Sample Procurement Plan

Sample Procurement Plan

Sample Procurement Plan I. General Public Disclosure Authorized 1. Project Information : Disaster Risk Management and Urban Development Project (P145268) /Gouvernement de la République du Niger 2. Bank’s approval Date of the procurement Plan 19-oct.-15 3. Date of General Procurement Notice: March 17, 2015 4. Period covered by this procurement plan: Juillet 2017- Décembre 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments Public Disclosure Authorized US$ 1. ICB and LIB (Goods) Above US$ 1,000,000 All 2. NCB (Goods) NA 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) NA 5. (Non-Consultant Services) Above US$ 1,000,000 All [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Public Disclosure Authorized Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by <mention name of PIU> 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced Public Disclosure Authorized procurement) 1 2 3 4 5 6 7 Description Estimated Packages Review Comments July 9, 2010 Ref. Cost Domestic by Bank No. US$ Preference (Prior / million (yes/no) Post) Summary of 16.734 1 N/A Prior the ICB (Work) Summary of 0 0 N/A Post the ICB (Goods) Summary of 26.993 24 N/A Post the NCB (Works) Summary of 0.449 2 N/A Post the NCB (Goods) Summary of 0 0 N/A Post the ICB (Non Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold (en Comments US$ 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 100,000 3. Individual (Comparison of CVs) Above US$ 100,000 Individual (Single source) Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 3.124 11 Prior number of contracts that will be let under QCBS July 9, 2010 Summary of 1.886 18 Post CQS, CDS, number of I C contracts that will be let under other methods July 9, 2010 PROCUREMENT Niger : Niger Disaster Risk Management and Urban Development Project PLAN General Information Country: Niger Banks Approval Date of the Original Procurement Plan: 2017-10-19 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-04-18 Project ID: P145268 GPN Date: Project Name: Niger Disaster Risk Management and Urban Development Project Loan / Credit No: IDA / 53400, IDA / Q8620 Executing Agency(ies): Projet de Gestion des Risques de Catastrophes et de DéveloppementUrbain (PGRC-DU) WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NE-PGRC-DU-21866-CW-RFB / Comp. 1: Flood Risk Single Stage - One Under TRAVAUX DE REALISATION DE IDA / 53400 Post Request for Bids Open - National 1,666,666.00 0.00 2017-07-25 2018-01-01 2017-07-30 2017-09-10 2017-08-14 2017-10-10 2017-12-25 2017-11-14 2018-05-13 Management Investments Envelope Implementation LA DIGUE ROUTE DE DOSSO NE-PGRC-DU-21896-CW-RFB / Réhabilitation et construction Comp. 1: Flood Risk Single Stage - One Pending d'infrastructures scolaires dans IDA / 53400 Post Request for Bids Open - National 320,667.00 0.00 2017-07-25 2017-07-30 2017-09-10 2017-10-10 2017-11-14 2018-05-13 Management Investments Envelope Implementation les zones touchées par les inondations à Diffa NE-PGRC-DU-22521-CW-RFB / Rehabilitation ou construction de Comp. 1: Flood Risk Single Stage - One Pending latrines dans les zones touchées IDA / 53400 Post Request for Bids Open - National 333,333.00 0.00 2017-07-28 2017-08-02 2017-09-13 2017-10-13 2017-11-17 2018-05-16 Management Investments Envelope Implementation par les inondations dans la Région de Tillabéri NE-PGRC-DU-22531-CW-RFB / REHABILITATION D'INFRASTRUCTURES Comp. 1: Flood Risk Single Stage - One Pending IDA / 53400 Post Request for Bids Open - National 100,000.00 0.00 2017-10-10 2017-10-15 2017-11-26 2017-12-26 2018-01-30 2018-07-29 SCOLAIRES DANS LES Management