Monitoring Agency GoI Government of Indonesia HH Household HVTL High Voltage Transmission Line IA Implementing Agency IMA Independent Monitoring Agency IOL Inventory Of Losses IP Indigenous People IR Involuntary Resettlement IRP Income Restoration Program KITRING KBB 2 Pembangkit dan Jaringan Kalimantan Bagian Barat 2 (Powerplant and Transmission of West Kalimantan 2) LA Land Acquisition LAC Land Acquisition Committee LVDL Low Voltage Distribution Line MAPPI Masyarakat Profesi Penilai Indonesia (Indonesian Professional Appraiser Association) MEMR Minister of Energy and Mineral Resources MVDL Medium Voltage Distribution Line MUSPIKA Musyawarah Pimpinan Kecamatan (Board of Subdistrict Government Leaders) NGO Non-governmental Organization PIB Project Information Booklet PMU Project Management Unit PIU Project Implementation Unit PIC Project Implementation Consultant PLN PT Perusahaan Listrik Negara (Persero) (State Owned Electricity Enterprise) PNBP Penerimaan Negara Bukan Pajak (Non-Taxes of State Revenue) PPTA Project Preparatory Technical Assistant RCCP Resettlement Customary Communities Plan RCCDP Resettlement Customary Communities Development Plan ii RCS Replacement Cost Study ROW Right-Of-Way RP Resettlement Plan RTRW Rencana Tata Ruang Wilayah (Spatial Plan) RUPTL Rencana Usaha Penyediaan Tenaga Listrik SES Socio Economic Survey SKT Surat Keterangan Tanah SPI Standart Penilaian Indonesia SPT Surat Pernyataan Tanah TL Transmission Line TOR Terms of Reference TP4D Tim Pengawalan Pengamanan Pemerintahan dan Pembangunan Daerah UIP Kalbagbar Unit Pelaksana Proyek Pembangkit dan Jaringan Kalimantan Bagian Barat (West Kalimantan Principal Development Project 2) UPP KITRING KBB 2 Unit Pelaksana Proyek (Project Implementation Unit) iii DEFINITION OF TERMS Affected Household / Refers to any person or persons, customary community, private Population / Entitled or public institution who are physically displaced (relocation, loss Persons of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihood) as result of i) acquisition of land; ii) restriction on land use or on access to legally designated parks and protected areas. The affected populations are parties who control or possess an object land acquisition. Entitled party Party that controls or possess land acquisition object Land Acquisition Land, space above ground and below ground, buildings, plants, object objects related to land, or any other objects that can be assessed Census of affected The census is a count of all displaced persons irrespective of persons their titled or non-titled land ownership status. Its purpose is to accurately document the number of displaced persons and to create an inventory of their losses finalized on the basis of a Detail Measurement Survey A census describes the persons who are displaced, their livelihoods and income sources, and what they are likely to lose because of the project. Compensation Proper and equitable replacement provided in the form of cash or other agreed in kind at replacement cost to the affected person/entitled party in the process of land acquisition/resettlement for the assets and livelihoods lost or affected by the project. Corridor of Impact Area, which is impacted by civil works (including construction for footprint of towers, construction of substation and facilities, and restricted area due to transmission line ROW) in the implementation of Transmission Line 150 kV Tayan-Sanggau- Sekadau project. It is important in two particular respects: (a) Legally as the area within which AHs will be entitled to compensation and other measures for any loss of land, structures or land use and occupation and of livelihoods and (b) Operationally as the agreed and demarcated area within which construction activities will take place. Cut-off date The date prior to which the occupation or use of the project area make residents or users of the same eligible to be categorized as AP/entitled party to receive compensation and other assistances. The cut-off-date will coincide with the census of APs/entitled parties and the IOL that will be conducted by the PLN implementing land acquisition. Detailed With the use of approved detailed engineering drawings, this Measurement Survey activity involves the finalization and/or validation of the results of the IOL, severity of impacts, and list of APs done during the preparation of the resettlement customary community plan (RCCP). The updating will be carried out during land acquisition implementation phase undertaken by the PLN land acquisition iv committee Disclosure Relevant information (whether positive or negative) about social and environmental safeguard issues is made available in a timely manner, in an accessible place, and in a form and language(s) understandable to affected people and to other stakeholders, including the general public, so they can provide meaningful inputs into project design and implementation Eminent domain/ The right of the state using its sovereign power to acquire land Compulsory Land for public purposes. National law establishes which public Acquisition agencies have the prerogative to exercise eminent domain. Entitlement Refers to a range of measures of compensation and other forms of assistance provided to displaced/entitled persons in the respective eligibility category. Impact Extent of social and economic impacts resulting from the implementation of an activity. In land acquisition/resettlement, the degree of impact will be determined by (a) scope of economic loss and physical displacement/relocation; and (b) vulnerability of the affected population/entitled party. Impact can be positive or negative. Impact Indicator Effect of benefits derived from project activity. Impact indicators can only be known in medium and long term. Impact indicators show the rationale why a project is implemented, describe the macro aspects of project implementation, and the purpose of project either for sectorial or regional Income restoration This involves rehabilitating the sources of income and productive livelihoods of severely affected and vulnerable APs to enable income generation equal to or, if possible, better than earned by displaced persons before resettlement. Indigenous People A generic sense to refer to a distinct, vulnerable, social and cultural group possessing the following characteristics in varying degrees: (i) self-identification as members of a distinct indigenous cultural group and recognition of this identity by others; (ii) collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; (iii) customary cultural, economic, social, or political institutions that are separated from those of the dominant society and culture; and (iv) a distinct language, often different from the official language of the country or region. In considering these characteristics, national legislation, customary law, and any international conventions to which the country is a party will be taken into account. Informed Consent Informed consent means that the person involved is fully understand about the project and its implications and consequences, and freely agrees or disagrees to participate. Inventory of Losses This is the listing of assets as a preliminary record of affected or lost assets during the preparation of this RCCP where all fixed assets (i.e. land used for residence, commerce, agriculture; v dwelling units; stalls and shops; secondary structures, such as fences, tombs, wells; standing crops and trees with commercial value; etc.) and sources of income and livelihood inside the COI are identified, measured, their owners identified, their exact location pinpointed and their replacement costs calculated. The severity of impact

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    149 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us