
MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LTD. (MSRDC) [GOVERNMENT OF MAHARASHTRA UNDERTAKING] SCHEDULES Request for Proposal (RFP) for Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) in the State of Maharashtra on EPC mode for Construction Package 15, from Km. 636.479 to Km. 664.479 (Section - Village Vashala BK to Village Birwadi) in District Thane. VOLUME – III Instructions to Bidders (ITB) July 2018 Corporate Office: Maharashtra State Road Development Corporation (MSRDC) Limited, Bandra Worli (Rajeev Gandhi) Sea Link Project Office, K.C. Marg, Opposite Bandra Reclamation Bus Depot, Bandra (West), Mumbai-400050, Maharashtra State, INDIA MSRDC Schedules SCHEDULE-A (See Clauses 2.1 and 8.1) SITE OF THE PROJECT EXPRESSWAY 1 The Site 1.1 Site of the Six-Lane Project Expressway shall include the land, buildings, structures and road works as described in Annex-I of this Schedule-A. 1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of this Schedule-A. 1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any other immovable property on, or attached to, the Site shall be prepared jointly by the Authority Representative and the Contractor, and such inventory shall form part of the memorandum referred to in Clause 8.2.1 of this Agreement. 1.4 The alignment plans of the Project Highway are specified in Annex-III. The proposed profile of the project highways shall be followed by the Contractor with minimum FRL as indicated in the alignment plan. The Contractor, however, improve / upgrade the Road Profile as indicated in Annex-III based on site/design requirement. 1.5 The status of the environment clearances obtained or awaited is given in Annex IV. Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 1 MSRDC Schedules Annex – I (Schedule-A) Site 1. Site The site of the Six-Lane Project Expressway is forming part (package-15) of Nagpur- Mumbai Super Communication Expressway commencing from Vashala bk village at Km 636.479 and ends at Khutadi village at Km 664.479 passing through green field area (refer Index Map given at Appendix A-1) in the state of Maharashtra. The land, carriageway and structures comprising the Site are described below 2. Land The Site of the Project Expressway comprises the land (sum total of land already in possession and land to be possessed) as described below: Chainage (km) Total Sr. Right of Village Remarks No. From To Way (ROW) 1 Vashala bk 636.500 636.891 90.0 2 Vashala bk 636.891 636.960 60.0 3 Vashala bk 636.960 637.150 90.0 4 Vashala bk 637.150 639.011 120.0 5 Vashala bk 639.011 693.310 60.0 6 Vashala bk 639.310 639.592 120.0 Alignment 7 Vashala bk 639.592 639.832 60.0 of project Expressway Vashala bk, 8 639.832 640.921 120.0 is passing Vashala kh through Vashala kh, Green Field 9 640.921 642.690 60.0 Kasara area 10 Kasara 642.690 643.915 120.0 11 Kasara 643.915 644.155 90.0 12 Kasara 644.155 644.247 60.0 13 Kasara 644.247 645.441 120.0 14 Kasara 645.441 645.743 90.0 Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 2 MSRDC Schedules Chainage (km) Total Sr. Right of Village Remarks No. From To Way (ROW) 15 Kasara 645.743 645.978 60.0 16 Kasara, Shirol 645.978 646.951 120.0 17 Shirol 646.951 647.250 90.0 18 Shirol 647.250 647.421 60.0 19 Shirol 647.421 650.087 120.0 20 Shirol, Golbhan 650.087 650.923 60.0 Golbhan, 21 Khardi,Dhamani, 650.923 655.539 120.0 Dalkhan 22 Dalkhan 655.539 655.704 90.0 23 Dalkhan, Khardi 655.704 656.031 120.0 Alignment 24 Khardi, Chande 656.031 656.170 90.0 of project 25 Chande 656.170 656.333 60.0 Expressway is passing 26 Chande 656.333 656.500 120.0 through 27 Chande 656.479 656.860 120.0 Green Field Chande, area 28 656.860 657.009 60.0 Ratandhle Ratandhle, Lahe, Birwadi, 29 657.009 664.379 120.0 Saralambe, Khutadi Note : - The total ROW given in above table is for the proposed expressway except at interchange locations, wayside amenities and at locations for training the course of nalah/drain, at crossing of roads ( VR, ODR, MDR, SH,NH etc) where the ROW varies. 3. Carriageway The proposed Expressway is a green field area where no carriageway exists. Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 3 MSRDC Schedules 4. Major Bridges The Site includes the following Major Bridges: Sr. No. Proposed Chainage (km) Length of Structure Remarks Nil 5. Road over-bridges (ROB)/ Road under-bridges (RUB) The Site includes the following ROB (road over railway line)/RUB (road under railway line): Sr. No. Chainage (km) Length of Structure Remarks Nil 6. Grade Separator The Site includes the following grade separators: Sr. No. Chainage (km) Length of Structure Remarks Nil 7. Minor Bridges The Site includes the following minor bridges: Sr. No. Chainage (km) Length of Structure Remarks Nil 8. Railway Level Crossings The Site includes the following railway level crossings: Sr. No. Chainage (km) Remarks NIL 9. Underpasses/ Overpasses (Vehicular/Non-vehicular) The Site includes the following underpasses/Overpasses: Sr. No. Chainage (km) Length of Structure Remarks Nil 10. Culverts The Site has the following culverts: Sr. No. Chainage (km) Length of Structure Remarks Nil Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 4 MSRDC Schedules 11. Bus Bays The details of bus bays on the Site are as follows: Sr. No. Chainage (km) Dimension Location (Left/Right) Nil 12. Truck Bays The details of truck lay byes are as follows: Sr. No. Chainage (km) Dimension Location (Left/Right) Nil 13. Road Side Drains The details of the roadside drains are as follows: Chainage (km) Sr. No. Length of Structure Dimension From To Nil 14. Major Junctions The details of major cross roads on the Site are as follows: Sr. No. Road Type Chainage (km) 1 ODR 640.371 2 MDR - 56 660.677 15. Minor Junctions The details of minor cross roads on the Site are as follows: Sr. No. Road Type Chainage (km) 1 Village Road 638.291 2 Village Road 643.238 3 Village Road 646.415 4 Village Road 647.168 5 Village Road 648.200 6 Village Road 652.286 7 Village Road 653.573 8 Village Road 655.010 Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 5 MSRDC Schedules Sr. No. Road Type Chainage (km) 9 Village Road 658.170 10 Village Road 661.598 11 Village Road 662.032 12 Village Road 663.503 Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 6 MSRDC Schedules Annex II (Schedule-A) DATES FOR PROVIDING RIGHT OF WAY The dates on which the Authority shall provide Right of Way to the Contractor on different parts of the Site are stated below: Design From Km to Km (Design Width Date of providing Sl. No Length Chainage) (m) ROW (Km) 1 2 3 4 5 (i) Full Right of Way RoW for 90% of project length shall be handed over on Appointed Date. (full width) (ii) Balance Right of RoW for balance 10% of project length shall be handed over within 150 Way (width) days from Appointed Date. Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 7 MSRDC Schedules Annex – III (Schedule-A) ALIGNMENT PLANS The plan and profile is available on e-portal of MSRDC website. Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 8 MSRDC Schedules Annex - IV (Schedule-A) Environment Clearances I. Tansa and Kalsubai Wildlife Sanctuary clearance is in process II. Forest Clearance is in process III. Environmental Clearance as per EIA Notification 2006 is in process. Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 9 MSRDC Schedules Appendix A-I Index map of Project Expressway Construction of Nagpur Mumbai Super Communication Expressway (Package 15) from km 636.479 to km 664.479 on EPC Mode 10 MSRDC Schedules SCHEDULE – B (See Clause 2.1) DEVELOPMENT OF THE PROJECT EXPRESSWAY 1. Development of the Project Expressway Development of the Project Expressway shall include design and construction of the six lanes (divided carriageway) expressway as described in this Schedule-B and in Schedule-C. General description of the Project Expressway is given at Annex-I of this Schedule B. 2. Specifications and Standards (i) The Project Expressway shall be designed and constructed in conformity with the Specifications and Standards specified in Annex-I of Schedule-D. (ii) The alignment plan of the Project Expressway is specified in Annex III of Schedule A. The proposed profile of the Project Expressway shall be followed by the Contractor with minimum FRL as indicated in alignment plan. The Contractor however, improve\upgrade the road profile as indicated in Annex - III based on site/design requirement.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages135 Page
-
File Size-