Investments Envelope Implementation REGIONS DE DOSSO ET TILLABERY NE-PGRC-DU-22547-CW-RFB / Travaux de réalisation de de Comp. 1: Flood Risk Single Stage - One Pending IDA / 53400 Post Request for Bids Open - National 450,000.00 0.00 2017-11-06 2017-11-11 2017-12-23 2018-01-22 2018-02-26 2018-08-25 Puits et Mini AEP dans la Management Investments Envelope Implementation Région de Diffa NE-PGRC-DU-22561-CW-RFB / Comp. 1: Flood Risk Single Stage - One Pending IDA / 53400 Post Request for Bids Open - National 500,000.00 0.00 2017-12-18 2017-12-23 2018-02-03 2018-03-05 2018-04-09 2018-10-06 Réalisation Piste SENO Management Investments Envelope Implementation NE-PGRC-DU-22568-CW-RFB / Comp. 1: Flood Risk Single Stage - One Pending Construction d'infrastructure IDA / 53400 Post Request for Bids Open - National 280,000.00 0.00 2017-10-02 2017-10-07 2017-11-18 2017-12-18 2018-01-22 2018-07-21 Management Investments Envelope Implementation scolaires et de sante à SENO NE-PGRC-DU-22586-CW-RFB / Comp. 1: Flood Risk Single Stage - One Pending Travaux d'Extension du réseau IDA / 53400 Post Request for Bids Open - National 430,000.00 0.00 2017-12-04 2017-12-09 2018-01-20 2018-02-19 2018-03-26 2018-09-22 Management Investments Envelope Implementation AEP à SENO NE-PGRC-DU-22589-CW-RFB / TRAVAUX DE PROTECTION Comp. 1: Flood Risk Single Stage - One Pending MECANIQUE DES BERGES DE IDA / 53400 Post Request for Bids Open - National 333,333.00 0.00 2018-03-05 2018-03-10 2018-04-21 2018-05-21 2018-06-25 2018-12-22 Management Investments Envelope Implementation KORIS (9 KORIS A NIAMEY, DO et TY + TAGABATTI ET YOURI NE-PGRC-DU-22598-CW-RFB / Réhabilitation des infrastructures Comp. 1: Flood Risk Single Stage - One Pending IDA / 53400 Post Request for Bids Open - National 83,333.00 0.00 2017-12-11 2017-12-16 2018-01-27 2018-02-26 2018-04-02 2018-09-29 scolaires dans les Régions de Management Investments Envelope Implementation Dosso et Tillabery NE-PGRC-DU-22601-CW-RFB / Travaux de construction du mur Comp. 1: Flood Risk Single Stage - One Pending IDA / 53400 Post Request for Bids Open - National 141,667.00 0.00 2017-10-02 2017-10-07 2017-11-18 2017-12-18 2018-01-22 2018-07-21 de clôture de l'Hôpital de district Management Investments Envelope Implementation de Kollo Région de Tillabéry NE-PGRC-DU-22611-CW-RFB / Travaux de construction de 10 Comp. 1: Flood Risk Single Stage - One Pending IDA / 53400 Post Request for Bids Open - National 700,000.00 0.00 2017-10-16 2017-10-21 2017-12-02 2018-01-01 2018-02-05 2018-08-04 blocs de 3 classes en matériaux Management Investments Envelope Implementation définitifs dans la Région de Diffa NE-PGRC-DU-22624-CW-RFB / Comp. 1: Flood Risk Single Stage - One Pending Travaux de construction de la IDA / 53400 Post Request for Bids Open - National 1,000,000.00 0.00 2018-02-05 2018-02-10 2018-03-24 2018-04-23 2018-05-28 2018-11-24 Management Investments Envelope Implementation Digue de DIFFA NE-PGRC-DU-22626-CW-RFB / Comp. 1: Flood Risk Single Stage - One Under IDA / 53400 Post Request for Bids Open - National 800,000.00 0.00 2018-04-02 2018-04-07 2018-05-19 2018-06-18 2018-07-23 2019-01-19 Electrification de 23 carrefours Management Investments Envelope Implementation NE-PGRC-DU-22649-CW-RFB / Comp. 1: Flood Risk Single Stage - One Under Travaux de réhabilitation des IDA / 53400 Prior Request for Bids Open - National 6,000,000.00 0.00 2017-07-28 2017-08-02 2017-09-13 2017-10-13 2017-11-17 2018-05-16 Management Investments Envelope Implementation AHA de DOSSO NE-PGRC-DU-22674-CW-RFB / Construction de Treize (13) Comp.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us