Cambridge South East Transport Evidence Base Appendices September 2013 Commercial Estates Group Cambridge South East FINAL Transport Evidence Base: Cambridge Local Plan 2014 South Cambridgeshire Local Plan September 2013 APPENDICES Produced by: Integrated Transport Planning Ltd 32a Stoney Street The Lace Market Nottingham NG1 1LL Tel: 0115 9886905 Contact: Jon Parker Email: [email protected] Web: www.itpworld.net Appendix A: Detailed Analysis of Alternative Strategic Sites containing the following documents: A (i) Census 2011 Map-based analysis A (ii) Accession Mapping (Public Transport) and Core Accessibility Indicators A (iii) Analysis of CRSM 29013 Transport Modelling Projections for Fringe Sites and Rural Sites (Cambridgeshire County Council) A (iv) Assessment of alternative sites travel distances (by road) and\ emission levels A (v) Assessment of Local Plans and Alternative Sites against the Cambridge City and South Cambridgeshire Draft Transport Strategy A (vi) Assessment of Local Plans and Alternative Sites against the Cambridgeshire County Council Local Transport Plan A (vii) Detailed Assessment of Local Plans and Alternative Sites against NPPF Criteria A (viii) Assessment of existing housing developments and their approach to transport promotion Appendix B: Deliverability Evidence containing the following documents: B (i) Note on deliverability and programming of A14 improvements B (ii) Note on deliverability of Hills Road cycle and bus improvements Appendix C: Cambourne Case Study - ‘Lessons from Cambourne’ Review Appendix D: Public Transport Assessment, covering: Journey times and service frequency issues Accessibility by bus and rail Cambridge South East and the public transport solution for this location Appendix E: Sustainable Transport and Travel Plan Assessment, covering: ‘Smarter Travel’ solutions Residential and workplace travel planning and their role in enabling development Comparative analysis of existing residential travel plans Cambridge South East and the sustainable transport solution for this location Appendix F: Traffic Management and Infrastructure Assessment, covering: Detailed evidence base for infrastructure requirements of alternative sites The infrastructure needed to connect Cambridge South East to Cambridge A (i) Census 2011 Map-based analysis A1096 Travel to Work by Active Modes % of Working Population Northstowe )" <15% A14(T) A10 15 - 30% Waterbeach )" 30 - 45% 45 - 60% >60% Proposed Cambridge South East Site Other Proposed Development Sites Existing Residential Development Site J14 SOUTH CAMBRIDGESHIRE A1309 )" A428(T) A1303 )" J13 A1303 Cambourne Bourn Airfield CAMBRIDGE A603 A603 J12 A1198 A1134 )" M11 Cambridge South East A1309 Method of Travel to Work (Census 2011): Walk or Cycle J11 A1307 1:100,000 A10 A1301 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 A A A1096 Travel to Work by Bus % of Working Population Northstowe )" <5% A14(T) A10 5 - 10% Waterbeach )" 10 - 15% 15 - 20% >20% Proposed Cambridge South East Site Other Proposed Development Sites Existing Residential Development Site J14 SOUTH CAMBRIDGESHIRE A1309 )" A428(T) A1303 )" J13 A1303 Cambourne Bourn Airfield CAMBRIDGE A603 A603 J12 A1198 A1134 )" M11 Cambridge South East A1309 Method of Travel to Work (Census 2011): Bus J11 A1307 1:100,000 A10 A1301 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 B A A10 Travel to Work by Car Northstowe )" % of Working Population A14(T) <25% Waterbeach )" 25 - 40% 40 - 55% 55 - 70% >70% Proposed Cambridge South East Site Other Proposed Development Sites Existing Residential J14 Development Site SOUTH CAMBRIDGESHIRE A1309 )" A428(T) A1303 )" J13 A1303 Cambourne Bourn Airfield CAMBRIDGE A603 J12 A1198 A1134 )" M11 Cambridge South East A1309 Method of Travel to Work J11 (Census 2011): Car Driver A1307 A10 A1301 1:100,000 A603 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 C A A1096 Travel to Work by Bus or Rail % of Working Population Northstowe )" <5% A14(T) A10 5 - 10% Waterbeach )" 10 - 15% 15 - 20% >20% Proposed Cambridge South East Site Other Proposed Development Sites Existing Residential Development Site J14 SOUTH CAMBRIDGESHIRE A1309 )" A428(T) A1303 )" J13 A1303 Cambourne Bourn Airfield CAMBRIDGE A603 A603 J12 A1198 A1134 )" M11 Cambridge South East A1309 Method of Travel to Work (Census 2011): Public Transport J11 A1307 1:100,000 A10 A1301 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 D A A10 Sustainable Travel to Work Northstowe )" % of working population A14(T) <15% Waterbeach )" 15 - 30% 30 - 45% 45 - 60% >60% Proposed Cambridge South East Site Other Proposed Development Sites Existing Residential J14 Development