C-V2X & Railways Case Study

C-V2X & Railways Case Study

Synergies in Connected Mobility of Tomorrow : C-V2X & Railways Case Study Amine DIDIOUI INNOVATION & RESEARCH PROJECT LEADER 10/07/2018 Existing and Future Needs for Railways Applications • Now: – GSM-R is a major railway technology used for train-to-ground voice and data communications, part of ERTMS (European Rail Traffic Management System) – In France, GSM-R covers 16 000 km of lines, representing 80% of traffic flows – GSM-R lifecycle coming to its end, with uncertain vendor support beyond 2030 • The Future: – FRMCS (Future Radio Mobile Communication System) is the successor of GSM-R – FRMCS could be based on 3GPP LTE/5G system in order to address a large set of applications specified by “UIC FRMCS Project”: 1 - Critical 2 - Performance 3 - Business Communications Communications Communications 5 – Performance 4 – Critical Support 6 – Business Support Support Train-to-Everything Communication Project – Securing the highest level of safety for people is SNCF’s 1st commitment – SNCF in partnership with Qualcomm are evaluating the potential use of C-V2X technology for railways applications Train-to-Everything Communications : C-V2X Use Cases In Railways • C-V2X technology opens a wide range of applications in the rail domain: Train-to-Infrastructure Train-to-Maintenance Operators Communications Communications (e.g. Level crossings) Train-to-Train Communications (e.g. virtual coupling/platooning ) Train-to-Ground Communications (e.g. signaling systems) C-V2X Testing: Train-to-Railway Crossing and Car-to-Railway Crossing – Tests conducted on SNCF rail route from Vitry to Montereau – C-V2X communication system set-up on SNCF test train Vitry-sur-Seine – RSU setup close to Livry-sur-Seine train station – C-V2X communication system set-up on a car RSU High-Level System Architecture Trial Server Platform PC5 C-V2X DP PC5 C-V2X DP PC5 C-V2X RSU C-V2X Communication System on the Train • The train is continuously sending and receiving CAM messages using PC5 • All data is recorded by the DP and sent to the “Trial Server Platform” using 4G Antenna Location RSU System at the Railway Crossing • The RSU is continuously sending and receiving CAM messages using PC5 from the train and the car Arriving direction Omnidirectiona l Antenna ~ RSU 3m Departing direction Thank you! .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us