Site SOUTH CAMBRIDGESHIRE A1309 )" A428(T) )" A1303 J13 Cambourne A1303 Bourn Airfield CAMBRIDGE A603 J12 A1198 A1134 )" M11 Cambridge South East A1309 Method of Travel to Work J11 (Census 2011): PT, Cycle or Walk A1307 A1301 A10 1:100,000 A603 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 E A Key Destinations Northstowe Type ") ' Education A14(T) ' Employment ") Retail Waterbeach ' ' Transport Proposed Cambridge South East Site 23 Other Proposed Development Sites Existing Residential 13 Development Site 2 Average Cambridge Travel J14 3 to Work by Cycle Distance SOUTH CAMBRIDGESHIRE 16 (3.7km) A130 9 ") A428 (T) ") A130 3 J13 22 Cambourne 25 20 Bourn Airfield CAMBRIDGE 4 17 A603 14 J12 18 A11 98 A11 34 19 1 ") M11 Cambridge South East 24 21 Average Cambridge Cycle Catchments J11 of Proposed Development Sites A130 7 A10 A130 1 1:100,000 A603 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 F A ") Key Destinations A11 98 ' Education ' Employment A14(T) ' Retail ' Transport Proposed Development Site Cycle Catchment Distance 1.5km J14 3km A130 7 5km 8km ! ! Average Travel to Work ! ! A428 (T) Cycle Distance (3.7km) SOUTH CAMBRIDGESHIRE ") A130 3 J13 25 Bourn Airfield ' CAMBRIDGE '4 A603 J12 M11 Cycling Catchment of Bourn Airfield Proposed' Development Site 1:75,000 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 G A ") A11 98 Cycle Catchment Distance 1.5km 3km A14(T) 5km 8km ! ! Average Travel to Work ! ! Cycle Distance (3.7km) Proposed Development Site Existing Residential Development Site J14 Key Destinations A130 7 ' Education ' Employment Retail ") A428 (T) ' ") A130 3 SOUTH CAMBRIDGESHIRE J13 25 Cambourne Bourn Airfield ' ' Transport CAMBRIDGE '4 J12 M11 Cycling Catchment of Cambourne A603 Existing Development Site 1:75,000 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 H A '13 '2 J14 '3 A428 (T) '16 EAST CAMBRIDGESHIRE Cycle Catchment Distance A130 9 A14(T) 1.5km A130 3 3km J13 '25 '20 '22 4 5km ' 17 15 ' 8km CAMBRIDGE ' ! '5 ! Average Travel to Work ! ! Cycle Distance (3.7km) A603 A603 Proposed Cambridge SE Site 14 ' Key Destinations J12 '18 ' Education ' Employment A11 34 '19 ' Retail '1 ") ' Transport Cambridge South East M11 '24 A11 (T) A130 9 '21 J11 A130 7 A10 SOUTH CAMBRIDGESHIRE '8 '9 Cycling Catchment of Cambridge SE Proposed Development Site 1:75,000 A505 '12 A130 1 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 I A A11 23 EAST CAMBRIDGESHIRE Cycle Catchment Distance 1.5km 3km 5km A109 6 8km ! ! Average Travel to Work ! ! Cycle Distance (3.7km) Proposed Development Site Key Destinations ' Education ' Employment ' Retail ' Transport Northstowe SOUTH CAMBRIDGESHIRE ") A14(T) '23 A10 Cycling Catchment of Northstowe A130 9 Proposed Development Site '13 2 ' 1:75,000 J14 '3 CAMBRIDGE M11 16 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 ' Figure A 1 J A ' ' A11 23 Cycle Catchment Distance 1.5km 3km 5km A10 8km ! ! Average Travel to Work ! ! Cycle Distance (3.7km) Proposed Development Site Key Destinations ' Education EAST CAMBRIDGESHIRE ' Employment ' Retail Waterbeach SOUTH CAMBRIDGESHIRE ") ' Transport '23 A130 9 '13 A14(T) '2 J14 '3 A428 (T) CAMBRIDGE Cycling Catchment of Waterbeach M11 16 ' Proposed Development Site A130 7 1:75,000 A130 3 A11 34 J13 '25 '20 '22 A11 34 Contains Ordnance Survey Data@'4 Crown Copyright and Database Rights'17 2013 Figure A 1 K A ' Key Destinations A10 Type Northstowe ") ' Education A14(T) Waterbeach ' Employment ") ' Retail SOUTH CAMBRIDGESHIRE ' Transport Proposed Cambridge South East Site '23 Other Proposed Development Sites Existing Residential Development Site '13 '2 Average Travel to Work J14 '3 Distance by Walking '16 (2.4km) A130 9 ") A428 (T) ") A130 3 J13 22 Cambourne '25 '20 ' Bourn Airfield CAMBRIDGE '4 '17 ' A603 '14 J12 '18 A11 34 A11 98 '19 '1 ") M11 Cambridge South East '24 21 ' Average Cambridge Walk Catchments J11 of Proposed Development Sites A130 7 A130 1 A10 1:100,000 A603 A11 (T) Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 L A ' ' Walk Catchment Distance 1km 3km A11 98 4km 2.4km (average) Existing Site Proposed Development Site Key Destinations ' Education ' Employment ' Retail A428 (T) ' Transport SOUTH CAMBRIDGESHIRE ") Cambourne ") Bourn Airfield Walking Catchment of Cambourne Existng Development Site 1:50,000 Contains Ordnance Survey Data@ Crown Copyright and Database Rights 2013 Figure A 1 N A ' A14(T) J13 A130 3 '25 '20 '22 '4 Walk Catchment Distance 17 ' 1km 15 ' 3km '5 4km 2.4km (average) A603 A603 Proposed Cambridge SE Site 14 CAMBRIDGE ' Key Destinations ' Education J12 18 ' ' Employment ' Retail
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages234 Page
-
File Size-